2
R90 R91
3 20/12/2021 21/12/2021 22/12/2021 23/12/2021 24/12/2021 25/12/2021 26/12/2021 27/12/2021 28/12/2021 29/12/2021 30/12/2021 31/12/2021 1/1/2022 2/1/2022
No. Name
4 Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday
The Address - COW Grace Harmony - ABP Proposal Reallocate 24 Units and Open Space Stellar Speed- ABP PT2418 - PKM documentation Dr Daniel - Reply Query No.2 + Beechwood Capital - SCM Meeting (0.375day) PT2418 - PKM documentation Stellar Speed- ABP
documentation 0.25day (25- Reconfiguration 1.5 day (0-50%) Documentation 0.5day (0-25%) 1 day (1-25%) Amend Detail Drawing (i.e. : 1 day (1-25%) Documentation 0.5day (25-
50%) Water Proofing + Kitchen Detail Tadika Jet Bestari (Setiawan) - Visit BOMBA Paya Terubong 50%)
Tadika Jet Bestari (Setiawan) - Revised and Prepare Final Lot 308, Bandar Baharu - BP AdHoc Task: + Door Schedule) (0.5day) for BOMBA plan's amendment (0.25day)
Taska Jet Gemilang & Tadika Endorsement Plan 5set (0.25day) (50-100%) Documentation 0.5day (0- Beechwood Capital - Site Kee Neng - Lot 1860 Buidable
Jet Gemilang 25%) Visit (0.375day) Taska Jet Gemilang & Tadika Yau Wei Ming - Progress Claim (0.25day) Layout + Development Data -
- Tunai Syarat (Print, cut & paste Lot 25183 &25185, Ultra Sentosa - Revised Landscape Plan based on M Jet Gemilang 0.75day (0-38%)
comment into drawing and & E drawing (0.25day) (100%) AdHoc Task: Tadika Jet Bestari - Online submit Tunai Syarat + Madam Sin Terrace House (Setiawan) - Roof Detail (0.25day)
prepare for online Tunai Syarat) Lot 25183 &25185, Ultra (Setiawan) - Additional Detail Submit hardcopy to Planning
(0.5day) AdHoc Task: Sentosa - Landscape plan Drawing (Mechanical Department (0.25day) Grace Harmony - ABP Proposal Reallocate 24 Units and Open
- Tunai Syarat documentation The Address - Collect from Engineer and submit Surat Tidak Melibatkan documentation (0.5day) (0%- Ventilation) + Amend Master Space Reconfiguration 0.875 day (50-80%)
(0.25day) Pelan Sanitari to Building Dept (0.25day) 33%) Drawing, print & cut additional Yau Wei Ming - SCM Meeting
Mechanical Ventilation to paste Minutes (0.25day)
on BOMBA plan (0.375day)
4 Jayie
Tadika Jet Bestari
(Setiawan) - PDF + Print 1 set
of Tender Drawing (0.125day)

Tadika Jet Bestari


(Setiawan) - Site Visit with
Contractor (0.25day)

8
Tok Bedu - Submit PKM plan to Grace Harmony - reply RFI Lot 308, Bandar Baharu - Building Mesra Bahagia - Bath detail (revise) + update sanitaryware Mesra Bahagia - Bath detail (revise) + update sanitaryware schedule + shower 1,5 day (0%-100%) Bay Avenue - Final checking + BP print & fold - 0.25 day (0-
PTD (0.25day) clarification to QS Detail Plan Drawing - Area Audit, Lighting & schedule + shower 1,5 day (0%-100%) 100%)
Drawing 0.5days (100%) Ventilation calculation and building spec Codrington - Return Hoarding Plan to MBPP-0.25 day
Lot 308, Bandar Baharu - (Terrace) - (1day) (37%-58%) Lot 13759, Kuala Kurau -Landscape plan documentation PTL Pokok Sena - Revised Detail : Refuse Chamber-1.75 days
Revised Landscape Plan based Mutiara Perdana 2 submit (0.5day) Follow up - pengesahan status tanah (Lot 5207 - Dato adnan + Betik manis House no + original BP (0.%-58.33%)
on street lighting plan and client purchase original BP - 0.25 status for Mutiara Perdana 2 - 0.25 day
document (0.5day) day (resubmit due to MBPP MC Lot 308, Bandar Baharu - Building Plan Drawing - Area Audit,
Za
request for additional Lighting & Ventilation calculation and building spec (Terrace) - Bedo - Send Revised PKM layout for client signatre - 0.25 day.
Lot 308, Bandar Baharu - documents) (1day) (37%-58%)
Revised Building Plan layout Bedo -Collect and Return Revised PKM plan to MBSP -0.375day
based on client comment on Evergreen Ice - pass drwg to
14/12/21(0.25day) client for signature (0.25 day) MC FRIDAY Mesra Bahagia - Scan + BP renewal online submisson - 0.375 day

8 MC

12
Lot 13759, Kuala Kurau- Lot 13759, Kuala Kurau- Lot 13759, Kuala Kurau- Building Plan Transform Electrical - Lot 308, Bandar Baharu - Lot 13759, Kuala Kurau- Lot 13759, Kuala Kurau- Lot 13759, Kuala Kurau- PLC5 - capture revision in the PLC5 - capture revision in the
Building Plan Drawing - Area Building Plan Drawing - Area Drawing - compile all BP drawing and Rezoning Layout - add 2 storey Building Plan Drawing - Area Building Plan Drawing - Area Building Plan Drawing - Area Compile, Checking and Audit for amendment BP based on amendment BP based on
Audit, Lighting & Ventilation Audit, Lighting & Ventilation checking with Hakim - (0.5day) office (0.5 day) 100% (Actual Audit, Lighting & Ventilation Audit, Lighting & Ventilation Audit, Lighting & Ventilation all type BP drawing - (0.5day) original BP (1 day) 50% original BP (1 day) 100%
calculation and building spec calculation and building spec 1day) calculation and building spec calculation and building spec calculation and building spec
(Semi-D -Type B) - (1day) (Terrace) - (1day) (85%-95%) Lot 711, Bandar baru - Revised layout (Semi-D) - (1day) (58%-79%) (Terrace) - (1day) 100% (Semi-D -Type B) - (1day) Lot 13759, Kuala Kurau-
(85%-95%) propsal (semi-D to Terrace) - 0.5day Lot 25183 &25185, Ultra 100% Landscape Plan & Carpark Plan -
(50%-100%) Sentosa - Landscape plan Replacement Task: Drawing Preparation & Checking
documentation (0.5day) (0%- Transform Electrical - for submission (0.5day)
33%) Rezoning Layout - add 2 storey
office (1day) - redeisgn
warehouse office layout with 2
9 Zakaria staircase & toilet + calculate
area

13
PTL Pokok Sena - Revised Detail : Hall - 2 days (43.75.%- Grace Harmony- reply RFI PTL Pokok Sena - Revised Detail : Hall - 2 days (68.75.%-
68.75%) clarification to QS Detail Drawing 93.75%)
0.5days (100%)

(Replacement Task R90


21/12/21)

PTL Pokok Sena - Revised


Detail : Guard House- 0.5 day
(0.%-25%)

11 Zura UN

15
Hong Seng Gallery - SCM PT 2418 : Site Visit (with Hairi): Lot 13759, Kuala Kurau - BP Lot 25183 &25185, Ultra Lot 3525, Larut Matang - Discuss with Mr. Quah on revised proposal layout (0.125day)
Meeting (0.375day) 0.5 day (0%-100%) Documentation (0.5day) (0%-25%) Sentosa - SCM Minute
Lot 3525, Larut Matang - Revised Meeting (0.25day) Lot 3525, Larut Matang - Revised proposal layout based on client comment on 9/12/2021
Lot 25183 &25185, Ultra Lot 13759, Kuala Kurau - BP proposal layout based on client (0.5day) (100%)
Sentosa - SCM Minute Meeting Documentation - Request comment on 9/12/2021 (0.5day) (100%) Mr. Fui's Project - CCM
(0.25day) document from client Add Hoc Task: Meeting (0.25day) Lot 13759, Kuala Kurau - BP Documentation (0.5day) (0%-25%)
(0.125day) Hong Seng Gallery - Contractor Material
Mr. Fui's Project - CCM Minute submission checking and comment Lot 13759, Kuala Kurau - BP Lot 13759, Kuala Kurau - BP Drawing checking (0.25day)
Meeting (0.25day) Lot 3525, Larut Matang - Lot 13759, Kuala Kurau - Checking Documentation - Request
Revised proposal layout based drawing progress and comment for BP document from client Mr. Fui's Project - CCM Minute Meeting (0.25day)
Larry's House - Discussion with on client comment on Preparation (Terrace & Shop Office) ) (0.125day)
Mr Quah on client comment 9/12/2021 (0.375day) Lot 711, Bandar Baharu - Check & Lot 13759, Kuala Kurau - Landscape Plan Documentataion (0.5day) (0-33%)
13 Hakim (0.125day) Add Hoc Task:
PT 2418 & Lot 10107 & 10108
comment layout proposal and email to
client revised proposal
AL AL Lot 3525, Larut Matang -
Revised proposal layout based Lot 13759, Kuala Kurau - Carpark Plan Documentataion (0.5day) (0-33%)
Add Hoc Task: - Collect document from MDK Larry's House - Check and comment on client comment on
Lot 308, Bandar Baharu - (0.125day) revised design proposal 9/12/2021 (0.375day) Lot 13759, Kuala Kurau & Lot 308, Bandar Baharu - BP Drawing checking & audit (0.375day)
Revised Building Plan layout Lot 13759, Kuala Kurau - Lot 25183 &25185, Ultra Sentosa -
based on client comment on Checking drawing progress and Brief, check & comment on revised
14/12/21 (Semi-D) (0.25day) comment for BP Preparation landscape plan
(Semi-D Type A & B and Lot 308, Bandar Baharu - Email Draft
Bungalow) (0.25day) BP to Engineer for column coordination
Larry's House - Briefing (1day)
Hardihairi on revised design
proposal (0.125day)
17
Lot 13759, Kuala Kurau- PT 2418 - LCP :1.5 days (50% - 100%) Sri Tanjong bina - BP - Toilet detail for BP submission (0.75 Bedo - PKM2 Layout Codrington - BP Doc -:1 day Lot 13759, Kuala Kurau- ID for Larry's office - 0.25 Evergreen Ice - PKM layout -
Building Plan Drawing - Area day) 100% (Replaced with Larry's Office - Toilet detail for floor Amendment -:0.75 day (0%-33%) Building Plan Drawing - Area day revision to layout to comply to
Audit, Lighting & Ventilation Evergreen Ice - Prepare for JKR Tunai Syarat (0.5 day) 100% (amend plans & sections, door schedule & print dwg for contractor) ID for Larry's office - 0.25 day Audit, Lighting & Ventilation 10ft setback (1 day) 40%
calculation and building spec on drain layout & print out) calculation and building spec Sri Tanjong bina - BP - Toilet
(Semi D -Type A) - (1day) (84%- Larry's House - Revised Building layout based on client (Semi D -Type A) - (1day) 100% detail for BP submission (0.75
95%) Replacement Task: comment on 14/12/21 + discussion with Mr Quah, day) 100%
Larry's House - Revised Building layout based on client comment on ammendment & Email to client (1.25day)
14/12/21 (0.5day)
14 Hardihairi

18
Lot 13759, Kuala Kurau- Lot 13759, Kuala Kurau- Jones Road - Detail drawing - amend as per commented (0.5 day) (Replaced with Schenker K3 - detail Mesra Bahagia : Green wall 3 + Green wall 3 + Feature wall 2 : Lot 13759, Kuala Kurau- Jones Road - Detail drawing - Lot 7527 &7528 - Terrace BP-
Building Plan Drawing - Area Building Plan Drawing - Area drawing final revised + pdf plot) 0.5 day 2 days (36.8% - 100%) Building Plan Drawing - Area amend as per commented (0.5 1 day (50.%-62.5%)
Audit, Lighting & Ventilation Audit, Lighting & Ventilation Note: 2 days added Audit, Lighting & Ventilation day) + hoarding & signage
calculation and building spec calculation and building spec Lot 13759, Kuala Kurau- Revised 3D design based on BP layout design confirmed by client (Shop Office, calculation and building spec detail (0.5 day) 50%
(Bungalow) - (1day) (89%-95%) (Shop Office) - (1day) (81%- Semi-D Type A & B, Terrace & Bungalow) - (2day) (Actual 1.75day) (Shop Office) - (1day) 100%
94%)
Ad hoc Task
Beechwood - Site Visit. (0.25day)
17 Zhi Ling

21
Larry Office - amend ID layout + arrange tiling layout (0.5 day) 100% Lot 349, Kg Terang - Review and Understand LCP 0.25day Codrington - BP -:2 days (89.4% - 100%) Kee Neng - Lot 619 & 762, Sek.4, SPU Land Particular Kee Neng - Lot 619 & 762,
Noted 0.87 day added + Lot 1860 , Sek.4, SPU Land Particular - check pengesahan Sek.4, SPU Land Particular
Codrington - BP -:2 days (82.63%-93.74%) Noted: 3.5 days added Lot 349, Kg Terang - Revised old format of LCP to New format zoning + JPS Reserved + ROW 0.5day (0-50%) + Lot 1860 , Sek.4, SPU
0.5day (0-16%) Land Particular - 0.5day (50-
Bus Terminal (Penas) - PKM Harcopy Submission Hardcopy MBSP (0.5day) Lot 349, Kg Terang - LCP to New format 1.5day (38-88%) 100%)
Lot 349, Kg Terang - Site Visit (0.5day)
Ad hoc Task Kee Neng - Lot 619 & 762,
18 PY Leverage Income - Follow up with all departments & identify officers in charge. (0.125day) Bus Lot 349, Kg Terang - LCP to New format 0.75day (16-41%) Buidable Layout +
Terminall (Penas) - Collect signature from Juruukur Alam, Softcopy Project Presentation Slides & CD Ad hoc Task Development Data -0.5day (0-
preparation (0.25day) Leverage Income - PBA tunai syarat (0.125day) 25%)

22

19 MY Megakulim 188 - 3D perspective B(S)3 - understanding the 2D floor plan, wall thickness, door and window size and to build the building 3D Mr Neoh's house - sketch side elevation for owner reference on the levels (0.75 day)

23