Smitcone/WO/SOIL TEST/Agnibahu/ 1 Dt 21 AUG 2023

Technoedge Research PVT LTD


Navi Mumbai

Sir,

1. In continuation of your quotation, followed by tele discussion, we are pleased to place you the job
order for subjected work. The scope of work is detailed below.

PROVISION OF ADMIN CUM OFFICE ACCN AND SINGLE LIVING ACCN FOR SAILORS’
INCLUDING GALLERY, DINING HALL AND MULTI-LEVEL PARKING AT DOCKYARD (G+21 Floors)

Rate in
Sr. Description Unit QTY AMOUNT
Rs.
No.
A) Geotechnical Investigation
Mobilization \demobilization Transportation At
1 LS 7000.00 1 7000.00
Rabale.
Labor accommodation
2 LS 16000.00 1 16000.00

Setting and shifting of rig at borehole locations.


3 Nos 1500.00 3 4500.00

Drilling, Standard Penetration Test (SPT), Collection of


4 Disturbed Sample at Identifiable Change of Strata and at Nos
Every 1.5 m Interval or More;
Collecting groundwater sample from boreholes for
5 Nos 300.00 4 1200.00
chemical analysis
Preservation of soil and rock samples in core boxes and
6 forwarding selected soil and rock samples to laboratory Nos 1500.00 4 6000.00
for lab testing.
Drilling minimum 100 mm diameter hole in all kind of
soils, Weather rock, hard rock,
as per specifications and instructions of Engineer in-
7 LS
charge and Coring in rock using NX size
double tube core barrel and diamond bit with core run
not more than 1.5 . each borehole upto 10.00 mtr depth.
Laboratory Testing on soil/Rock samples

B) LABORATORY TEST
8 Moisture contents /Dry density
9 Atterberg limit 21000.00 4 84000.00
10 Specific gravity
11 Grain size analysis
Cell : 040-29700894,+91-9642229416
Email : smitcone@gmail.com
scchoudhary@gmail.com

No-8, Villa Grande, Dandamudi Road, Pet Baseerabad, Jeedimetla, Hyderabad – 500 067
GSTIN :36ABXPC5796R1ZD , PAN : ABXPC5796R

Conducting Laboratory Tests on collected ROCK SAMPLES


12
as per relevant IS codes and Submission of detailed reports ( 5
copies ) consisting of each and every detail, location, bore hole
profiles , bore log graphs and cross section, description of soil
strata, laboratory and field test results, comments and
recommendations on suitable foundation etc. complete all as
specified and as directed.
Recommendation for Pile Foundation and Isolated footings.
13 Density test
14 Water absorption & Porosity
15 Unconfined compression test on Rock
Chemical analysis on Soil & Ground Water ((pH, Sulphate,
16
Chloride)

Amount 118700.00
CGST 9% 10683.00
SGST 9% 10683.00
Total 140066.00
Amount
Ruppes One lakh Forty Thousand Sixty Six Only /-

2. The work will be started within a 7 Days on receipt of work order.


3. 40% payment as advance after setting up of equipment on site. Remaining after submission of final
report.
4. Total work will be completed within 3 weeks of placing order.
Thanking you