You are on page 1of 3

Student Asses ement - Attachment

FORM F-07.2 VERSION


1. ARCP CPCCDE3015
Tectra AUTHORISED BY: Camps ance Offic REVISION DATE. 17/09/2021

Attachment 2 - Asbestos Removal Control Plan (Prac 182)


Date of Removal

License Number 7 4/.7/21


Name/Address of removal site © Domestic O School • Industrial
O Public Venue
Name of Removalist/s Construction Induction number Asbestos Training conducted?
(White Card)

Riarda 2977677
Seth lattin 2634976
Nick Bennett 000520333202
Manu Madden 0018593
Consultation And Notification

Has the notification requirements been met with the State Regulator? I Yes O No

Is the required documentation available on site? DYes O No


1 Removal License D Asbestos Register
Have you consulted and notified any people who may be affected by the removal work and any other
releyant parties? E.g. HSR Reps, workers, person who commissioned the removal work, neighbours?

" Yes a No
How have you notified people affected by the removal work? E.g. letterbox drop?

Details Of ACM To Be Removed

ACM Type (e.g. Friable or Non


Super Six Location Condition Quantity (m2)
Friable?
sheeting)

COR D: n' Fals 20


Pees GO
Til
Preparation For Removal
K:to
Has roles and responsibilities been assigned for removal job? © Yes O No

Removal Commencement Date 24/ 7, 2027 Removal Completion Date 24 / _7/2021

Are their Emergency Plans in place? Yes O No


FORM F-07.2 CROCDE 1015 VERSION
17/09/2021
Tectra AUTHORISED BY REVISION DATE

Asbestos Removal Boundaries

Are there any isolations required? O Yes O No


Please detail:

What barriers and signage will be used for the removal job?

Please detail:

Risk Management

What hazards are present, and what controls are to be put in place to minimise the risk?

What other risk control measures will be used to prevent the release of airborne asbestos fibres from the
area where asbestos removal is undertaken?

Personal Protective Clothing

What PPE and RPE will be used in this removal job?

[ Half Face Respirator • Eye protection


• Disposable coveralls• Respirator (P1)
• Non-Disposable • Respirator (P2) O Full Face Respirator • Booties
coveralls

Other. O Fit Checks • Gumboots


• Respirator (P3) completed

Removal
What method of removal will be used?

O Wet method D Dry method • Saturation and Water Injection Method

• Enclosure Enclosure details:

What tools will be used in the removal job?

• НЕРА vacuum © Spray bottle • Drop sheet • Waste bag

• Wet - wipe • Sealant O Scraper • Waste container

Other: Other: Other: Other:

Are any temporary buildings required e.g. decontamination units? O Yes O No


If yes, please details:

2
Student Assessment - Altachment
FORM F-07.2 2 - ARCP CPCCDE3015 VERSION
Tectra AUTHORISED BY: Compilance Officer REVISION DATE: 17/09/2021

Where will waste storage be kept on site?

Decontamination Procedures

Site

Personal
Decontamination

Tools and Equipment

Non-Disposable PPE &


RPE
Waste Disposal
How will you dispose of PPE?

Waste disposal site:

Route to waste disposal


site:
Clearance and air monitoring

Name of independent licensed asbestos assessor or competent person (if


required): El Latest