SAUDI ARAMCO ID/PID - REV 1 - 3/01/05 (Standards Cutoff - August 2004)

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
Cable Tray, Fittings, and Accessories SATIP-P-104-03 1-Oct-05 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Not Applicable
RECEIVING
2.0
INSPECTION
Cable Tray
2.1 Storage, Handling, and Preservation SAIC-P-3301 SAIC-P-3301 W2 S Weekly Inspection by Contractor QC
Visual Inspection
Cable Tray
SAIC-P-3302 Metallic Tray Systems
2.2 Material Receiving See Remarks See Remarks H1 W1
Visual Inspection

SAIC-P-3304 Metallic Tray Accessories


SAIC-P-3005 Channel and Strut Materials
SAIC-P-3309 Firewall Barriers

Cable tray accessories include bulk mechanical


fasteners, splice plates, end plates, drop-out plates,
barrier plates, hinged joints, expansion joints, covers,
Cable Tray
clips, clamps, straps, banding materials, and banding
Accessories
2.3
Material Receiving
See Remarks See Remarks H1 W2 tools. Channel and strut materials include all
mechanical fasteners, anchors, threaded rods, fittings,
Visual Inspection
and brackets required to provide full-load-rated
supplemental supports. Fire barrier materials include fire
rated mortar, intumescent sealing, fire-rated silicone
foam, and component thru-wall barriers.

Notify SA by RFI within 24 hours of initial receipt of each


listed accessory (by type or manufacturer).

Page 1 of 3
11/27/2005 3:14 PM
SAUDI ARAMCO ID/PID - REV 1 - 3/01/05 (Standards Cutoff - August 2004)
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Cable Tray, Fittings, and Accessories SATIP-P-104-03 1-Oct-05 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Jobsite type-testing of cable tray load rating. Required


Metallic Cable Tray
SATR-P- on absence of factory / third party test reports and
2.4 Jobsite Acceptance Test SATR-P-3301
3301
H2 H2 manufacturer's nameplate identification. Hold point prior
NEMA VE1 Static Loading
to cable tray installation.

3.0 INSTALLATION

Hold points prior to pre-fabricated supplemental support


Cable Tray Supports installation and cable tray installation.
3.1 Fabrication and Installation SAIC-P-3006 SAIC-P-3006 H1 W2
Visual Inspection SA PID to be notified on start of installation for each
process system or plant area.

SAIC-P-3307 Metallic Tray Systems


SAIC-P-3308 Non-Metallic Tray Systems
Cable Tray Installation
SAIC-P-3309 Fire Barrier
and Identification Numbering
3.2
Visual Inspection
See Remarks See Remarks H1 W2 See SATIP-P-111-01 Grounding and Bonding
Hold point prior to cable pulling. SA PID to be notified on
(Before Cable Pulling)
start of tray installation for each process system or plant
area.

4.0 PRE-COMMISSIONING

SAIC-P-3307 Metallic Tray Systems


SAIC-P-3309 Fire Barrier
Cable Tray
See SATIP-P-111-01 Grounding and Bonding
4.1 Visual Inspection See Remarks See Remarks H1 W2 Hold point prior to tray cover installation. SA PID to be
(Before Cover Installation)
notified on start of inspection for each process system or
plant area.

Page 2 of 3
11/27/2005 3:14 PM
SAUDI ARAMCO ID/PID - REV 1 - 3/01/05 (Standards Cutoff - August 2004)
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Cable Tray, Fittings, and Accessories SATIP-P-104-03 1-Oct-05 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

SAIC-P-3307 Metallic Tray Systems


SAIC-P-3309 Fire Barrier
Cable Tray
See SATIP-P-111-01 Grounding and Bonding
4.2 Final Visual Inspection See Remarks See Remarks H1 W2 Hold point prior to fireproofing. SA PID to be notified on
(Before Fireproofing)
start of final inspection for each process system or plant
area.

GENERAL NOTES

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
W1 100% Witness Inspection/Test H2 Sample Hold Point for QC Inspection or Test RH1 100% Review and Approval of Documents
W2 Sample Witness Inspection/Test R1 100% Review of Documents RH2 Sample Review and Approval of Documents
H1 100% Hold Point for QC Inspection or Test R2 Sample Review of Documents S Surveillance

Page 3 of 3