DRAFT PROJECT OH&S PLAN

Al Hofuf Township - Earthwork, City Experience Centre, Road Infrastructure,


Packages of Villas and Infrastructure
Aconex Ref# 00501-DAE-PLN-00005
Ref. No: 01
Date: NOV 28, 2022

PROJECT IDENTIFICATION / SIGN-OFF


PROJECT CODE CW 105

PROJECT TITLE AL HOFUF TOWNSHIP SUPERVISION SERVICES

CLIENT ROSHN REAL ESTATE COMPANY


APPROVAL HISTORY Prepared By Reviewed By Verified by Approved By

Yasir Khan Abdulaziz AlTuwalah Salman Sami Khan


CLIENT / ROSHN
(Supervisor) (Manager, Projects) (QHSE Manager)

SIGNATURE

Document history

Revision code Description of changes Purpose of issue Date


00 First issue For Approval 10- Sep-2022
01 Second issue For Approval 28- Nov-2022

Controlled Copy

Uncontrolled Copy

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE1 OF 118


Contents

1. ACRONYMS............................................................................................................................................................ 7
2. DEFINITIONS........................................................................................................................................................... 9
3. PURPOSE AND CONTEXT..................................................................................................................................... 15
1..1 Purpose..................................................................................................................................................................... 15
1..2 Objectives................................................................................................................................................................. 15
4. ROSHN PROCEDURE............................................................................................................................................ 15
5. INTRODUCTION................................................................................................................................................... 16
1..1 Project Details.......................................................................................................................................................... 17
1..2 Project Contact Details............................................................................................................................................. 17
1..3 The objective............................................................................................................................................................ 17
1..4 Scope of Works......................................................................................................................................................... 17
1..5 Project Location........................................................................................................................................................ 18
6. HSE POLICY, OBJECTIVES & TARGETS................................................................................................................. 21
1.1. Health and safety and environmental Objective and targets.......................................................................21
7. ROLES AND RESPONSIBILITIES FOR HSE.............................................................................................................27
1..1 Organization chart.................................................................................................................................................... 28
1.2. OHSE Key Person Contact Details.............................................................................................................33
1.3. Project Manager........................................................................................................................................... 33
1.4. Resident /Discipline Engineers................................................................................................................... 33
1.5. HSE Manager.............................................................................................................................................. 34
1.6. HSE Engineers / Supervisors...................................................................................................................... 34
1.7. Contractor responsibilities........................................................................................................................... 34
1.8. Site Employees Responsibilities................................................................................................................. 35
8. LEGAL & OTHER REQUIREMENTS....................................................................................................................... 36
1.9. General........................................................................................................................................................ 36
9. HAZARD IDENTIFICATION, RISK ASSESSMENT & CONTROL..............................................................................36
1..1 Risk Register............................................................................................................................................................. 36
1.10. Risk assessment and Method Statement.....................................................................................................36
1.11. Job Hazard Analysis (JHA) – Risk Assessment.........................................................................................37
10. HAZARD COMMUNICATION............................................................................................................................... 37
1..1 Hazardous Chemicals Exposure Control.................................................................................................................. 37
1..2 Hazardous Substances Storage and Handling..........................................................................................................37
1..3 Chemical Disposal..................................................................................................................................................... 38
1..4 Material safety data sheets – Inventory.................................................................................................................. 38
1..5 The disposal of waste material under the site waste management plans..............................................................38
11. EMERGENCY RESPONSE AND MEDICAL SUPPORT.............................................................................................39

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE1 OF 118


1..1 Response / Rescue Equipment................................................................................................................................. 39
1..2 Personal Injury.......................................................................................................................................................... 40
1..3 Fire / Explosion/Spillage........................................................................................................................................... 40
1..4 Road traffic Accident / Security Incident................................................................................................................. 40
1..5 DAR ENGINEERING Emergency / Incident Calling tree............................................................................................40
1..6 First Aid clinic, Ambulance....................................................................................................................................... 41
1..7 Pre-Medical Inspection............................................................................................................................................ 43
1..8 First Aid Boxes.......................................................................................................................................................... 43
1..9 Assembly points....................................................................................................................................................... 44
1..10 Frequency of emergency response drills...............................................................................................................44
1..11 Site layout plan in case of emergency................................................................................................................... 44
12. INCIDENT REPORTING, RECORDING AND INVESTIGATION...............................................................................44
1..1 DAR ENGINEERING Incident Notification calling Tree.............................................................................................44
1..2 Incident Reporting procedure.................................................................................................................................. 44
1..3 Injury and Damage Reporting.................................................................................................................................. 46
1..4 Near Miss reporting.................................................................................................................................................. 46
1..5 Incident Investigation process................................................................................................................................. 46
1..6 Steps involved in investigating an accident.............................................................................................................47
1..7 When looking at as the cause of an accident.......................................................................................................... 48
Accident causations models............................................................................................................................................ 48
1..8 Task 48
1..9 Material.................................................................................................................................................................... 48
1..10 Environment........................................................................................................................................................... 49
1..11 Personnel................................................................................................................................................................ 49
1..12 Management.......................................................................................................................................................... 49
1..13 Physical Evidence................................................................................................................................................... 50
1..14 Eyewitness accounts.............................................................................................................................................. 50
1..15 Interviewing............................................................................................................................................................ 51
1..16 Background information........................................................................................................................................ 52
1..17 Knowing the factors when making the analysis and conclusions.........................................................................52
1..18 Making recommendations..................................................................................................................................... 52
1..19 Closeout.................................................................................................................................................................. 53
1..20 Injury and damage reporting................................................................................................................................. 53
13. HSE PERFORMANCE MONITORING, INSPECTION AND REVIEW.......................................................................54
1..1 Construction and HSE staff daily checks.................................................................................................................. 54
1..2 HSE Inspection.......................................................................................................................................................... 54
1..3 Senior Management HSE Tours................................................................................................................................ 54

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE1 OF 118


1..4 HSE Process Assessment Audits............................................................................................................................... 55
1..5 Methods of corrective action tracking and closeout...............................................................................................55

1..6 Performance Measurement and Reporting.............................................................................................................55


1..7 HSE Plan Review....................................................................................................................................................... 55
14. VEHICLES, PLANT & EQUIPMENT INSPECTIONS.................................................................................................56
1..1 Equipment inspection.............................................................................................................................................. 56
1..2 Third Party Inspections............................................................................................................................................. 56
1..3 Color-Coding/ Inspection Tagging Systems..............................................................................................................56
1..4 Record and Maintenance......................................................................................................................................... 56
1..5 Equipment requirements......................................................................................................................................... 56
15. SAFETY DEVICES........................................................................................................................................... 57
16. CONSULTATION AND COMMUNICATION................................................................................................57
1..1 HSE Meeting Schedule............................................................................................................................................. 57
1..2 Posters / Bulleting board.......................................................................................................................................... 59
1..3 STARRT process........................................................................................................................................................ 59
1..4 Weekly toolbox Talk................................................................................................................................................. 59
1..5 Notice Boards........................................................................................................................................................... 60
17. HSE TRAINING...................................................................................................................................................... 60
1..1 General..................................................................................................................................................................... 61
1..2 Safety Induction/ Orientation.................................................................................................................................. 61
1..3 Visitors Orientation.................................................................................................................................................. 62
1..4 Supervisor HSE Training........................................................................................................................................... 62
1..5 Health hazards – Subcontract specific..................................................................................................................... 63
18. SUBCONTRACTOR MANAGEMENT..........................................................................................................63
19. PERMIT TO WORK.......................................................................................................................................... 64
20. EXCAVATION PERMIT (BROWN COLOR)................................................................................................65
UNDERGROUND UTILITIES.................................................................................................................................... 67
EXCAVATION WORK POSSIBLE LIST OF ACTIVITIES...................................................................................67
21. CONFINED SPACE ENTRY........................................................................................................................... 68
22. CRANE, ELEVATED WORK PLATFORMS & LIFTING EQUIPMENT..................................................71
LIFTING WORK PERMIT (BLUE COLOR)............................................................................................................ 71
LIFTING WORK POSSIBLE LIST OF ACTIVITIES..............................................................................................71
23. ELECTRICAL PERMIT/ LOTO...................................................................................................................... 72
ELECTRICAL INSTALLATIONS AND EQUIPMENT...........................................................................................72
24. OVERHEAD TRANSMISSION / POWER LINES.......................................................................................76
1..1 General..................................................................................................................................................................... 77
25. WORK AT HEIGHT PERMIT (ORANGE COLOR).....................................................................................78
26. FALL ARREST & WORK RESTRAINT SYSTEMS, NETS & ROPE ACCESS STANDARD............78

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE1 OF 118


27. HORIZONTAL LIFELINES / RUNNING LINES..........................................................................................79
28. VERTICAL LIFELINES / RETRACTABLE LIFELINES.............................................................................79
ROPE ACCESS........................................................................................................................................................... 80
29. ROOFING & FRAGILE SURFACES & OPENINGS STANDARD...........................................................80
WORK AT HEIGHT POSSIBLE LIST OF ACTIVITIES........................................................................................81
30. HOT WORK PERMIT (RED COLOR)...........................................................................................................82
HOT WORK POSSIBLE LIST OF ACTIVITIES.....................................................................................................82
31. COLD WORK PERMIT (GREEN COLOR)..................................................................................................83
COLD WORK POSSIBLE LIST OF ACTIVITIES..................................................................................................83
32. SITE SAFETY RULES..................................................................................................................................... 83
1..1 General Site Rules.................................................................................................................................................... 83
1..2 Life Critical Rules...................................................................................................................................................... 84
1..3 DAR Engineering Disciplinary Procedure................................................................................................................. 85
33. MANAGEMENT CONTRACTOR............................................................................................................................ 85
34. REWARDS AND RECOGNITION........................................................................................................................... 85
35. STOP WORK PROCEDURE.......................................................................................................................... 86
1..1 Authority................................................................................................................................................................... 86
1..2 Work Suspension...................................................................................................................................................... 86
1..3 Corrective Action...................................................................................................................................................... 86
36. MANAGEMENT OF CHANGE............................................................................................................................... 86
1..4 Responsibilities......................................................................................................................................................... 87
37. WELFARE AND SANITARY FACILITIES..................................................................................................................87
1. RATIO OF TOILET........................................................................................................................................... 87
2. TOILETS/URINALS AND WASHBASIN RATIO CHART.........................................................................87
3. REST SHELTER............................................................................................................................................... 87
4. PORTABLE WATER........................................................................................................................................ 88
5. WASTE CONTROL.......................................................................................................................................... 88
6. CLEANING OF FACILITIES........................................................................................................................... 88
38. PERSONAL PROTECTIVE EQUIPMENT.................................................................................................................88
1..1 Introduction.............................................................................................................................................................. 88
1..2 Purpose..................................................................................................................................................................... 89
1..3 Responsibilities......................................................................................................................................................... 89
1..4 Mandatory PPE......................................................................................................................................................... 89
1..5 Task Specific PPE...................................................................................................................................................... 89
1..6 Issue and Maintenance of PPE................................................................................................................................. 89
39. OCCUPATION HEALTH......................................................................................................................................... 89
1..1 Pre work Medical Assessment................................................................................................................................. 89
1..2 Pre-Employment medical and monitoring...............................................................................................................89

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE1 OF 118


1..3 Plant and equipment operator medicals................................................................................................................. 90
40. NIGHT WORKS..................................................................................................................................................... 90
41. HEAT STRESS........................................................................................................................................................ 90
1.1. Acclimatization Process for New comers inside Kingdom of Saudi Arabia..............................................90
42. PERSONAL PROTECTIVE EQUIPMENT (PPE).......................................................................................................91
43. NOISE AND VIBRATION....................................................................................................................................... 92
44. MEPI.................................................................................................................................................................... 93
45. SCAFFOLDING................................................................................................................................................. 93
46. LADDERS.......................................................................................................................................................... 96
47. PLANT AND EQUIPMENT CONTROL....................................................................................................................96
48. HOUSEKEEPING............................................................................................................................................. 97
49. FIRE PREVENTION AND CONTROL MEASURES...................................................................................................97
50. ENVIRONMENTAL STANDARDS........................................................................................................................ 100
51. AIR QUALITY STANDARD.................................................................................................................................. 100
52. DUST CONTROL........................................................................................................................................... 101
53. CONSERVATION................................................................................................................................................. 102
54. AIR QUALITY MONITORING...................................................................................................................... 103
55. NOISE MONITORING.................................................................................................................................... 103
56. WATER QUALITY MONITORING...............................................................................................................103
57. NOISE & VIBRATION PROTECTION........................................................................................................104
58. PROTECTION OF SOIL & GROUNDWATER STANDARD..................................................................105
59. WASTE MANAGEMENT STANDARD.......................................................................................................107
60. ATTACHMENTS............................................................................................................................................. 108

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE1 OF 118


1. Acronyms:

Acronym Definition

DAR DAR INTERNATIONAL ENGINEERING CONSULTANCY

RRE ROSHN Real Estate

MOI Ministry of Interior

H&S Health and Safety

HSSE Health, Safety ,Security and Environment

ALS Advanced Life Support

BS British Standard
ALARP As Low as Reasonably Practicable

BU Business Unit

D&B Design and Build

ESC Erosion and Sedimentation Control

HSE Health, Safety and Environment


HSEMS Health Safety Environment Management System

IAQ Indoor Air Quality

IR Incident Reporting

ISO International Organization for Standardization


ITS Intelligent Transportation System

KPI Key Performance Indicator

LEED Leadership in Energy and Environmental Design

LSR Life Saving Rules


MSDS Material Safety Data Sheet

OHSEAS Occupational Health and Safety Assessment Series

PM Project Manager
ROSHN Executive Project Management

PPE Personal Protective Equipment

TBT Tool Box Talk

COSHH Control of Substances Hazardous to Health

GOSI General Organization for Social Insurance

HV High Voltage

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE1 OF 118


ISO International Organization for Standardization

KSA Kingdom of Saudi Arabia

LTI Lost-Time Injury

LV Low Voltage

MOH Ministry of Health

MV Medium Voltage

OSHA Occupational Safety and Health Administration

PPE Personal Protective Equipment

RAMS Risk Assessment and Method Statement

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE1 OF 118


2. Definitions:

Term Definition

Any unplanned event, or chain of events, which has resulted in actual injury, illness,
Accident damage, or loss.

As Low as
The principle of reducing the residual risk as far as reasonably practicable.
Reasonably
Practicable
The ability to perform a particular job in compliance with performance standards, in
Competency
possession of required skills, knowledge, qualification(s), and/or capacity(s).

A person or outsourced resource or firm engaged by RRE to perform a service or to


Contractor
complete a scope of works.

An action taken to eliminate the cause of a detected nonconformity or other undesirable


Corrective Action
situation.

A critical event, which, if not handled in an appropriate manner, may dramatically impact an
organization’s profitability, reputation, or ability to operate and/or, an occurrence and/or
Crisis
perception that threatens the staff, shareholder value, stakeholders, brand, reputation, trust
and/or strategic business goals of an organization

Incidents with a high potential to cause death or serious injury, but which happen relatively
Dangerous Occurrence
infrequently.

A non-routine situation that necessitates prompt action, primarily to mitigate a hazard or


adverse consequences for human health and safety, quality of life or property. This includes
Emergency emergencies such as fire, release of hazardous chemicals, storms or earthquakes. It also
includes situations for which prompt action is warranted to mitigate the effects of a
perceived hazard.
Emergency The capability to take actions that will effectively mitigate the consequences of an
Preparedness emergency.

The employment injury is any accident suffered by the contributor during performance or
by reason of work. Also, the employment injury is any accident suffered by the contributor
on its way from its dwelling to its workplace and back, or on its way from its workplace to
the place where he usually takes its meal or gives its prayer and back. Also, the
Employment Injury
employment injury is any accident suffered by the contributor during movements he makes
for the purpose of doing an assignment required by the employer. Also, the employment
injury is any disease established to be caused by work as well as the occupational disease
duly determined in accordance with the Schedule of Occupational Diseases. (GOSI)

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE1 OF 118


Emergency Response A plan that describes the processes and procedures to guide employees in a safe, timely, and
Plan effective response to incidents that threaten public health, safety or welfare.

Environmental Aspect An element of an organization’s activities, products, or services that can interact withthe
environment

Environmental incidents are classed in 3 subcategories, Major (irreversible impacts causing


significant pollution and significant health risks), Moderate (reversible impacts causing
moderate pollution and moderate health risk), Minor (easily reversible impacts causing no
pollution outside the site and with no resulting health risks).
Typical environmental incidents include:
• Air Pollution – Significant Emissions Resulting from Fire
• Air Pollution – Lack of Dust Suppression
• Air Pollution – Engine Emissions
• Water Pollution – Significant Spill of Hazardous Substances
Environmental Incident
• Water pollution – Contaminated Water
• Discharge to Sewers / Storm Water
• Ground Pollution – Significant Spill of Hazardous Substances
• Ground pollution – Contaminated Water Spillage
• Waste – Illegal Disposal of Hazardous Waste
• Waste – Illegal Dumping / Failure to Contain General Waste
• Waste – Discovery of Hazardous Waste (e.g. Excavation / Demolition)
• Damage to Natural Environment – Flora / Fauna
• Damage to Historical / Heritage or Artefact

Death resulting from a work-related injury or illness, regardless of the time


Fatality (work related)
intervening between injury and death.

First Aid Case An incident that results in first aid being administered.

Any substance, physical effect or condition with potential to harm people, property,
Hazard
environment or reputation.

Hazard Identification The process of recognizing that a hazard exists and defining its characteristics.

Health and A physical onsite verification that work is performed, equipment is maintained, and site is
Safety Inspection operated in accordance with the existing health and safety standards and procedures.

Health and A dedicated meeting dealing specifically with health and safety issues only that is formally
Safety Meeting recorded with minutes.

The continuous, systematic collection, analysis and interpretation of health-related data


Health Surveillance
needed for the planning, implementation, and evaluation of public health practice.

Heat Stress Case A work-related incident resulting to an individual suffering from the effects of heat stress.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE10 OF 118


A quantitative, semi-quantitative or qualitative representation of the effect (negative or
Impact
positive) on a planned activity or desired outcome as a result of an unplanned event.

Incident Any unintended event or situation that may lead to a disruption, loss, emergency or crisis.

Injury Any damage or harm done to or suffered by a person

Key Performance A quantifiable measure used to evaluate the success of an organization and employee in
Indicator meeting objectives for performance.

Leading Indicators Metrics that signal future events.

Any chain sling, lifting frames, or similar gear, and any ring, link, hook, plate clamp, shackle,
Lifting Gear
swivel or eye bolt.

Lost time injuries result from any injury leading to more than 1 full day
Lost-Time Injury off work. Lost time is only applicable where time off work following an injury has been
approved by a registered medical practitioner (Nurse / Doctor)

Lost Workday LTI's are classed in 2 subcategories, those over 3 days (i.e. 4 days or more lost time) and
Case those up to and including 3 days lost time.

A serious and unexpected situation involving illness or injury and requiring immediate
Medical Emergency
medical attention and cannot be resolved by administering first aid.

Minor injuries include medical treatment cases (MTC) where treatment for minor injuries is
provided at a hospital or site clinic by a registered medical practitioner, but the injured party
returns to work within 24 hours.
Minor injuries include restricted work cases (RWC) where treatment for minor injuries is
provided at a hospital or site clinic by a registered medical practitioner, but the injured party
returns to work within 24 hours and takes up light or restricted duties.
Minor Injuries
Minor injuries include journey incidents where an injury occurs during working hours on a
journey (e.g. by car) related to a work activity.
Typical first aid injuries on construction sites include minor cuts, abrasions and bruises,
minor eye injuries / irritations from particles and dust, muscle strain, sprains and general
knocks and scrapes from materials and hand tools.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE1 1 OF 118
Near misses / Dangerous Occurrences are events that could have resulted in injury or
damage to property or harm to the environment.
A dangerous occurrence means an incident in relation to a workplace that exposes a
worker or any other person to serious risk to a
person’s health or safety emanating from immediate or imminent exposure to:
Near Miss/
• Uncontrolled escape, spillage or leakage of a substance
Dangerous
• uncontrolled implosion, explosion or fire
Occurrence
• Uncontrolled escape of a pressurized substance
• Electric shock
• Fall or release from a height of any plant, substance or thing
• Collapse or partial collapse of a structure
• Collapse or failure of an excavation or any shoring supporting an excavation

Incidents or Dangerous occurrences are incidents resulting in non- injury events such as
fires and / or damage to property / plant etc. or incidents that could have resulted in
significant injury. Typical dangerous occurrences include:
• Collapse of formwork or load bearing structure
• Collapse of scaffold or false work (Shoring Systems)
• Collapse, failure or misuse of lifting equipment and / or accessories
• Collapse of excavation
• Flooding of excavation or confined space
Non-Injury Incidents • Contact with overhead / underground services
• Electrical short circuit or overload causing a fire
• Failure of compressed gas cylinders
• Fire or explosion
• Failure of radiography equipment
• Malfunction of breathing apparatus
• Vehicle / plant collision or damage
• Damage - Damage to plant / equipment / property
• Damage – falling / flying objects

An assessment finding which when left uncorrected may lead to nonconformity, incident, or
Observation
accident.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE1 2 OF 118
Occupational Illnesses are work related specified illnesses, conditions and or diseases. Typical
occupational illness includes:
• Skin disease or disorder (e.g. contact dermatitis)
• Respiratory condition
• Poisoning (ingestion / absorption of toxic substances)
• Hearing loss
Occupational Illness • Hand / Arm Vibration
/ Disease • Heatstroke / Heat Stress
• Exposure to radiation
• Contagion by blood borne pathogens
• Silicosis / Asbestosis
• Legionella
• Leptospirosis
• Cancer

Opportunity for
An assessment finding which may improve system performance or efficiency.
Improvement

Any work-related injury which results in the complete loss, or permanent loss of use, of
Permanent Partial
any part of the body, or any permanent impairment of function of parts of the body,
Disability
regardless of any pre-existing disability of the injured member or impaired body function.

Permanent Total Any work-related injury which permanently incapacitates an employee and results in
Disability termination of employment.

An action taken to eliminate the cause of a potential nonconformity or other potentially


Preventive Action
undesirable situation.

An incident that results in damage to tools and equipment, machinery, installations, plant,
Property Damage Case
motor vehicles or any other property located on site that did not result in personal injury.

A work-related injury or illness that results in limitations on work activity that prevent an
Restricted Work Case individual from doing any task of its/her normal job or from doing all of the job for any part
of the day.

The injured person or the one who acts on its behalf notifies in writing the employer within
seven days after the injury’s occurrence, deterioration or complication takes place or the
disease is discovered. The employer or the one who acts on its behalf notifies in writing the
Reportable Injury
appropriate office of the employment injury for which first-aid is insufficient, within three
days after he is informed of the injury or takes note of this occurrence. Such notification
should be submitted in Form No. 10/Occupational Hazards (GOSI)

An uncertain event which, should it occur, would impact positively or negatively on the
Risk
outcome of defined objectives.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE1 3 OF 118
The process of determination of risk, usually in a quantitative or semiquantitative manner.
It is an evaluation of the likelihood of undesired events and the likelihood of harm or
damage being caused together with the value judgments made concerning the significance
Risk Assessment
of the results. Risk assessment is also a process of examination, ranking and prioritization of
potential hazards and exposures in the work environment, to guide the implementation of
suitable risk control measures.

Training The action of teaching a person a particular skill or type of behaviors.

Any physical location in which work-related activities are performed under the control of
Worksite
RRE, also called site.

Cold Work Permit


Excavation Work Permit
Work Permit System Hot Work Permit
Lifting Operation Permit
Work at Height Permit

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE1 4 OF 118
3. Purpose and Context
1..1 Purpose

The objective of this Occupational Safety and Health and Environmental Management Plan (HSE PLAN)
is to emphasize that the protection of people is of paramount importance to the success of this project.
The HSE PLAN describes the occupational safety and health management program for the team supervising
the Hofuf Earth works Safety Improvements project. It details how to meet the requirements of the
Scope of Services legal and the Employer’s occupational safety and health requirements in the ROSHN
Projects according to ROSHN HSSE Manual (RRE-HC-HC1-A00-NSP-RRE-HSEMAN-00001).
This HSE PLAN addresses aspect of design, excavation, and construction activities at sites (referred to as
the Working Area) that are likely to give rise to:

• A risk of injury of construction workers, visitors, and members of local communities; and
• A risk of illness among construction workers.

Contractor has to develops this HSE PLAN that meets or exceeds the requirements of ROSHN HSSE MANUAL
(RRE-HC-HC1-A00-NSP-RRE-HSEMAN-00001).
A Construction Environmental & Social Management Plan (CESMP) has been developed to address
Contractor requirements to reduce significant impact to the environment and property.

1..2 Objectives

The objectives of the HSE PLAN are as follows:


(i) Ensure a systematic approach to management of Occupational Safety and Health
and Environment;
(ii) Manage risk associated with the construction activities;
(iii) Establish training programs for all staff appropriate to task, role and the project requirements;
(vi) Provide a structure to ensure that Safety and Health issues are effectively managed in a
consistent and integrated manner; and
(v) Ensure a safe workplace for all those who work on the project. "

4. ROSHN Procedure
The below procedures from ROSHN HSSE manual and to be followed accordingly.

9.1 An Index of HSSE Procedures is as follows:


Reference Title
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00001 Accident Notification, Reporting & Recording
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00002 Hazardous Work Permits
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00003 Stored Energy - Lockout / Tagout
10. Occupational Health Standards
10.1 An Index of Occupational Health Standards is as follows:
Reference Title
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00004 Construction Site Welfare
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00005 Control of Substances Hazardous to Health
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00006 Hot & Cold Injuries
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00007 Manual Handling Operations
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00008 Medical Services & Management

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE1 5 OF 118
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00009 Noise & Vibration Management
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00010 Occupational Health Surveillance
11. Safety Standards
11.1 An Index of Safety Standards is as follows:
Reference Title
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00011 Confined Space Management
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00012 Construction Plant & Vehicle Management
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00013 Detection of Buried Services
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00014 Engineering & Vehicle Workshops
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00015 Excavations & Trenching
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00016
 Fall Arrest & Work Restraint Systems, Nets & Rope Access
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00017 Fire Prevention & Protection
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00018 General Safe Working Practices
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00019 Hot Works
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00020 Lifting Operations
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00021 Lightweight Staging, Trestles, Ladders & Steps
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00022 Man-Lifts
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00023 Office Safety
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00024 Personal Protective Equipment
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00025 Roofing & Fragile Surfaces & Openings
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00026 Scaffolding
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00027 Stability of Structures
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00028 Storage of Materials
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00029 Temporary Electrical Safety
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00030 Working at Height
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00031 Working Platforms
12. Environmental Standards
12.1 An Index of Environmental Standards is as follows:
Reference Title
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00032 Air Quality
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00033 Conservation
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00034 Environmental Monitoring
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00035 Noise & Vibration Protection
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00036 Soil & Groundwater
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00037 Waste Management
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00038 Water Quality

Additionally include the project security standards to ensure the protection and security of project.

13. Security Standards


13.1 An Index of Security Standards is as follows:
Reference Title
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00039 Access Control
 RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00040 Traffic Management

5. Introduction
Saudi Arabia’s sovereign Public Investment Fund (PIF), has launched a real estate company
called “Roshn”, which is specialize in developing integrated urban neighborhoods containing
residential communities with modern standards across the Kingdom of Saudi Arabia. Roshn
aims to meet the

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE1 6 OF 118
demand for new housing supply, develop integrated neighborhoods, localize international best practices,
incorporate the latest technologies in construction and enhance the quality of life in various parts of the
kingdom

1..1 Project Details

Project Name Al Hofuf Earth Work

Client ROSHN REAL ESTATE COMPANY


Consultant DAR INERNATION ENGINEERING CONSULTANCY

1..2 Project Contact Details:

NAME POSITION COMPANY CONTACT


ENG, BASHIR ALBITTAR Sr, Resident Manager DAR ENGINEERING +966 59 671 3466
/Project Manager
ENG ASHRAF ALBELTAGY Resident Engineer DAR ENGINEERING +966 50 381 5752
YASIR KHAN HSE Supervisor DAR ENGINEERING +966508182736
NASSER MACAPASER ENGINEER QA / QC DAR ENGINEERING +966 58 048 6251
MOHAMMED BASHARAT DOCUMENT CONTROLLER DAR ENGINEERING +966 534403248

1..3 The objective

The main objective of this plan is to ensure that all operations carried out within the Project are
managed in compliance with all applicable H&S local regulations, Roshn HSSE requirements, DAR HSSE
management system requirements and based on ISO45001:2018 & ISO 14001:2015 standards.

Every employee is entitled to work under the safest conditions possible and, as such, every reasonable
effort shall be made in the interest of accident prevention, fire protection, and health, safety, and
environmental preservation.

DAR requires its employees, subcontractors and suppliers working on the project to adhere to the ROSHN
HSSE standards of practice for health and safety.

Health and safety preservation and public safety are a core value equal in importance with
productivity, quality, and ethical standards. No employee, subcontractor, supplier or any third party
working on the project shall be expected, or knowingly allowed, to work in a manner which
contravenes the intentions and the spirit of DAR Engineering or in contravention of any local
regulation, code, or legislation.

1..4 Scope of Works

The scope of works

Detailed Scope for Package

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE1 7 OF 118
 Clearing & grubbing
 Road way excavation
 Embankment
 Sub grade
 Structural Excavation
 Kerbs, channels,
 Structural Concrete
 Grouted or Loose Rip Rap
 Gabion
 STORMWATER DRAINAG
 Design & Build of the Portable Water Pumping Station and Elevated Storage Water Tank
 Building construction

1..5 Project Location:

Al Hofuf Development project located Al Ahsa, approx. 10km south-east of Al Hofuf city, in Eastern
Region of the kingdom of Saudi Arabia.

Al Hofuf development location at a national scale

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE1 8 OF 118
Al Hofuf development location at a local scale

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE1 9 OF 118
The above figure provides visualization of the existing elevation of the
site.

Project Coordinates
25.2774N 49.7009E

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE20 OF 118


6. HSE Policy, Objectives & Targets
The Health, Safety and Environmental Policy and Project HSE Objectives of the Policy shall be
communicated to all site Contractors, subcontractor, and employees throughout the course of the Project.
HSE Policy and procedures are to be communicated to the project workforce through the following
educational systems:

 H&S Induction
 Toolbox, Safety Meetings
 Safety Committee Meetings
 In-House Training Seminars

The HSE Policy has been authorized by the president & CEO of DAR ENGINEERING to state the commitment
towards achieving set safety objectives, continually improving H&S performance and complying with
relevant legislation.
This policy relates to the activities undertaken by DAR ENGINEERING and is made available to interested
parties, upon request.

1.1. Health and safety and environmental Objective and targets

DAR ENGINEERING has set the following specific objectives in the Safety Policy: -
 Elimination of personal damage.
 Systematic reduction personal damage.
 Compliance with legislative and client requirements.
 Maintenance of a safety and health system.
 Promote continuous improvement and minimize safety incidents and accidents.
 Maintain certification of the Safety Management System to OHSEAS 45001- 2018 requirements.

Attached OHSE & EMS Policy

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE2 1 OF 118
OHSE POLICY

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE2 2 OF 118
EMS POLICY

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE2 3 OF 118
ISO 45001- 2018

In line with the above, DAR ENGINEERING Safety targets are:

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE2 4 OF 118
 Zero Personal Damage.
 Zero tolerance for accident.
 There should not be improvement notices from Client, Local Municipality & other
relevant enforcement bodies.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE2 5 OF 118
ISO 14001-2015

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE2 6 OF 118
7. Roles and Responsibilities for HSE.
The Safety Organization Chart provides the lines and authorities of the safety management structure
and job descriptions. The OHSE Management System should be made clear to all levels of the organization
with commitments from all the relevant personnel, who are responsible and accountable for the HSE
performance and activities being carried out as per Planned arrangements and within the scope of their
responsibilities.

The roles and responsibilities of key personnel are as follows:

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE2 7 OF 118
1..1 Organization chart

Key personnel will announce soon

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 2 8 OF 118
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE 2 9 OF 118
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE 30 OF 118
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE 3 1 OF 118
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE 3 2 OF 118
1.2. OHSE Key Person Contact Details

No Full Name Designation Contact Number Email ID


1. TBA HSE MANAGER TBA
2. YASIR KHAN HSE SUPERVISOR +966508182736 YASIR.KHAN@DAR-ENGINEERING.COM
3. TBA INSPECTORS

1.3. Project Manager

He is responsible for Implement the occupational Safety and health management System in their area(s) of
responsibility, in a manner to ensure that the workplace hazards and other risks are reduced to an
acceptable level. Ensure that occupational Safety and health management System Standards are
implemented, so that accidents resulting in injuries, occupational diseases, and property damage or
business interruption are minimized or eliminated.
Overall management and control of the project team to achieve project Safety objectives and
targets in an efficient and cost-effective manner.
Project strategic / execution Planning and control (e.g. Planning and scheduling, cost / change control,
progress measurement and status reporting, etc.);
Interface control and coordination;
Implementation of project Safety Program;
Allocation of resources and assign priorities for the implementation of Safety
Program; Identify, define, implement and monitor the project Safety requirements;
Ensure that accidents and occurrences are reported immediately;
Promote and communicate Safety performance expectations to the entire site team.
Recognize outstanding Safety performance in order to increase commitment and
participation. Monitor customer feedback / complaints and ensure action has been taken in
timely manner; Track and direct the corrective action and preventive action process and
follow-up activities.
Managing interfaces with ROSHN, local authorities and sub-contractors.

1.4. Resident /Discipline Engineers

Responsible for the total implementation of the safety plan in the project site. Implement the occupational
Safety and health management System in their area(s) of responsibility, in a manner to ensure that the
workplace hazards and other risks are reduced to an acceptable level. Ensure that occupational Safety
and health management System Standards are implemented, so that accidents resulting in injuries,
occupational diseases, and property damage or business interruption are minimized or eliminated.
To ensure work methods and designs are safe and comply with relevant OHSE requirements;
To ensure site practices are complied with the Health and Safety Policy, Safety & Loss Prevention Plan
and other OHSE requirements;
Co-operating with the HSE team to discuss and resolve safety problems arising from Contractor
and subcontractors and site operations;
To co-ordinate safety activities between main contractors, subcontractors and other individual
contractors who may be working on the same site;
Preparing / reviewing method statements and/or temporary works design;
Organizing the site to enable works to proceed without risk to persons or damage to properties
and environment; and
1.5. HSE Manager

He is responsible for reviewing and revising the policy and procedures in line with legislative and local
changes to maintain an effective HSE Management System. In addition, duties include promoting a positive
HSE culture to achieve the goals of the HSE Policy and Procedures. Implement the occupational Safety
and health management System in their area(s) of responsibility, in a manner to ensure that the
workplace hazards and other risks are reduced to an acceptable level. Ensure that (occupational Safety
and health management System Standards are implemented, so that accidents resulting in injuries,
occupational diseases, and property damage or business interruption are minimized or eliminated.
Assisting Project Manager in working out a programmed in accordance with the Safety
Programmed and to review the programmed periodically according to the results achieved;
Inspect the site and make spot correction of unsafe condition and Unsafe
Act; Conduct Audit as per schedule.
Take suitable steps to eliminate the Audit findings;
Organize Safety Committee meeting and inspection;
Record the minutes of the safety committee meeting;
Maintain records of First-aid cases/ incidents/ accidents;
Investigate all accidents and recommend action to be
taken; Discuss the accidents in the Safety Committee
meeting;
Organize Safety promotion;
Programmed the requirement of First-aid, Fire extinguishers and
PPE; Schedule Safety Training matrix as per site requirement.

1.6. HSE Engineers / Supervisors

Are responsible for overseeing and checking the implementation of the plan. In addition,
they: Act as the eyes and ears for Management by identifying and reporting hazards.
Assist and participate in the on-going Safety System
Implement immediate action to correct reported or observed unacceptable Safety conditions
and/or behaviors;
Conduct ongoing assessments of the work areas and take necessary corrective actions to eliminate
unsafe practices, conditions and/or behaviors;
Review the effectiveness of the safety and health measures in place within the area.
Participate in jobsite Safety audits and Safety assessments, as required by the management;
Inspect the work place, including any article, substance, plant, machinery or health and safety
equipment at that work place on a monthly basis with a view to the health and safety of the employees
Assist in the promotion of safety to ensure a safer work area for
all Participate and contribute in the Safety meetings;
Conduct accident investigations and prepare required reports;
Enforce Safety related work rules and take action to ensure compliance;
Act as liaison between various employees and also between the employees and different levels of
Management
Evaluate the Safety performance of assigned employees and report finding to the HSE
manager; Participate in pre-job Planning and Job Safety Analysis (JSA);
Participate and Conduct drug and physical fitness for duty observations where
applicable; Attend Safety training as required by the management.

1.7. Contractor responsibilities

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE3 4 OF 118
They are responsible for the Safety of their crews and to:
Contractors are required to cooperate with Project HSE procedures to prevent accident and place
the control measures accordingly.
All Contractors and subcontractors must provide information and training to their employees on
matters pertaining to their nature of work and a copy of training must be submitted to our HSE
Department.
Any Contractors and subcontractors, prior to starting work on this project, will have their HSE
procedures checked and will asked to either forward their own HSE plan or give a written
statement that they will adhere to ROSHN HSSE plan.
The Contractors and Sub-Contractor will be fully responsible for site safety in their work area,
traffic violations & damage to any services and paying of penalty imposed.
In the event of repeated safety violations, serious misconduct with ROSHN/Consultant, DAR
ENGINEERING supervisory staff or any violations which considered serious, then the concerned
Contractor or subcontract employee will be removed from the site. Also, to take necessary disciplinary
action as per our recommendation as and when the safety violations are notified.
Act as the eyes and ears for Management by identifying and reporting hazards.
Ensure frequent and daily attendance to assigned areas to monitor the control measures and
behaviors on site
Consult with and advise the supervisors and workforce on good HSE
practices Co-ordinate with supervisors for weekly Tool Box Talk.
Co-ordinate with supervisors for daily Pre-Task Instruction.
Co-ordinate in the inspection of facilities, machineries and safety equipment’s.
Verification of daily checks performed by operators / drivers.
Ensure First Aid facilities and maintain it all times.
All Contractors shall follow all the clauses mentioned in this safety plan and shall adhere to all safe
work procedures as described in this safety plan. Any violation of safe work procedures will lead to
penalties imposed including dismissals from the project.
Personal protective equipment must be worn by all in all designated
areas. All signs and procedures must be complied with.
All defective plant machinery, and vehicles, must be reported to SPML
immediately. All work related first aid injury / incident and near misses must be
reported.
All unsafe acts or conditions must be reported immediately.
Safety inspections will be carried out on regular basis to comply with Acts and Regulations.
Records of all safety inspections must be kept.
No member of Subcontractor will cause harm to themselves or others by their action. Distracting
behaviors and “horseplay” is strictly forbidden.
Employee and subcontractors shall not be under the influence of alcohol or possess, use, or be
under the influence of illegal substances while on the job, or during working hours, including meal
breaks.

1.8. Site Employees Responsibilities:

Accepting individual responsibility for their own safe behavior.


Maintaining proactive role in the implementation of the site Safety Program and the Accident-free
philosophy.
Working in a safe manner always;
Follow standards of Safety and Health Management System and learn about the latest approved
updates and standards. Learning and abiding by Safe practices and procedures applicable to their
work tasks and for reporting substandard practices, conditions or behaviors to their supervisor.
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE3 5 OF 118
Promptly reporting injuries to their supervisor and safety engineer;

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE3 6 OF 118
Making Safety suggestions;
Refuse to undertake jobs he/she does not understand or deems unsafe.
Contribute to the implementation of the S&H management system by reporting accidents, injuries,
and near-misses
Commitment to safe work procedures and the approved PPE

8. Legal & Other Requirements

1.9. General

DAR ENGINEERING has established, implemented and has maintained a procedure for identifying,
accessing and communicating the applicable legal requirements.

DAR ENGINEERING shall ensure that applicable legal requirements to which the organization subscribes are
taken into account in establishing, implementing and maintaining its OHSE&E management system and
ensures that the information is kept up-to-date.

DAR ENGINEERING communicates relevant information on legal and other requirements to personnel
working under the control of the organization, and other interested parties.

Legal compliance must be maintained with local laws and regulations affecting the activities of the
site/workplace including building and construction codes, regulations, orders, and rules.

9. Hazard Identification, Risk Assessment & Control.


1..1 Risk Register

DAR ENGINEERING shall continually identify project HSE risks and seek effective and reliable means to
control these risks to an acceptable level. From these identified HSE risks, additional policies,
procedures, equipment, compliance programs, or special training required to control the risk of project
activities shall be developed, communicated, monitored, and adjusted.
Hazard analysis and risk assessment planning, the basis of the risk register, is an ongoing process
occurring throughout the life of the project. Hazard analysis and risk assessment planning should
address items such as: routine and non-routine activities; activities of all persons having access to the
workplace (including contractors, lower-tier contractors, visitors, and client representatives); any
outside hazards that might impact the workplace

or the people in the workplace; hazards associated with materials or equipment being used in the
workplace; any changes or modifications, processes, contractual requirements, safety system changes; and
any human factor or capability issues.

1.10. Risk assessment and Method Statement

The objective of a Risk Assessment is to identify project-related hazards and develop methods to deal
with those hazards. DAR ENGINEERING shall ensure identification and mitigation of all the risks on the
project by compiling HSE Risk Register for both Office and Site and by ensuring that the Contractors
compile activity-based Risk Assessment related to their works and as per requirements of the Contract.
All Risk Assessments and associated Method Statements shall be submitted for review prior to the
commencement of the works. DAR ENGINEERING shall ensure that the Contractors shall proceed with
the work / operation in hazardous locations until the Risk Assessment and associated work Method
Statement have been reviewed and No objection status has been given in Aconex by DAR ENGINEERING
or ROSHN.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE3 7 OF 118
1.11. Job Hazard Analysis (JHA) – Risk Assessment

Applicable to assist in the identification and satisfactory control of workplace hazards and risks. These may
also make reference to any relevant Project Safety Instructions, Forms or to the ROSHN and its
employee pre-task planning process known as “Safety Task and Risk Reduction Talks”
JHA breaks a planned activity into manageable steps, identifies the hazards associated with each step
and ensures that appropriate controls and checks exist to eliminate or as a minimum control the
hazards/risks.
Members of the project construction and safety teams perform a review of all known 'high' risk
activities associated with the project in accordance with Health and Safety plan. Following identification
of all such 'high' risk activities, the teams are to ensure identification, elimination, reduction, control or
protection from such hazards and carry out an Activity hazard Analysis. Once developed in the proposal
stage, the applicable Job Safety Analysis shall be further reviewed and revised at site by members of the
project team.
JHA shall be completed for all activities that:
Are identified as having a high potential for causing serious and/or equipment and material
damage.
Deviate from non-standard practices.
Commencement of a new or complex task.
Identification process

There are four steps in the AHA activity:


Break the job into basic steps.
Identify all hazards for each step.
Identify systems and checks to eliminate or control each
hazard. Define responsibilities for implementation of hazard
control.

10. Hazard Communication


1..1 Hazardous Chemicals Exposure Control

All chemicals which will be used at work site must be controlled and handling and storage shall be in line
with Project CESMP and Occupational Health and Safety Construction Management Plan (HSE PLAN).

1..2 Hazardous Substances Storage and Handling

Contractor to ensure the risks associated with the use of hazardous substances are minimized,
no hazardous substance will be brought on site without approval from the DAR ENGINEERING.
Its subsequent use will be subject to appropriate controls to ensure personnel know how to use
the substance safely and only use the substance with the correct PPE.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE3 8 OF 118
It is mandatory that before any substance likely to affect the health or safety of persons is
brought to the site, a Safety Data Sheet (SDS) shall be provided to DAR ENGINEERING on product
arrival and a copy maintained at the following locations:
All hazardous substances must be informed to DAR ENGINEERING H&S prior to mobilizing
them to site.

DAR ENGINEERING HSE


representative. At the site first aid
facility.
At the place of storage of the hazardous substance.

SDS to be communicated Via Training with all workers who will transport, work or will
dispose chemicals.
Training must include how to transport, store, work and dispose chemicals. What and how
to response in case of direct contact e.g., eye contact, absorption, inhale etc.
In case of spillage communicate with Project Environment team to report the incident.

All hazardous materials are handled and stored in accordance with ROSHN Procedure RRE-HC-HC1-
A00- NSP-RRE-HSE-PRO-00005.

1..3 Chemical Disposal

All chemical waste shall be stored in designated bonded area from where it shall be discarded as per
ROSHN Environment Procedures. (Ref ROSHN HSSE Manual Page 147-176)

1..4 Material safety data sheets – Inventory

Safety Data Sheet (SDS) shall be provided to DAR ENGINEERING on product arrival and a copy
maintained at the following locations:
Chemical storage area
Contractor office
All hazardous substances must be informed to DAR ENGINEERING H&S prior to mobilizing them to site.

DAR ENGINEERING H&S


representative. At the site first aid
facility.
At the place of storage of the hazardous substance.
1..5 The disposal of waste material under the site waste management plans

All waste will be collected and segregate and disposal as per ROSHN standard RRE-HC-HC1-A00-NSP-
RRE- HSE-PRO-00037 Waste Management.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE3 9 OF 118
Additionally, as per Saudi arabia environmental management law,

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE3 10 OF 118
Saudi Arabia has published a new Waste Management Law on September 15th 2021. This law aims to
regulate the transport, segregation, storage, import, export, safe disposal of waste and all other
activities related to it. This law replaces Municipal Solid Waste Management Law enacted by the Royal
Decree no. M/48 of 2013. All concerned parties must recycle, retrieve resources, and ensure safe
disposal in order to achieve better environmental and economical results.
According to article 11 of this law waste producers must conserve natural resources and materials,
reuse products, reduce waste, store it in the designated areas, and separate it for the purpose of reuse or
recycle. Article 14 holds the manufacturers/importers an extended responsibility for their products to
ensure financial sustainability in the waste management sector and therefore enforce the concept of
circular economy. The rules and procedures concerned will be determined in the executive regulation
for this law. Article 16 to 18 prescribe the different responsibilities of waste related service providers.
For example, disposal service providers must adhere to the disposal methods set by the national waste
management center (NWMC). As for hazardous waste transporters, they must use means of transportation
that conform with NWMC standards, place warning labels and ensure the existence of documentation
about the transported hazardous waste.
This law also regulates the import and export of waste as well as dealing with emergency situations. Article
19 prohibits the import of hazardous waste without a permit. It also prohibits the import of recycled waste
in addition to recycled used products, devices and equipment.
This law will take affect November 14th 2021.
Ref: (
https://www.my.gov.sa/wps/portal/snp/aboutksa/environmentalProtection/!ut/p/z0/04_Sj9CPykssy0xPL
MnMz0vMAfIjo8zivQIsTAwdDQz9LSw8XQ0CnT0s3JxDfA0M_A30g1Pz9AuyHRUBPXGyKQ!1

11. Emergency Response and Medical Support


1..1 Response / Rescue Equipment

DAR ENGINEERING shall ensure provision of Evacuation Plans are in place and is visible to everyone for
their work area & Site offices. Furthermore, nearest hospitals, medical facilities and police Station and
emergency numbers shall be shared with all staff and be included in this Plan for all stakeholders, Client
and interested parties. For Police assistance, it is recommended to dial the emergency no 999.

The Contractors will produce their Site-specific Emergency Plan and shall be reviewed by DAR
ENGINEERING / ROSHN. Site based Contractor shall perform 8 mock drills every year or as per project
requirements.

DAR ENGINEERING would ensure that Contractor to conduct an Emergency Response training would be
given to all employees inside the facility it occupies.

SN AREA EQUIPMENTS QUANTITY


1 Site Clinic Ambulance with Detachable Stretcher 1 UNIT

2 Site Clinic AED 1 pc.


As per project
3 Site Offices/Welfare area First Aid Kits
requirements
4 Site Office Emergency Alarms As per office requirements

5 Site Office/ Site ABC-Type Dry Powder Fire Extinguishers (10 lbs.) As per Site requirements

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE39 OF 118


6 Chemical Storage area Spill Kits As Per Site Requirements

7 Site Store Water Pump 1

8 Site Store Raincoats/Rubber Shoes/Light batteries/ As Per Site Requirements


Sandbags

1..2 Personal Injury

In Case of an injury of Person


Directly contact the Medical Team for medical assistance.
Do not Leave the Injured Person let the IP stay Calm as possible? Do Not Try to remove the
person unless he is exposed to a greater hazard.
In Case there is an injured person during the operation the medical team will ask permission
from the Engr. to access the restricted area for medical respond on the Injured Person.
If Further Medical Treatment is needed the injured person will be transported by Contractors or
Government Ambulance to the nearest hospital.

1..3 Fire / Explosion/Spillage

In Case of Fire / Explosion / Leaks / Spillage:

On discovery of emergency alarm activated, turn off power and fuel driven equipment or
machines and Proceed to Safe Assembly Point.
Wind direction indicated by windsocks must be observed and movement should be across
wind. Start extinguishing the fire; with assistance if possible and if safe to do so.
Contractors / DAR ENGINEERING Emergency Response Team / Fire Brigade Teams to take
charge until local authority arrives.

1..4 Road traffic Accident / Security Incident

In Case of Road Accident:

Switch off the engine and get out from the card immediately if
possible. Seek medical help if required.
Inform the local police and NAJAM
immediately. Inform PM/CM and Safety
manager.
Cooperate with local authorities.

1..5 DAR ENGINEERING Emergency / Incident Calling tree

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE40 OF 118


DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE40 OF 118
Specific incident callingtree shall be submittedby each contractor in to be place in their respective HSE plan and
keep updated.

Additionally, ROSH procedure RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00001 to be followed.

EMERGENCY COMMUNICATION CALLING TREE

INCHARGE SAFETY SITE NURSE/AMBULANCE


SITE SAFETY SUPERVISOR/ENGINEER

SITE SAFETY
REPRESENTATIVE

DAR SAFETY MANAGER PROJECT MANAGER

ROSHN HSE ROSHM REPRESENTATIVE


REPRESENTATIVE

1..6 First Aid clinic, Ambulance.

Contractors shall provide and maintain adequate first-aid facilities at the work site in accordance with
Articles 134 and 135 and ministerial decision 404 of the Saudi Arab Labor and Workmen Law/ ROSHN
HSSE Procedure. When employees 50 or more workmen at a work site, Employer shall provide a
qualified and certified nurse, with a current CPR and First-Aid Certificate, and a dedicated emergency
vehicle (ambulance), properly supplied (including stretcher) and marked, to transport injured personnel
to the nearest health care facility. First Aid/CPR Training and First Aid Kits – Remote Areas. The Company
provides a First Aid Kit on the premises. It is there for employee's use in the treatment of minor
scratches, burns, headaches, nausea, etc. All employees shall know the location of the First Aid Kit and
shall notify their supervisor if they need to use the First Aid Kit.

Below requirements as per ROSHN HSSE Procedure:

Contractor employs less than 50 persons shall provide on-site a First Aider and a first aid kit
containing:
 Not less than 12 sterile small size finger dressings
 Not less than 6 sterile medium size hand dressings;
 Not less than 6 sterile large size dressings;
 Not less than 200g of cotton wool in 25g packages;
 Not less than 2 x 500g cotton wool
 Not less than 12 gauze bandages 7cm width;
 Not less than 12 gauze bandages 11cm width;
 Not less than 4yds of 1cm wide adhesive tape in rolls

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE41 OF 118


 Not less than 100g of mercurochrome in aqueous solution
 2 x 10g shakers of sulfa powder
 100g of aromatic ammonia solution in a glass bottle with stopper
 Medium sized Thomas thigh splint; m. Wooden posterior leg splint
 Wooden elbow splint;
 Wooden Carr forearm splint
 Wooden palm splint;
 Not less than 6 triangular bandages;
 12 safety pins;
 Ointment for burns containing disinfectant and analgesic
 Not less than 10 70 x 70 burn bandage
 1 pair of blunt end scissors;
 Not less than 1 stretchers

Below Requirements from Total Care safety:


Put these in each of your first-aid kits: Ref https://www.tcs-ksa.com/en/wellness/first-aid-kit.php

A list of emergency phone


numbers Sterile gauze pads of
different sizes Adhesive tape
Adhesive bandages (Band-Aids) in several
sizes Elastic bandage
A splint
Antiseptic wipes
Soap
Antibiotic ointment
Antiseptic solution (like hydrogen
peroxide) Hydrocortisone cream (1%)
Acetaminophen and ibuprofen
Tweezers
Sharp scissors
Safety pins
Disposable instant cold
packs Thermometer
Tooth preservation kit
Plastic non-latex gloves (at least 2
pairs) Flashlight and extra batteries
Paracetamol or Panadol

Trained in first aid procedures in accordance with a programmed to be agreed upon with the Saudi
Red Crescent Society or who holds certificate from a Hospital attesting that he has practiced first
aid and is qualified to administer it.
A separate first aid kit shall be supplied if work is carried out at different locations more than 300m
apart.
A Contractor that employs more than 250 persons shall provide a full-time Paramedic, and a
First Aid Room with sufficient first aid materials and supplies that are no less than detailed in
paragraph
above.
Where Contractor has less than 500 workers, a vehicle capable of carrying a stretcher laden
casualty, shall be designated for the transportation of the workers to off-site medical facilities
requiring treatment.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE41 OF 118


Contractor shall provide an additional on-site First Aider and first aid kit for every additional 50
employees.
Contractor's medical staff are to maintain an accurate inventory of all medical supplies,
including a register of all items that have an expiry date, so that these items may be replenished
before expiry.
Supplies of any item in the first aid kits and rooms shall be replenished whenever they fall below
levels specified.
Contractor shall provide at the work site a first aid room which meets the Following
standards: It shall meet all sanitary specifications.
It shall be conveniently located and readily accessible to injured persons and stretcher bearers.
Where quick means of transportation for the injured are not available, the said room shall not
be more than 300 meters from the farther work site.
An adequate number of stretchers shall be available for moving the injured to the first aid
room. First aid materials and supplies shall be no less than those specified herein.
A Full-time nurse shall be always on duty during working hours.
Supplies of any item in the first aid cabinets and rooms shall be replenished whenever they fall
below the levels specified herein.
Contractors shall assign 50:1 first aider at workplace.
Contractor's medical staff are to maintain accurate first aid treatment registers which shall be
available for inspection by Employer or its Representative at any time. All injuries requiring First
Aid must be reported on a monthly basis to Employer as per Roshn procedure RRE-HC-HC1-A00-
NSP-RRE-HSE-PRO-00001 Accident Notification, Reporting & Recording Procedure.

1..7 Pre-Medical Inspection

As per Saudi law all workers of Contractors shall have a valid Health insurance. Employer/ Contractors shall
ensure that all workers are fit to work. Regular medical checks shall be conducted to assess work force
health.

DAR ENGINEERING Require that all employees shall go a pre-employment medical, Contractors shall
keep records of all employee’s medical test which were done at joining the company.

Any worker with pre-determined health condition that can further deteriorate due to work activity shall be
identified and recorded. Health reports shall be considered prior to task assignment.

1..8 First Aid Boxes

First aid kits are stored in the FIRST AID BOX. If an employee sustains an injury or are involved in an accident
requiring minor first aid treatment, they shall:
Inform their supervisor.
Administer first aid treatment to the injury or wound.
If a first aid kit is used, indicate usage on the accident investigation report.
Access to a first aid kit is not intended to be a substitute for medical
attention. Provide details for the completion of the accident investigation
report.
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE41 OF 118
1..9 Assembly points

Designated assembly point will be provided at work location and office area as per project condition.

1..10 Frequency of emergency response drills

In a workplace with serious fire hazards, fire drills should be conducted at least once every 3 months.
Evacuation exercises or fire drills are necessary to familiarize employees with current emergency
procedures. At the minimum, every department and area should participate in one exercise every 6 months

1..11 Site layout plan in case of emergency.

Will be submitted after mobilization

12. Incident Reporting, Recording and Investigation


1..1 DAR ENGINEERING Incident Notification calling Tree

DAR ENGINEERING INCIDENT NOTIFICATION CALLING TREE

INCIDENT / EMERGENCY
SITE
NURSE/AMBULANCE

Site HSE Representative


SITE SAFETY
REPRESENTATIVE

DAR ENGINEERING HSE DAR CONSTRUCTION


REPRESENTATIVE MANAGER/ PROJECT MANAGER

ROSHN SAFETY ROSHN REPRESENTATIVE


REPRESENTATIVE

1..2 Incident Reporting procedure

The Company Accident/Incident Investigation & Reporting System is designed to:

Track and analyses employee injuries and illnesses, property, and vehicle damage, as well as serious
events or near misses which might have resulted in personal injury, illness, or property and
vehicle damage.
Initiate the worker's compensation process, if
necessary Meet regulatory reporting requirements.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE44 OF 118


All incidents (accidents resulting in injury or causing illness to Company employees) and events (near-
miss accidents) shall be reported according to the ROSHN Procedure: RRE-HC-HC1-A00-NSP-RRE-HSE-
PRO- 00001 Accident Notification, Reporting & Recording.
and furthermore
The contractor team shall notify DAR team immediately and DAR ENGINEERING team will notify
ROSHN team less than 24 hours after the incident happened. Subsequently, within the 72 hours’
period of thorough investigation, a documented final report shall be submitted to DAR and
ROSHN OSH Department
Category 1 accidents / incidents shall be verbally notified (WhatsApp messaging or SMS
preferred) to ROSHN HSSE Department within 30 minutes, with a documented initial notification
report to be submitted within 2 hours. (Ref ROSHN HSSE Manual).
Category 2 accidents / incidents shall be verbally notified (WhatsApp messaging or SMS
preferred) ROSHN HSSE Department within 2 hours, with a documented initial notification
report to also be submitted within 2 hours.
Accident Investigations including the submission of Accident Investigation Reports are to be
conducted as per Contractor own HSE Management System Procedures.
The Contractor shall be responsible for the handling of any accident / incident, for formal
investigation of the event, the reporting to any KSA government agencies of the injuries as per
KSA legislative requirements (seeking advice and support from Employer or Consultants where
applicable & available).
The Contractor is responsible for the formation of a formal Accident / Incident Review Board,
the investigation, and preparing and submitting the Accident / Incident Investigation Report for
all category 1 & 2 events to Roshn HSSE Department within 7 days, seeking advice and support
from PM/CM’s or Consultants where applicable & available.
The Contractor shall be responsible for implementing all recommendations, corrective and
preventative actions identified within the Accident / Incident Investigation Report, and any
other comments or instructions supplied by Roshn or Consultant HSE Director or Manager (Ref
Roshn HSSE Manual).
Contractor shall develop a sanitized “Lessons Learned” brief for sharing with other Contractors
working on Employer Projects and submit to Roshn or its Representative within 5 days of
completion of the Accident / Investigation Report. No personal, medical or confidential information
shall be included within the brief.
Establish a written record of factors which cause injuries and illnesses and occurrences (near-
misses) which might have resulted in injury or illness but did not, as well as property and vehicle
damage.
Maintain a capability to promptly investigate incidents and events to initiate and support corrective
and/or preventive action.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE44 OF 118


Provide statistical information for use in analyzing all phases of incidents and events involving
Company personnel.
Provide the means for complying with the reporting requirements for occupational injuries and
illnesses.
Contractor ensures that all new employees will be briefed regarding to the reporting of
incidents/accidents and near miss events at the time of induction.
All accidents/incidents, which may have had significant potential, will be investigated as soon after
the event as possible. Summarizes the accident and incident investigation and reporting
process. However, an initial report will be provided to the ROSHN within 24 hours.
Copies of the Accident / Incident Investigation Reports for Category 1 & 2 events, and site
accident/first aid registers shall be retained by Contractor until project handover and
acceptance, and then handed over as part of HSE file for retention purposes.

1..3 Injury and Damage Reporting.

Contractors to report all incidents to the DAR ENGINEERING through Aconex, sending it directly to
Project Director, Safety team and copying Client ROSHN through Aconex. Contractor project Manager or
Safety Manager will keep Client updated on incident status.

1..4 Near Miss reporting

Contractors’ employee is involved in an incident it must immediately notified to HSE Manager /


Project Manager by any member of DAR ENGINEERING staff.
All incidents must be reported into Aconex within 24 hours after the incident has
occurred. All Near Misses should be recorded and convey to all employees through
meeting/training.

1..5 Incident Investigation process

All incidents, accidents and near misses will be investigated and documented in order to
ascertain the underlying cause, which may determine any deficiencies or other factors which
may have contributed. The investigation will verify the need for corrective actions, identify
opportunities for remedial and preventative conclusions and instigate continual improvement.

Contractors will follow procedures for significant incidents like fatal injuries, LTI’s and any other
high potential incidents

DAR ENGINEERING will investigate all incidents and report to the Client within 24 days of
incident notification.

DAR ENGINEERING shall ensure that Contractors continue to report incidents as per statutory,
Contractual requirements, ROSHN RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00001 - Accident
Notification, Reporting & Recording Procedure and industry best practices.

The Contractor is responsible for the formation of a formal Accident / Incident Review Board,
the investigation, and preparing and submitting the Accident / Incident Investigation Report
for all

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE4 6 OF 118
category 1 & 2 events to Roshn HSSE Department within 7 days, seeking advice and support
from PM/CM’s or Consultants where applicable & available (Ref ROSHN HSSE Manual page 19).

1..6 Steps involved in investigating an accident

The accident investigation process involves the following steps:

Report the accident occurrence to a designated person within the organization.


Provide first aid and medical care to injured person(s) and prevent further injuries or
damage.
Investigate the accident.
Identify the Immediate, Intermediate and Root cause.
Report the findings.
Develop a plan for corrective
action. Implement the plan.
Evaluate the effectiveness of the corrective
action. Make changes for continuous
improvement.

As little time as possible should be lost between the moment of an accident or near miss and the beginning
of the investigation. In this way, one is most likely to be able to observe the conditions as they were at
the time, prevent disturbance of evidence, and identify witnesses. The tools that members of the
investigating team may need (pencil, paper, camera, film, camera flash, tape measure, etc.) should be
immediately available so that no time is wasted.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE4 7 OF 118
1..7 When looking at as the cause of an accident

Accident causations models

Many models of accident causation have been proposed, ranging from Heinrich's domino theory to the
sophisticated Management Oversight and Risk Tree (MORT).
The simple model shown in Figure attempts to illustrate that the causes of any accident can be grouped
into five categories - task, material, environment, personnel, and management. When this model is
used, possible causes in each category should be investigated. Each category is examined more closely
below.

1..8 Task

Here the actual work procedure being used at the time of the accident is explored. Members of the accident
investigation team will look for answers to questions such as:

Was a safe work procedure used?


Had conditions changed to make the normal procedure unsafe?
Were the appropriate tools and materials available?
Were they used?
Were safety devices working
properly? Was lockout used when
necessary?
For most of these questions, an important follow-up question is "If not, why not?"

1..9 Material

To seek out possible causes resulting from the equipment and materials used, investigators
might ask:
Was there an equipment
failure? What caused it to fail?
Was the machinery poorly designed?
Were hazardous substances
involved? Were they clearly
identified?
Was a less hazardous alternative substance possible and available?
Was the raw material substandard in some way?
Should personal protective equipment (PPE) have been used?

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE4 8 OF 118
Was the PPE used?
Were users of PPE properly trained?

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE4 9 OF 118
Again, each time the answer reveals an unsafe condition, the investigator must ask why this situation could
exist.

1..10 Environment

The physical environment, and especially sudden changes to that environment, are factors that need to
be identified. The situation at the time of the accident is what is important, not what the "usual"
conditions were. For example, accident investigators may want to know:

What were the weather


conditions? Was poor
housekeeping a problem? Was it
too hot or too cold?
Was noise a problem?
Was there adequate light?
Were toxic or hazardous gases, dusts, or fumes present?

1..11 Personnel

The physical and mental condition of those individuals directly involved in the event must be explored. The
purpose for investigating the accident is not to establish blame against someone but the inquiry will not
be complete unless personal characteristics are considered. Some factors will remain essentially
constant while others may vary from day to day:

Were workers experienced in the work being


done? Had they been adequately trained?
Can they physically do the work?
What was the status of their
health? Were they tired?
Were they under stress (work or personal)?

1..12 Management

Management holds the legal responsibility for the safety of the workplace and therefore the role of
supervisors and higher management and the role or presence of management systems must always be
considered in an accident investigation. Failures of management systems are often found to be direct or
indirect factors in accidents.

Ask questions such as:


Were safety rules communicated to and understood by all
employees? Were written procedures and orientation available?
Were they being enforced?
Was there adequate supervision?
Were workers trained to do the work?
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE4 10 OF 118
Had hazards been previously identified?
Had procedures been developed to overcome
them? Were unsafe conditions corrected?
Was regular maintenance of equipment carried
out? Were regular safety inspections carried out?

1..13 Physical Evidence

Before attempting to gather information, examine the site for a quick overview, take steps to preserve
evidence, and identify all witnesses. In some jurisdictions, an accident site must not be disturbed
without prior approval from appropriate government officials such as the coroner, inspector, or police.
Physical evidence is probably the most non-controversial information available. It is also subject to rapid
change or obliteration; therefore, it should be the first to be recorded. Based on your knowledge of the work
process, you may want to check items such as:

Positions of injured
workers Equipment being
used.
Materials or chemicals being
used. Safety devices in use
Position of appropriate guards
Position of controls of
machinery Damage to
equipment
Housekeeping of
area Weather
conditions Lighting
levels
Noise
levels Time
of day
You may want to take photographs before anything is moved, both general area and specific items.
Later careful study of these may reveal conditions or observations missed previously. Sketches of the
accident scene based on measurements taken may also help in subsequent analysis and will clarify any
written reports. Broken equipment, debris, and samples of materials involved may be removed for
further analysis by appropriate experts. Even if photographs are taken, written notes about the location
of these items at the accident scene should be prepared.

1..14 Eyewitness accounts

Although there may be occasions when you are unable to do so, every effort should be made to
interview witnesses. In some situations, witnesses may be your primary source of information because
you may be called upon to investigate an accident without being able to examine the scene immediately

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE50 OF 118


after the event. Because witnesses may be under severe emotional stress or afraid to be completely
open for fear of recrimination, interviewing witnesses is probably the hardest task facing an
investigator.
Witnesses should be kept apart and interviewed as soon as possible after the accident. If witnesses have
an opportunity to discuss the event among themselves, individual perceptions may be lost in the normal
process of accepting a consensus view where doubt exists about the facts.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE50 OF 118


Witnesses should be interviewed alone, rather than in a group. You may decide to interview a witness at
the scene of the accident where it is easier to establish the positions of each person involved and to obtain
a description of the events. On the other hand, it may be preferable to carry out interviews in a quiet office
where there will be fewer distractions. The decision may depend in part on the nature of the accident
and the mental state of the witnesses.

1..15 Interviewing

Interviewing is an art that cannot be given justice in a brief document such as this, but a few do's and don'ts
can be mentioned. The purpose of the interview is to establish an understanding with the witness and
to obtain his or her own words describing the event:

DO…
Put the witness, who is probably upset, at ease.
Emphasize the real reason for the investigation, to determine what happened and
why? Let the witness talk, listen.
Confirm that you have the statement correct.
Try to sense any underlying feelings of the witness.
Make short notes or ask someone else on the team to take them during the
interview. Ask if it is okay to record the interview if you are doing so.
Close on a positive note.
DO NOT…

Intimidate the witness.


Interrupt
Prompt
Ask leading questions.
Show your own
emotions. Jump to
conclusions.
Ask open-ended questions that cannot be answered by simply "yes" or "no". The actual questions you
ask the witness will naturally vary with each accident, but there are some general questions that should
be asked each time:

Where were you at the time of the


accident? What were you doing at the
time?
What did you see, hear?
What were the environmental conditions (weather, light, noise, etc.) at the
time? What was (were) the injured worker(s) doing at the time?
In your opinion, what caused the accident?
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE5 1 OF 118
How might similar accidents be prevented in the future?

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 2 OF 118
If you were not at the scene at the time, asking questions is a straightforward approach to
establishing what happened. Obviously, care must be taken to assess the credibility of any
statements made in the interviews. Answers to a first few questions will generally show how
well the witness could observe what happened.
Another technique sometimes used to determine the sequence of events is to re-enact or replay
them as they happened. Obviously, great care must be taken so that further injury or damage does
not occur. A witness (usually the injured worker) is asked to re-enact in slow motion the actions
that preceded the accident.

1..16 Background information

A third, and often an overlooked source of information, can be found in documents such as technical
data sheets, health and safety committee minutes, inspection reports, company policies, maintenance
reports, past accident reports, formalized safe-work procedures, and training reports. Any pertinent
information should be studied to see what might have happened, and what changes might be recommended
to prevent recurrence of similar accidents.

1..17 Knowing the factors when making the analysis and conclusions

At this stage of the investigation most of the facts about what happened and how it happened should
be known. This has taken considerable effort to accomplish but it represents only the first half of the
objective. Now comes the key question--why did it happen? To prevent recurrences of similar accidents,
the investigators must find all possible answers to this question.
You have kept an open mind to all possibilities and looked for all pertinent facts. There may still be gaps
in your understanding of the sequence of events that resulted in the accident. You may need to reinter
view some witnesses to fill these gaps in your knowledge.
When your analysis is complete, write down a step-by-step account of what happened (your
conclusions) working back from the moment of the accident, listing all possible causes at each step. This
is not extra work: it is a draft for part of the final report. Each conclusion should be checked to see if:

It is supported by evidence.
The evidence is direct (physical or documentary) or based on eyewitness accounts,
or The evidence is based on assumption.
This list serves as a final check on discrepancies that should be explained or eliminated.

1..18 Making recommendations

The most important final step is to come up with a set of well-considered recommendations designed to
prevent recurrences of similar accidents. Once you are knowledgeable about the work processes
involved and the overall situation in your organization, it should not be too difficult to come up with
realistic recommendations. Recommendations should:

Be specific.
Be constructive.
Get at root causes.
Identify contributing factors.
Resist the temptation to make only general recommendations to save time and effort.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 3 OF 118
For example, you have determined that a blind corner contributed to an accident. Rather than just
recommending "eliminate blind corners" it would be better to suggest:
Install mirrors at the northwest corner of building X (specific to this accident)

Install mirrors at blind corners where required throughout the worksite (general)
Never make recommendations about disciplining a person or persons who may have been at fault.
This would not only be counter to the real purpose of the investigation, but it would jeopardize the chances
for a free flow of information in future accident investigations.

In the unlikely event that you have not been able to determine the causes of an accident with any
certainty, you probably still have uncovered safety weaknesses in the operation. It is appropriate that
recommendations be made to correct these deficiencies.

1..19 Closeout

After the final Report, the incident accident investigation shall be closed:
Close out report shall be prepared and submitted to ROSHN showing action taken as
recommended in the investigation report.
Lesson learned shall be share with DAR/ROSHN to share throughout project.
OHSE documents, plans, JHA shall be updated if any shortcomings are found in incident
investigation report.
1..20 Injury and damage reporting

DAR ENGINEERING shall ensure that an immediate oral report and preliminary written report is made to
the Company Representative in the cases of all:

Fatal injuries or illnesses.


Injuries requiring medical attention which result in lost
time. Damage over SR10,000 to Contractor’s plant or
equipment Damage in any amount to equipment or
property
Fire.
Damage and all accidents involving cranes and heavy equipment.
To comply with the requirement of Reporting of Contractor On-Job Injuries and Occupational
Illnesses and Supplement.

For accidents resulting in project fatality, serious injury to contractors/cub-con employee(s), or damage
to equipment or property, a written report shall be submitted promptly to the DAR ENGINEERING/ ROSHN. In
addition, ROSHN may convene an DAR ENGINEERING review or investigation committee in accordance with
the requirements, Notification Requirements for Incidents (including Fires), Guide for Committees
Investigating Major Incidents and Engineering Reviews of other Incidents.
Contractors shall maintain, in a format approved by the Company Representative, a current record showing
all:

Work injuries
Fires
Incidents or property damage over SR10,000

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 4 OF 118
Motor vehicle accidents (MVA)
Incidents involving damage to ROSHN equipment and property.
Damage and all accidents involving cranes and heavy
equipment.

This record shall be available for inspection for all reasonable times and shall be submitted to DAR
/ROSHN upon request. “Accident, Investigation, Analysis and Reporting”

13. HSE Performance Monitoring, Inspection and Review


1..1 Construction and HSE staff daily checks

Scheduled safety inspections are essential to the hazard identification and accident prevention
programs. The purpose of the inspection is to identify and correct unsafe acts, equipment, situations,
conditions, and practices to prevent accidents.

1..2 HSE Inspection

HSSE Audits & Inspection to be conduct according to the client Procedure.

Description Activity Frequency Action by Remarks

Supervisory Superintendent or Each supervisory


Daily
Inspection Supervisor personnel

Advisory
Daily Safety Supervisor SCONTRACTORS
Inspection
All members of
SITE Inspection before
Safety Inspection Weekly Health &
weekly Safety Meeting
Safety
Inspection Committee
All members of Before monthly
Safety Inspection Monthly Health & meeting of Health
Safety & safety committee
Committee
 Martial. Operator Daily Checklist
Before usage
/Equip. Safety Officer
 Scaffoldin
Before Usage
g Check Scaffold Forman Tagging
DAR
Weekly Project Manager
ENGINEERING/ROSH
Management Weekly and Site Engineer
N /Contractor
Walkthrough with Safety Manager
Management
Contractors PD, PM Performance
Regular Audit Quarterly
& HSE MANAGER Evaluation
Audit
ROSHN Team/
Extra Audit As required Guide or Investigation
External Auditor

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 5 OF 118
1..3 Senior Management HSE Tours

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 6 OF 118
Contractors ’s OHSE Manager and Project Manager along with Contractor Senior Managers and Clients
Representative (where available) will undertake a joint inspection of the site for any chosen or random area
followed by HSE meeting. DAR ENGINEERING or Client observations, Site Status and pending actions
shall be reviewed in the upcoming month’s meeting and close-out shall be discussed for the current
observations.

1..4 HSE Process Assessment Audits

The project will be subject to internal and external audits. Internal audits will be conducted by the
corporate HSSE departments of DAR/ROSHN. where the project documentation as well as the
project sites will be thoroughly audited to ensure the project compliance with both corporate
Health and Safety management systems. External audits will be conducted by third party as part of
the ISO 14001: 2015 & ISO 45001:2018 certification process. Audits reported will be sent to the
project management team and respective contractor who shall take the necessary actions to close
out all non-conformances within the given timelines. RE or its appointed representatives will, from
time to time, conduct audits and Safety Management System. Contractors shall close out any
corrective actions identified during the audit in a timely manner or as defined in the audit report.

The audit is conducted by Contractors Corporate Manager and it shall involve interviews,
documentation review and/or physical inspection of areas as determined from the scope of the audit.
Tentative schedule for the audits is given with note that the exact dates for audit will be announced in
collaboration with the concerned departments and contractors.
HSE Management System Audits will check and Contractor’s HSE performance against implementation
of the HSE Plan and HSE Management System and will require an Audit Report to be generated and
followed up. The Audit system will cover all stages of the project including design, construction and
operation.

1..5 Methods of corrective action tracking and closeout

All observation made during the inspection shall be recorded. Copies of the Inspection report shall be
distributed to all members of the safety committee, Discipline Superintendent and Construction
Manager of Subcontractors Concerned for corrective actions

1..6 Performance Measurement and Reporting

Contractors will encourage reporting system and all employees should be reported all site related
incident to HSE department.

1..7 HSE Plan Review

DAR ENGINEERING HSE plan and related procedures for effectiveness will be reviewed by DAR
ENGINEERING Senior Management with participation by ROSHN representatives. The review will assess the
extent to which ES&H objectives have been achieved, performance trends in nonconformities and
corrective actions, audit results, adequacy of resources, relevant communications from Stakeholders
and opportunities for continual improvements.
The DAR ENGINEERING HSE Manager will schedule, organize and facilitate the review and the meeting
will be attended by the Project Manager and other departmental heads. The outcome of the review
shall include:

Decisions on the plan’s suitability, adequacy and effectiveness.


Any strategic adjustments based on performance and the organization
Changes or additions to HSE objectives, policy and resources
Actions needed if objectives have not been met or the risk profile has
changed Decisions related to continual improvement initiatives and
opportunities."

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 7 OF 118
14. Vehicles, Plant & Equipment Inspections
1..1 Equipment inspection

Prior to being used, equipment arriving at the site will be inspected by a competent person designated
by us. The incoming inspection shall be documented on the appropriate equipment inspection form.
Owner will inspect all vehicles and fuel driven construction equipment prior to mobilizing it onto the
jobsite and annually thereafter. The condition of the vehicle, equipment operator/driver license, operator
competency certification and insurance will be reviewed prior to the issuance of a site access pass. Third
party inspection certificates of all lifting equipment must also be submitted to DAR ENGINEERING/Client for
record keeping. Daily Inspection to be performed by equipment operators and record shall be maintain.

1..2 Third Party Inspections

All Plants and equipment shall be inspected by a third-party inspection company prior to mobilization to
site and annually thereafter.
Each piece of equipment shall undergo a formal, monthly inspection by a competent person, which will
also be documented on the appropriate inspection report and the correct color-coded inspection sticker
attached to the equipment.

1..3 Color-Coding/ Inspection Tagging Systems

PROJECT MONTHLY COLOR CODE


JANUARY FEBRUARY
YELLOW

MAY JUNE

GREEN
SEPTEMBER OCTOBER

MARCH APRIL
JULY AUGUST

BLUE
RED

NOVEMBER DECEMBER

The equipment operator shall perform a daily inspection checklist. Any deficiencies noted on the report
shall be addressed. Defective equipment shall be repaired or removed from service immediately.

If deficiencies affect safe operation or cause non-compliance with ROSHN requirements, the equipment
will be shut down and tagged defective until corrective action is completed. Deficiencies corrected will
be documented on the inspection form that noted the deficiency along with signature of inspection.

1..4 Record and Maintenance

A copy of the most recent inspection report will be maintained on each piece of equipment as well as in
Safety Department files.

1..5 Equipment requirements

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 8 OF 118
All motorized equipment must have a reverse signal alarm audible at 30-meter distance above the
surrounding noise level. When there is Man Machine interference hazard, a flagman wearing a yellow
reflective vest and equipped with a red flag and a green flag shall be provided. Flag man shall be trained
regarding Hazards i.e., Blind spot and shall be at appropriate distance from the equipment. Flag man
shall be always visible to operator and all Flagmen and spotters will always be protected behind physical
barriers to prevent injury from moving plant.
All cracked and broken glass shall be replaced before bringing vehicles on the jobsite. If glass is broken
or damaged on jobsite and if damage is severe enough to cause a potential safety problem, the machine
shall be stopped until such damage has been repaired.
Vehicles used to transport employees shall have seats firmly secured and adequate for the number of
employees to be carried and all passengers should be properly seated. Standing on the back of moving
vehicles is prohibited. It is not allowed to transport employees in the back of pickup trucks or any open
vehicle.
DAR ENGINEERING/Client shall review and approve locations for storage of all fuels, lubricants, and starting
fluids prior to use by us for storage. We shall equip all vehicles and fuel driven construction equipment with
a fire extinguisher, red triangles, flashlight and a first aid kit.

15. Safety devices

We shall equip all vehicles and fuel driven construction equipment with a fire extinguisher, red triangles,
flashlight and a first aid kit. All rubber tired, self-propelled scrapers, rubber tired, frontend loaders, rubber-
tired dozers, wheel type agricultural and industrial tractors, crawler tractors, crawler type loaders and
motor graders shall be equipped with rollover protective structures and seat belts. Inspection of these
devices will be included as part of the operators’ daily preoperational inspection, as well in the formal
monthly inspection. No equipment shall be operated with defective or missing safety devices.
All equipment’s maintenance to be carryout according to the manufacture instructions.

16. Consultation and Communication


1..1 HSE Meeting Schedule

Safety Manager shall establish a regular schedule for safety meeting and maintain records of personnel
attendance to manage and communicate on Safety effectively. The Project Manager shall manage and
monitor Safety activities and acting and providing resources to support their objectives and work
activities.

Kick-off Safety Meeting

Kick-off meeting with Client will be held, if required, after contract award and before the execution of
any work. At this meeting, DAR ENGINEERING should ensure that all related contractors personnel are
aware of the site hazards of the operation detailed in the scope of work and are familiar with Health and
Safety working procedures, regulations, and emergency communications.

Kick-off meeting with subcontractors’ representative shall be held after subcontract awards and before
starting specific work.

Monthly Safety Meeting

Dar Safety Manager shall hold monthly meetings with Health and Safety Committee that consist of
Contractors Project and Construction Manager, Safety Manager, Discipline Engineers, Supervisors,
Forman/Lead Man and Subcontractor’s to discuss Health and Safety activities during the construction
stage. Safety Representative will attend the meeting to communicate his opinions and/or direction to all
members if required. For the construction work in Health and Safety, we will organize the Health and Safety

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 9 OF 118
Committee as below. The Health and Safety Committee shall plan, coordinate, implement and maintain the
overall Health and Safety activities control during construction including pre-commissioning /
commissioning.

The objectives of the Health and Safety Committee are


To formulate and execute the accident prevention programs.
To cultivate and promote safe working habits and attitudes.
To create and maintain a safe and healthy working environment.
At the Health and Safety Committee Meeting, members of the committee shall discuss, review, amend,
and establish:
New Health and Safety rules and regulations, procedures, as
necessary Project monthly Health and Safety performances
Accident/incident reports, if any,
If a major or fatal accident occurs, the Committee shall investigate the cause and review
appropriate countermeasures for immediate implementation.
Safety manager shall prepare the Health and Safety materials/information for meeting
and record the minutes of meeting.
Progress Safety Meeting (Weekly)

Safety Manager shall hold Weekly Progress Meeting with Construction Manager, Discipline
Superintendents and subcontractor’s Construction Manager and Safety Manager to discuss health and
safety matters. Minutes of meeting shall be maintained and distributed to related part in accordance
with document control procedure.

Toolbox Meeting

Contractors Safety Manager/ supervisors shall conduct Toolbox Meeting twice a week with workers and
staff and shall maintain proper record of the meeting.

The topics for the TBM shall include, but not limited to:
Housekeeping
Personal protective
equipment Excavation safety
Ladder safety
Confined space
safety Hot works
Electrical safety
Hand and power tools
safety Fall protection.
Heat stress
And any other topic specific to the work and site

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 10 OF 118
Daily Task Briefing

Supervisors/Forman shall remain responsible for conducting a Daily Task Safety Briefing prior to
commencing day’s work. This requirement shall include Supervisors working on the construction site,
laydown area and Workshop Area.
All Supervisors, including those working for the Sub-contractors, shall be trained in Pre-start
Safety Briefing process. As part of DAR ENGINEERING’s commitment to continual improvement, the
adequacy and effectiveness of the Daily Task Briefings shall be monitored by the project H&S team, and
any
Supervisor found to be inefficient in delivering Daily task Briefing shall be retrained.

1..2 Posters / Bulleting board

HSE Posters are meant to reach many people on the move with brief and simple messages.

1..3 STARRT process

A STARRT or JSA should be carried out on all work activities or tasks where potential risk to the health
and safety of employees has been identified and/or where there is a potential for causing injury, ill-
health, property or plant damage.

Step 1 – Break the job down into separate tasks or steps. The actions to complete each step of the job must
be identified and documented on STARRT or JSA form.

Step 2 – Identify the hazards. Once each step of the job has been identified consider the hazards for
each step. There may be more than one hazard for each step so all must be listed on the forms.

Step 3 – Risk Controls. After completing the risk assessments, suitable controls should be selected for
each hazard to reduce the risk of injury, ill-health or damage. Consideration must be given to the
hierarchy of controls so that the highest level of protection is made available wherever possible. The
controls are entered on STARRT or JSA form.

NOTE:
Ensure that the task supervisor must acknowledge the understanding of the workers by getting their
attendance and signing to the specified worksheet.

1..4 Weekly toolbox Talk

Contractors Safety Manager/ supervisors shall conduct Toolbox Meeting twice a week with workers and
staff and shall maintain proper record of the meeting.
The topics for the TBT shall include, but not limited
to: Housekeeping
Personal protective
equipment Excavation safety
MEPI

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE5 11 OF 118
Working at height
Lifting operation
Electrical work safety
Heat Stress
PPE’s
Hygiene
Power tools
safety Hand tools
safety Road
safety
Hot work safety
Etc
1..5 Notice Boards

ROSHN Standard Notice boards shall be used to display HSE documents including Safety Posters,
bulletins and alerts which contain important and often urgent information. Notice boards are displayed in
prominent positions and employees are encouraged to review them on a regular basis to keep up to
date with any new details.
All notice boards must have the following:

HSE Policy
Office Evacuation plan
HSE alerts
Safety communications
Health and Safety Weekly/Monthly
Stats Safety Award Winners
Contractors Safety Manager and Safety Supervisor shall ensure that HSE information on notice boards is
updated and maintained periodically.

17. HSE Training


Safety training is essential for executing work safely during the entire construction, pre-commissioning, and
commissioning of the project. The Construction Manager and the Safety Manager shall establish an On-Site
Safety Training Programmed before commencing the work.
This guidance provides essentials of establishing On Site Safety Training Program of the
following Five categories.

Safety Induction Training for New


Personnel Safety Training for Manager &
Supervisors
Safety Training for specific hazardous
job. Emergency & Evacuation Training
Safety Training for refresher

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE60 OF 118


course. Toolbox Talks.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE60 OF 118


1..1 General

Contractors will conduct safety training for its staff. Subcontractors shall Conduct Safety Training for
their employees. Accordingly, all Subcontractors’ Construction Managers, Safety Manager and other
persons designated by their Construction Managers shall initially take their safety training courses to conduct
safety training for their employees.

Training shall be in line with 3-month risk assessment. Safety Manager shall prepare training schedule as
per the risk identified in Risk register. Apart from the mandatory Trainings like Safety
Induction, Safety manager shall identify and give Task related training to workers expose to the hazards
identified in Risk register. Updated training matrix shall be submitted to DAR ENGINEERING on monthly
basis. Training matrix shall be reviewed in case.

When risk register is updated.


There is change in work
environment. There is an accident
resulting in LTI.
Monthly schedule for safety training shall be prepared and noticed in advance to all DAR ENGINEERING’s
Personnel and to Subcontractors.
The Safety Manager shall prepare training materials to effectively conduct safety training.
Safety training shall be conducted by the Safety Manager and/or by
Competent persons designated by the Safety Manager.
The language at safety training shall be common language or adequate. Methods to fully understand.
The record of safety training shall be documented and maintained. All Subcontractors shall submit the
record of safety training conducted by them to contractor.

1..2 Safety Induction/ Orientation

All new employees including management and staff, and Subcontractors' management, staff,
supervisors, and workers

Contents of Training:

Emphasize the importance of Health and


Safety. Health and Safety Policy and
Philosophy.
Orientation of the site layout and the workplace, using maps/drawings, etc., especially for the
restricted areas to entry, such as the OWNER’s property, etc.
Outline of the work scope.
Health and Safety Organization and the individual's duties and responsibilities for Health and
Safety.
Working rules (duty hours, over-time work, holidays, transportation, housekeeping, etc.)
Health and Safety and Security rules and regulations (gate control, possession of IC card,
smoking rules, substance abuse rules, traffic rule, etc.)
Enforce use of proper personal protective equipment (safety harness, helmets, goggles, gloves,

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 1 OF 118
dust/gas masks, respirators, etc.)

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 2 OF 118
Proper working garment and footwear
Outline of Safety Contraction Procedures
Work Permit procedures (Work items or locations to be subjected, obtaining procedure, etc.)
Emergency and evacuation procedure (emergency alarm system, emergency communication
system, evacuation route and assembly area, etc.)
Participation in Toolbox Meeting (when, where, how)
Keep clean (after day’s work, weekly site cleaning,
etc.) Encourage reporting accidents and near misses.
Encourage reporting unsafe acts and unsafe working
conditions. First-Aid Facilities (location, how to use, etc.)
Safety incentive scheme to create interest and enthusiasm in safety effort.
Confirmation of Personal Information submitted prior to the safety induction training
(individual’s work experience, license/permits, physical condition, etc.)
Attendance list:
Attendance list for Health and Safety training should be kept and updated

1..3 Visitors Orientation

All visitors should be inducted and oriented from HSE department and issue the visitor id card /
Temporary gate pass and Contractor will make sure visitors orientation.
(ROSHN Security procedure to be followed)

1..4 Supervisor HSE Training

Contractors Discipline Superintendent and Subcontractors' Construction Manager, Safety Supervisor,


Supervisors and Foremen, and other personnel designated by their Construction Managers.

When: Within a month after dispatch to the construction site.


Training Materials: The material prepared by Safety Manager.
Instructors: Contractors Safety Manager or designated
persons.
Contents of Training: In addition to the contents of the Safety Induction Training, the following
shall be included:

Observe the Health and Safety Policy and Monthly Health and Safety Targets that are
established by the Health and Safety Committee
Make sure of Health and Safety Organization and individual's responsibility regarding Health and
Safety management
Emphasize the necessity for expanding Health and Safety
knowledge Health and Safety Committee Procedures and its
activities
Accident Investigation method and Reporting
System Safety Meetings (type, frequency,
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE6 3 OF 118
participants, etc.)
Ensure participation in Safety Patrols conducted prior to Health and Safety Committee Meeting

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 4 OF 118
and other safety meeting (type, frequency, participants, objectives, etc.)
Action to be taken when detecting unsafe acts and unsafe working conditions (hold work,
prohibition of use of facilities, and making reports)
Incentive program for subcontractors' Health and Safety performance
Reporting daily or weekly on concerned matters regarding Health and Safety management.
1..5 Health hazards – Subcontract specific

Coverage: Persons to operate and handle specific machines and equipment Persons assigned in
hazardous job.

When: Before commencing the work or periodically

Training Materials: Material prepared by Safety Manager.

Instructors: Competent persons designated by Contractors Safety Manager

Work to be required Special Instruction:

Handling of organic solvents or toxic


materials Handling of radioactive material
Work in restricted area or likelihood of
asphyxiation Trench and deep excavation
Lifting and crane operation including rigging
work Installation and dismantling scaffolds
Concrete form work for structures or building
Work in/near an existing plant (regardless operating or not)
Other work designated by Contractors Health and Safety Manager

Exemption
A worker who has a license or permit issued by a third party or who is acknowledged by Safety Manager
to be experienced with the job may be exempted from the above training course.

18. Subcontractor Management


Where the risk analysis suggests a subcontracted process is of a high risk to safety and health, a Safety
program is requested from the subcontractor. This Programmer is required to set out how the
subcontractor intends to manage the occupational safety and health of all persons engaged on site at work
under the subcontract.
The Project Director/ Manager or nominee reviews the Subcontractor’s Safety program. Acceptance of the
Safety program is recorded by the Project Director/ Manager’s signature on the Plan.
Subcontractors are required to produce Work Method Statements for each of their activities. The
Project Director/ Manager or Construction Manager reviews the Work Method Statement(s). When
they considered it acceptable, it is copied and distributed to Supervisor, the Site Engineer, and the
subcontractor. A copy is be tabled at the next Safety Committee meeting for discussion.

Where Contractors considers a subcontractor’s Safety Plan / Work Method Statement unacceptable, the
subcontractor is required to meet with Construction Manager and Supervisor to discuss the proposed work

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 5 OF 118
method and to determine and document appropriate controls so that a practical Work Method
Statement can be produced for use on the project.

19. Permit to Work

Purpose
To ensure there are integrated procedures for issuing, receiving, transferring and closing of permits to work during
the construction, maintenance, inspection, testing and commissioning activities to be conducted that may pose a
hazard to personnel, damage equipment or facilities, disrupt operations, or harm the environment in Projects Business
Unit.

Scope
This Standard shall be applied throughout on-site contractors of Projects, this standard shall be implemented in
conjunction with Roshn HSE procedures and any other procedures specified by Roshn. This Standard is applicable only
to “Non-Operational” Construction sites belong to projects.
Permits to Work are designed to provide extra assurance that key high-risk activities have been carefully planned,
pre-start checks have been made to ensure all precautions are in place before works commence, and checks are made
at the end of the shift or day to close out the permit.
Contractor will issue Permit for critical activities. Permit shall be filled and signed by the Responsible
Engineer prior to the activity starts. Safety representative will verify the control measures are implemented at site
and sign. Supervisor / Forman is responsible to make sure that Permit requirements are full filled all the time during
activity. Permit shall be closed after the shift and submitted to H&S Department for recordkeeping.
DAR ENGINEERING shall ensure Contractors are in possession of necessary Permit to Work.

General Requirement
Each main contractor or subcontractor shall perform an overall risk assessment for all site project, all task and
equipment.
Each main contractor or subcontractor shall utilize the risk assessment prepared by him, to develop work safe
procedure to control and manage the risks associated with the activities according to their risk rating.

As specified in ROSHN Standard Health and Safety Permit requirements – SOP - 021 – Permit to Work, the
employer will require a permit-to-work system to be adopted in the project which will be under the direct issue
of the Respective contractor in coordination with the Supervision Dar Engineering Consultant.
Contractor's Project manager shall ensure that the person designated as the Authorized Person to issue work
permits have undergone adequate training and have the full understanding of the PTW System to execute his
duties and should take into account the practical experience as authorized Person of a particular activity or
condition involved at site.

Safe Work Permits


Certain specific hazardous activities require appropriate Safe Work Permits in accordance with the
ROSHN/Client requirements. Every application for PTW must have attached to it as a minimum the
following supporting documents:

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 6 OF 118
Approved Task Risk Assessment
Approved Work Method Statement/
Procedure SDS, where applicable
Other items that maybe required
includes: Marked up drawings
Isolation details/ Lock-Out/ Tag-Out
Crane TPI certificates/ including Load
Test Rigging TPI Certificates
Rigging Plan/ Lifting Plan
Competent person certificates (Third Party)

Following is some of such activities within the scope of works requiring permits, approval and issue/ cancellation of
these permits shall be done by the Contractor's with Supervision of DAR Engineering:

Types of Permits

20. Excavation Permit (Brown Color)


A competent person to supervise excavations, trenching, and backfilling shall be appointed by the
Contractor; this person by the very nature of works should be a competent civil engineer.
A geotechnical report shall be acquired to determine the characteristics and properties of the soil
materials that will be encountered during excavations and provide geotechnical conclusions and
recommendations for the design of control measures for the project.

The geotechnical report should provide valuable information for use in determining:

• Dewatering requirements;
• Slope stability;
• Soil classification;
• Ground support requirements;
• Shoring requirements;
• Ground hardness;
• Suitability of materials for excavation;
• Guidelines for equipment selection;
• Ground pressure guidelines by depth;
• Estimated swelling adjusting factor;
• Location of aquifers;
• Soil contaminants
• Other related issues to support site earthwork activities.
In some instances, it may be necessary to perform additional borings or subsurface
investigations to identify subsurface utilities, obstructions and soil conditions; ROSHN
procedure RRE-HC- HC1-A00-NSP-RRE-HSE-PRO-00013 Detection of Buried Services Standard is
to be followed.

Where excavations are deeper than 4 feet (1.2m), the Contractor must use a
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE6 7 OF 118
recognized protective system:

▪ Shoring Systems (Sheet Piles / Secant Piles / Hydraulic Shoring etc…)


▪ Sloping
▪ Benching
All excavations more than 1.5 meters will be barricaded at least 1.2 meter back from the
edge on both sides of the excavation using rigid barricading. Excavations within the
construction site less than 1.5 meters in depth shall be protected or made visible by using
barricade tape.
If access is required to excavations deeper than 1 meter a secured ladder or steps will be
provided and the excavation will be battered, stepped or shored to prevent collapse of any
loose materials.
Where possible all excavations shall be back filled on the same day they are opened. If this
is not possible, the excavation is to be barricaded using an approved system of rigid
barricading, erected 1 meter back from the edge. If left overnight flashing lights are to be
placed around the excavation to alert persons to the excavation.
The excavation competent person shall ensure that the latest revision of as-laid (as-
built) drawings have been used to locate all underground installations and buried
services in the area to be excavated.
The excavation competent person shall note on the Utility Clearance form any special
requirements and control measures required for the excavation (i.e. sloping,
benching, shoring or trench ground support system).
Slopes of all excavations and trenches shall be cut at the angle of repose for the soil
conditions (i.e., dry sand 38 degrees; wet sand 22 degrees).
All spoil material excavated must be kept a distance away from the edge equal to the
depth of the excavation (i.e. for an excavation 2m deep, the spoil must be 2m away).
A means of access & egress shall be provided every 25 feet (7.6m) for all excavations and
trenches.
All excavations and trenches shall be appropriately identified with signs, warnings and
barricades. If adjacent to roads or general public access these must conform to all relevant
traffic regulations and also be adequately lit at night.
Barricades must be a minimum of 6 feet (1.8m) away from the open edges of the excavation
or trench. Height of barricades must be the same as guardrails for a working platform.
Whilst in an excavation or trench, no employees are permitted within 8m of
construction plant working, vehicles unloading into, or a lifting operation overhead.
Where vehicles are used for tipping materials into an excavation or trench, well anchored
stop-blocks must be used to prevent the vehicle overrunning the edge 1.8m from the
edge. These must be placed at a sufficient distance away from the edge to avoid the
danger of it breaking away under the vehicle weight.

All penetrations in fixed walkways or concrete slabs shall be covered with mesh grating
which will be securely fixed with bolts or DAR Engineering.
Excavation permits will be issued before embarking on any excavation activities.
A weekly inspection of excavations and trenches shall be performed by the excavation
competent person. The inspection form shall be kept with the Utility Clearance form; both
documents shall be made available to Employer or its Representative upon request.
The Contractor Supervisor responsible shall conduct a daily inspection of all excavations and
trenches for signs of a possible cave-in, failure of protective systems and equipment, leaking
equipment, polluting land or water, hazardous atmosphere or any other hazardous
conditions. All defects shall be addressed before work is allowed to commence in the
excavation / trench concerned.
Excavations and trenches must also be inspected by the excavation competent person after

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 8 OF 118
any event likely to have affected the strength or stability, and after any cave-in.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 9 OF 118
Underground Utilities
Prior to start any kind of excavation, Contractors shall comply with below minimum requirements to
make sure that underground is all clear from any underground utilities. These measures shall be
communicated with site team via TBT and Daily Task Briefing.

Adequate advance planning shall be required by Project management. Planning


includes. Advance review of available drawings to mark underground utilities in or near
work area.
Plan a sequence of work on how to work near underground utilities and get approval from
government entities.
Coordinate with Al Ahsa Municipality for drawings to mark exact location of underground
utilities.
Coordinate with Al Ahsa Municipality and STC for exact identification of fiber optics cables.
Once identified the Underground utilities, get approvals from relevant authorities to
proceed work on those area.
All involved parties i.e., ROSHN, Dar Engineering shall be informed prior to start work near
utilities area.
Geotechnical survey shall be done, and report shall be submitted to ROSHN/ Dar
Engineering for final approval.
Health and safety team shall coordinate and train regarding safe digging to all excavator
operator and other personnel involved.
All training shall be documented and recorded.
In case of utilities hit / damage all parties i.e., ROSHN, Dar Engineering and stake holders
shall be informed immediately.

For existing underground utilities:


Overhead and Underground Services Underground Services and Permit requirements and
interface with Utilities owner for their PTW approval and etc.
Obtain Work Permits prior to work commencement Energy Isolation Permit (LOTO) where
applicable. Ensure interface with Saudi Electric or other utilities owner to maintain utilities'
clearance and use of as-build drawing & site check & approved Excavation Permit –
backfilling Permit.
Locate and protect all buried services, prior to work
commencement Perform Hand-digging measures to expose
existing services.
Work to be in accordance to approved drawing

The purpose of the excavation permit is to ensure that proper planning and precautions are taken
during before, during and after excavation.
If any excavation more than (1.5m), protective measures should be taken such as
Shoring/Shielding or Stepping/ Benching or Slopping. Documents related to the excavation activity
such as soil test report, excavation design, competency of the professional engineer who designed
the excavation in case of 5m depth shall be verified.
Any excavation involving the removal of soil deeper than 30 cm or driving of a peg below this
depth. This includes any cutting into ground or floors below surrounding level where there is risk of
damage to existing services or harm to personnel. DAR notified of excavation works within
Contractor’s MS. System agreed and approved by DAR. Regular monitoring by DAR and Employer
if require.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 10 OF 118
Excavation Work possible list of activities:
Mechanical & manual Excavation work

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 11 OF 118
Backfilling and compaction
Manhole and septic Tank work
Mobilization and Preparation of Site Offices
Excavation works for Storm and sewer water
lines Sand Bedding and Soil Compaction
21. Confined Space Entry.
A confined space is defined as a space of any volume which:
Is not intended as a regular workplace.
Has restricted means for entry and
exit.
May have inadequate ventilation and/or an atmosphere which is either contaminated or
oxygen deficient, and
Is at atmospheric pressure during occupancy.
All confined spaces entry shall be performed in accordance with ‘Confined Spaces’ entry
requirements as stated in confined space permit.
All personnel required to enter a confined space will undergo confined space entry
training by contractor competent person. Personnel who have not undertaken this
training are prohibited from entering a confined space.
Training delivered to all persons must consist of the following topics:
 Functions of the Attendant;
 Means of communicating with the Attendant;
 Entry & explosive atmosphere hazards;
 Signs, symptoms and consequences of exposure;
 Testing and monitoring equipment to be used;
 Correct use of communications, ventilation and lighting equipment;
 Evacuation signals and alarms;
 Signs and symptoms of heat stress injuries

Additional training to be delivered to the Attendant and Entry Supervisor must include:

 Behavioral effects of hazard exposure of the entrants;


 How to communicate with entrants to monitor their status;
 How to alert entrants of the need to evacuate the confined space;
 How to monitor activities inside and outside of the space to
 determine if it is safe for entrants to remain;
 How and when to order an evacuation;
 How to summon the IRT and emergency services;
 How to prevent unauthorized access to the confined space

Additional training to be delivered to the Entry Supervisor must include: ▪

 The tests, procedures, and equipment required by the permit system;


 How & when to endorse the permit to allow entry;
 When to terminate the entry and cancel the permit;
 How to determine that acceptable conditions are maintained.

Training to be delivered to the IRT must include:

 Training on the Respiratory Protective Equipment (RPE) provided and equipment

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 12 OF 118
 Simulated re operation at least once every six (6) months from the actual confined
space, or a representative space that simulates the type of confined space being
worked in;
 Basic first aid and cardiopulmonary resuscitation (CPR).
A pre-task briefing must then be conducted by the Entry Supervisor to all persons involved with
the entry to the confined space, including the IRT members; the following topics should be
covered and checked:

ACTION RESPONSIBILITY
Obtain other relevant permits (electricity/water etc...) Works Supervisor
Account for all entrants Attendant
Co-ordinate with owners, operators, sub-contractors Works Supervisor
Verify training and assign roles Entry Supervisor
Verify availability of emergency personnel (IRT) HSE Manager
Obtain Hot Work Permit or Permit to Dig signature Entry Supervisor
(if applicable)
Initiate Confined Space Permit HSE Manager
Assemble equipment / materials Works Supervisor
Test Atmosphere Entry Supervisor
Assess and evaluate Safe Method Statement Entry Supervisor
Initiate ventilating equipment as required Entry Supervisor
Secure Area Attendant
Check PPE HSE Manager
Digues actual work task Works Supervisor
Sign the Confined Space Permit All involved
Authorize the Confined Space Permit Entry Supervisor & HSE Manager
Account for entrants Attendant
Commence works All involved

The Contractor Entry Supervisor and HSE Manager shall test the internal atmosphere of the
confined space before any employee enters, with a properly functioning direct reading
instrument for the following conditions, and record findings

CONDITION TO BE TESTED ACCEPTABLE PARAMETERS


Oxygen content More than 19.5%, but less than 23.5% of oxygen
Flammable gases & vapors Less than 10% of the lower explosive limit
Toxic gases & vapors Less than the permissible exposure limit for
known contaminants, or less than 1 part per
million for
unknowns
Radiological hazards Less than 10% of the derived air concentration

OSHA Permissible Exposure Limits (PEL) shall apply, and a full list can be found at:

http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9992&p_t
ext_version=FALSE

Permit to Work (Confined Space) System

A confined space entry Permit must be completed prior to any work in a confined space.
The Contractor Entry Supervisor and HSE Manager are the only employees authorized to sign

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE6 13 OF 118
the Permit and authorize entry.
The completed and signed Permit should be posted at the entry of the confined space prior
to the time of entry so that entrants can confirm control measures are in place.
The duration of the Permit must not exceed the time required to complete the task, or one
shift, whichever comes first.

The Entry Supervisor shall terminate entry to a confined space and cancel the permit when:

 The authorized time of the permit has expired;


 works has been completed;
 a condition not allowed under the permit arises in or near the confined space;
 an emergency or incident requiring evacuation of the area.

The Attendant must monitor the internal atmosphere of the confined space at a minimum of
every 15 minutes, with a properly functioning direct-reading instrument for the conditions
previously mentioned and record findings.
In the event a hazardous atmosphere is detected after entry operations have begun, the Entry
Supervisor and Attendant must:

Step Action Responsibility


1 Order an immediate evacuation of the confined space Attendant
2 Account for all entrants Attendant
3 Prevent anyone from re-entering Attendant
4 Evaluate the space to determine how the Entry Supervisor
hazardous atmosphere occurred
5 Implement engineering controls to reduce the Entry Supervisor
hazardous atmosphere to an acceptable level
6 Document the event on the Permit Entry Supervisor

Emergencies & Emergency Services


Contractor HSE Manager shall co-ordinate with off-site re services before the
start on any works on the Project to determine:

 Availability and extent of emergency services;


 Back-up arrangements;
 Response time;
 Emergency phone numbers and contacts;
 Availability of standby services for complicated entries;
 Any special requirements of the emergency services.

Contractor HSE Manager shall provide the off-site re services with the following
information:

 Full extent of the confined space works;


 Hazards expected including details of known hazardous substances;
 Details of emergency arrangements;
 Details of emergency practice drill they may want to participate in.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE70 OF 118


Contractor medical staff shall have copies of all Safety Data Sheets
Where feasible, entry re s will only be performed by qualified off-site emergency personnel.
If off-site emergency services are deemed too far away from the work site, Contractor's
personnel must be fully trained and equipped to perform entry re activities.
Only employees fully trained in Attendant duties shall perform non-entry re s.

Any entry into an area, which is not designed for human occupancy, has restricted access/ egress
or where the presence of toxic or flammable gases, or deficiency/ enrichment in oxygen possibly
exists. This includes excavations over 1.2 m deep. Contractors to produce a schedule of Confined
Space working as part of HASP. DAR ENGINEERING to be notified of the AICC’s Method Statement
related to Confined Space works. Systems agreed and approved by DAR ENGINEERING. Regular
monitoring to be carried out by DAR ENGINEERING and employer if require.

22. Crane, Elevated work platforms & Lifting Equipment


Refer to the Section 14 of 1.5 Equipment’s requirements
All persons required to operate any mobile crane or EWP shall be trained in the operation of
the equipment as specified by local country authority.
All equipment should be certified by third party certified.
Driver and operator should have their SAG driving license and third-party competency
certificate.
EWP or Man basket shall be used only when other means of working at height is not
possible. Use of Man lift & lifting equipment will be as per ROSHN procedures.
Persons operating or riding in EWPs must undertake Fall Protection Training prior to using a
EWP and wear an approved safety harness while in the raised position. The daily logbook
and inspection register must be completed by the operator first using the machine each
day.
All lifting equipment used on the site is to be inspected daily before
use. Employ must tie off harnesses to EWP's anchorage points.

All lifting operations requiring a crane. System agreed with DAR ENGINEERING (Lift Plan/
Assessment). Regular Monitoring of systems will be carried AICC site H&S team.

Lifting Work Permit (Blue Color)


The purpose of the lifting permit is to ensure proper planning and precautions are taken for
performing any lifting operation using a lifting equipment.
The following lifting operation shall be considered as heavy lifting and a competent lifting planner
(rigger level 1, 2, & 3) shall make a lifting plan.
Any load forty (40) tons or greater.

Any load that exceeds eighty-five percent (85%) of the crane’s rated load capacity or manufacturer’s
specifications for that specific lift.
Any crane lift with explosion/fire/high heat hazards.

Cranes having to suspend a load over tanks, pressure vessels, piping, and/or equipment
containing pressurized liquids, pedestrians, vehicle traffic, occupied construction equipment,
and/or occupied buildings.
(Ref ROSHN PTW Procedure SOP - 021 – Permit to Work

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 1 OF 118
Lifting Work possible list of activities:

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 2 OF 118
Mobilization and Preparation of Site
Offices Installation of Barricades
Materials and Equipment Loading and Unloading
Foundation and ground shuttering and De-shuttering
forms Cable roller installation
Lifting of cable drum and
stand Manhole installation
Removal of concrete barricade
Structural Post / Scaffolding
Installation Temporary Perimeter
Fence
Roofing Installation
Installation of roof slab
Manual and Mechanical Loading and unloading of panel
board Installation of Transformer
Lighting Installation
Gravel Laying on Roof

23. Electrical Permit/ LOTO.

Electrical installations and equipment

All materials and equipment used in temporary electrical installations, as well as electrical equipment
used to supply power to portable electrical tools shall meet ROSHN standards. DAR ENGINEERING shall
ensure that all 125-volt, single phase 15 and20 ampere receptacle outlets, which are not part of the
permanent wiring of any building or structure, shall have Ground Fault Circuit Interrupters (GFCIs) for
personal protection.

General
Only qualified electricians may set-up, modify, inspect, and repair electrical
circuits. All electricians must keep a copy of their qualification on their person.
A Lock-out/Tag-out and permit-to-work system must be in place when changes are being made
to electrical circuits and electrical wiring is not terminated (this includes the permanent
electrical wiring system of an existing building). The permit and Lock-out/Tag out system shall
ensure that no circuit being worked upon can be accidentally or intentionally energized.
All electrical panels must be physically 'locked-out'. The issuance keys to 'locked-out' electrical
panels must be controlled to minimize the risk of an accidental electrocution.
Lock-out/Tag-out will be issued, controlled, and closed by the senior electrician on site and a

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 3 OF 118
copy of the permit to work is to be prominently displayed at the electrical panel being worked
upon.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 4 OF 118
All electricians are to be trained in the permit to work and Lock-out/Tag-out Use flexible cords only
in continuous length, without splices or taps.
Permits-to-work must be kept for the entire length of the Project or revised when any event occurs
that changes the conditions stated in the Permit-to-Work.
Unqualified, unauthorized persons shall not open any electrical enclosure or apparatus, nor
shall they energize circuits without authority to do so.
Once the building or structure is energized, no exposed wires are permitted on 'live' circuits. All
electrical wire circuit ends must have their 'end use' fitting applied (i.e., wall socket cover, light
switches) and be screwed securely in place.
Employee will visually inspect receptacles (sockets), extension cables, cords and equipment
connected by cord and plug before each day’s use to determine if there are external defects. Where
there is evidence of damage, the damaged item is to be taken out of service immediately,
tagged with a defective tool tag and sent for repair.
Electrician shall inspect all electrical equipment’s on monthly
basis. Electric Tools inspection checklist.
No electrical tools must be used without a plug, and no extension cables may be used with
damaged outlets or missing covers. All extension cables are to be fit-for-purpose and have
insulating covering.
In the event a co-worker becomes overcome by an electrical circuit, a nearby person should not
attempt to grab and pull him to safety, lest they also be overcome. They should send for emergency
services, order the circuit to be de-energized and if possible, attempt to remove the person
from the circuit with a non-conductive object (rope, long wooden tool handle, etc.).
An electrical continuity and polarity test for all circuit shall be performed by a qualified person
on all cords, extension cables and receptacles that are used on site, and a ground conductor
continuity test shall be performed on all electrical equipment that are used on site as follows:
Before first use of the equipment
At intervals not to exceed 3 months
Before repaired equipment is returned to service
Before equipment is used after any incident that may have caused damage
All electrical equipment that is to be plugged into these cords, extension cables and receptacles
must have a grounding line. All extension cords and cables are to be fully extended to ensure there
is no risk of overheating.
Any equipment not passing the continuity test will be taken out of service, tagged with a
defective tool tag, and sent for repair.
All repaired equipment must pass the continuity test before returning to service.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 5 OF 118
GFCI’s are to be inspected on a quarterly basis and color coded as per Serial 15 above.
All tests will be made, recorded, and retained by the senior electrician on site, which are to be
made available to the Royal Commission on request. Functional check of the GFCI by pressing
the trip button shall be made by the craftsman prior to powering equipment from a GFCI
receptacle.

Generators

All generators and transformers will be maintained in a good condition.


Any rotating components will be guarded.
The area around generators shall be maintained free of fuel and oil spills.
Where applicable, external fuel tanks will be in areas with containment provisions rated to 110%
of the total tank contents as per Standard 400 – Pollution Control.
All generators (including lighting towers, welding sets etc…) shall be
grounded. Outlets will be in good condition with no exposed conductors.
Generators are to be shaded and protected from the elements.
Adequate hazard warning signage is to be displayed (no smoking within 25m, hearing protection
required etc.…)
Generator locations are to be supplied with relevant fire extinguisher and hearing protection.
Distribution (temporary) Procedure

Yellow triangle with a black lightning bolt.


All distribution panels shall be kept locked, and the keys held by the senior
electrician. Distribution boards shall have a GFCI fitted on the mains breaker.
All distribution boards shall be weather-proofed and grounded.
Terminal points will be in an enclosure with feed and outlet cables channeled through the
enclosure via rubber/plastic grommets.
Cables to and from distribution boards shall be clearly identified and labelled the point at which
the distribution board may be de-energized shall be clearly noted.
Temporary electrical power shall not be "tapped" off from any part of a permanent electrical wiring
system of a building or structure.
Cables shall be of a size and rating suitable for purpose.
Splicing of cables is not permitted. Cables will be extended or repaired using the correct
fittings. Domestic standard cables and fittings shall not be allowed on site.
Particular attention shall be given to cable management to ensure that cables are routed in such
a manner as to prevent an obstruction, cable damage (from vehicular traffic) or a trip hazard.
The method of such routing shall be in a manner that does not damage or affect the integrity of
the cable.
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE7 6 OF 118
LOTO/ Lock-out and tag-out
Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware shall
be provided by the Contractor for isolating, securing or blocking of machines or equipment from
energy sources. Lock-out devices and tag-out devices shall meet the following requirements
be singularly identified; ▪ shall be the only devices(s) used for controlling energy; ▪ shall not be used for
other purposes; ▪ Tag-out devices shall be constructed and printed so that exposure to weather
conditions, corrosive environments or wet and damp locations will not cause the tag to deteriorate
or the message on the tag to become illegible for the maximum period of time that exposure is
expected;
▪ Lock-out and tag-out devices shall be standardized within the facility in at least one of the
following criteria: Color; shape; or size; and additionally, in the case of tag-out devices, print and
format shall be standardized; ▪ shall be substantial enough to prevent removal without the use of
excessive force or unusual techniques or prevent inadvertent or accidental removal; ▪ Tag-out
device attachment means shall be of a non-reusable type, attachable by hand, self-locking, and non-
releasable with a minimum unlocking strength of no less than 50 pounds and having the general
design and basic characteristics of being at least equivalent to a one-piece, all environment-tolerant
nylon cable tie; ▪ Lock-out devices and tag-out devices shall indicate the identity of the employee
applying the device(s); ▪ Tag-out devices shall warn against hazardous conditions if the machine or
equipment is energized and shall include a legend such as the following:
Do Not Star
Do Not Open
Do Not Close
Do Not
Energize Do
Not Operate

Training
All personnel authorized to do maintenance and affected associates (those using or capable
of starting a machine or any equipment) shall be trained annually on the Site’s
Lock-Out/Tag-Out procedure.
All new associates shall be properly trained on the site’s Lock-Out/Tag-Out procedure before
working in an area where lock-out or tag-out devices are in use.
Supervisors must document that associate training has been accomplished. Copies of this
documentation are to be sent to the Facilities Manager or in the cases of construction sites, the
Equipment Manager & HSE representative
Documentation must include the names of all associates participating, the date of the training, a

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 7 OF 118
copy of the curriculum and the name of the trainer.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 8 OF 118
To ensure that the necessary information has been learned a written test shall be
administered by the 3rd party trainer and the results recorded. Associates who do not achieve
at least a 75 percent the written test must be retrained
Written test results are to be retained by the Facilities Manager, or in the cases of construction
sites, the Equipment Manager & HSE representative
Training should include the following:
 Ensure that all associates know the details of the site’s Lock-Out/Tag-Out procedure and that
they know what to do and what not to do when they encounter a lock or a tag on a switch or
a device they wish to operate;
 Associates must be aware that a tag is not a physical restraint. They must be aware of the
false sense of security that tag-out systems can present.
Retraining should take place:
 When an associate is re-assigned to a different area or machine;
 When there is a change in the Lock-Out and Tag-Out procedure;
 When there is a change in equipment or machinery;
 When a periodic inspection or audit reveals inadequacies in the associate’s knowledge or use
of the site’s Lock-Out/Tag-Out procedure

The placement of a lockout device and hold tag on any energy isolating device ensuring that the energy
isolating device and the equipment being controlled cannot be operated until the lockout device is
removed.
Main-contractor's safety personnel (safety engineer / safety officer) who have been appointed and
approved by the Supervision DAR HSE to be assigned for a specific site project. Is responsible to ensure
that all safety precautions measures mentioned in permit to work has been provided and implemented, before
starting the work and to ensure that the employees executing the work have understand the risk and its
precautions, and is asked to sign his acknowledgement in the permit to work.
Any work requiring de-energization or isolation of electrical apparatus and/ or its associated component
parts. Including any work on any item or piece of equipment capable of being electrically charged or
activated. Key LOTO system and Control by Contractors, System to be agreed and approved by DAR
ENGINEERING. Regular Monitoring of systems will be carried Contractor site H&S team. Any work in
energized systems requires employer approval.
Contractor Supervisor Personnel shall undergo and pass the required PTW Training conducted by the H&S
Training Office before he shall be authorized to sign permits.

24. Overhead Transmission / Power Lines


Where overhead power transmission lines exist on, or adjacent to, construction sites or
access roads to the site, the DAR ENGINEERING shall comply with requirements mention
below in the Construction H&S Plan. These methods to be used to prevent contact with the
overhead lines by the following (applicable to the Project) activities:

Lifting Operations
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE7 9 OF 118
Tipper Trucks
Construction Plant (including concrete pumps)
Man-Lifts (MEWPS)
Ladders
As a rule, an SEC Encroachment Permit must be obtained where works
requires construction plant, vehicles, or equipment’s to be closer than:
Overhead lines suspended from steel towers in any direction 20m.
Overhead lines supported on wooden poles in any direction 12m.
However, SEC will specify clearances required for given voltages specific to the site when
Encroachment Permit is initially sought.

All work to be carried out within the above limits shall be controlled by a Permit to Work system.
All workers, including delivery drivers, sub-contractors etc., must receive specific toolbox talks
detailing the hazards and control measures for working under, or adjacent to, live overhead power
lines.
Risk assessments must be conducted by the DAR ENGINEERING to identify control measures to
be used, such as goal posts exclusion zones.
For existing overhead utilities:
Overhead and Underground Services e.g. General Precautions against Overhead Services bullet
(e) Minimum Approach Distance (MAD) and Permit requirements; and interface with Utilities
owner for their PTW approval and etc.
Comply with Electrical Safety PPE regarding PPE requirements using the table titled "Required
PPE (range based on maximum voltage)".
1..1 General

Feed-the cord switches are not permitted.


All temporary lighting shall have lamp holder with a
guard. Remove abandoned wiring as follows.
If service was for a single load, remove all wire and conduit back to branch circuit panel or other
circuit protective.
If the services are only a part of a branch circuit and other loads are still connected, remove all
wire and conduit no longer required
Work on or near energized equipment by qualified electricians is subdivided into categories.
 Hot work
 Proximity work
Metal jewelries such as rings, bracelets, necklaces, watches, with metal bands and/or body, etc.,
shall not be worn while performing electrical work.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 10 OF 118
Proximity work or hazardous work requires the minimum PPE unless the job can be done
equally or more safely without a particular item.
Safety glasses with side
shields Electrically goggle
hard hat
Shoes with rubber soles
Clean, dry leather gloves and/or line-man's gloves
Long sleeve shirt and/or jacket
Entering electrical and telephone manholes shall require.
A minimum of two persons at worksite and a method to obtain assistance from
Site without leaving worksite.

25. Work at Height Permit (Orange Color)


The purpose of the Work at height permit is to ensure proper planning and precautions are taken for all
activities that are performed above the height of 1.8 meters from ground level.
Activities involving using of scaffolds, ladders, MEWP and working on roofs shall be classified as height
work.
All employees involve with working at height must attend “Work at Height “training prior to start work
at height.
Persons working at heights shall have adequate supervision and be issued with instruction to ensure
safe work practices are observed.
All work at height shall conform to the requirements of the Client/ROSHN and local legislation. Positive
fall protection includes:

Scaffolding with handrails and toe


boards Elevated work platforms
Safety harness and static line or appropriate anchorage.

26. Fall Arrest & Work Restraint Systems, Nets & Rope Access Standard
All planning for working at height shall include risk assessments and Safe Sequence of
Works, proving the selection of equipment has followed the following principles for working
at height:
Contractor must always use primary fall protection in the first instance that complies with
working at height and other associated Standards;
Where primary fall protection cannot be used, are inadequate or incomplete, or there is still
a risk of injury from a fall, secondary fall protection must be used;
In some cases, a combination of both primary and secondary fall protection may be required;
Proper planning must be undertaken when setting up fall arrest systems, and the minimum
height that the system will be effective must be considered (i.e. the height of the person,
the length of lanyard, length of shock absorber, elasticity of the running line etc. usually
approximately 6m);
Personnel travelling to an elevated area more than 6 feet (1.83m) above ground level
where a fall exists shall make use of secondary fall protection;

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 11 OF 118
Vertical impaling objects (i.e. rebar) shall have the ends capped with a wooden block 2 x
4 inch (5 x 10cm), rebar mushroom cap, or similar which
All scaffolding shall be erected under the supervision of a competent DAR Engineering.

All scaffolder must have third party scaffolding training and


certificate. Inspection of scaffolds will be carried out on daily basis.

27. Horizontal Lifelines / Running Lines


Horizontal and running lifelines are to be manufactured of either double-braid fiber rope,
kern mantle rope (non-stretch) or webbing; synthetic rope must not be used in horizontal
position for fall protection (because of stretch and sag of the line). They shall be a
minimum of 16mm diameter with a breaking strain of 5000lbs (2268kg).
Where wire rope is used as a horizontal lifeline, the cable shall be of ½
“(12mm) diameter and shall be secured on each end by 3 cable clamps.
Horizontal and running lifelines shall be installed and maintained by persons competent in
the rigging practices necessary to ensure adequate lifeline systems. A minimum safety factor
of 2 must be maintained at all times.
Lifelines in use shall be inspected weekly by the competent person that installed them.
Lifelines shall be of a unique color to ensure they are easily identifiable and are only used as
lifelines. Lifelines shall be used for no other purpose.
Horizontal lifelines should be positioned so as to provide points of attachment at least waist
level or higher.
Intermediate supports shall be adequate to minimize sag and vertical deflection under
loading, a maximum of 10m between attachment points must be achieved.
There are numerous systems available for anchorage points on the general market ranging
from webbing slings and strops, to eyebolts and chemical anchor sockets. Whichever
system is chosen as the anchorage system, anchorage points for horizontal and running
lifelines must be capable of supporting 10800lbs each.
Softeners shall be used where lifelines contact sharp edges to prevent damage.
Lifelines shall be arranged to provide adequate mobility in all areas, whilst maintaining
100% fall protection.
28. Vertical lifelines / retractable lifelines
Used for personnel fall protection when vertical mobility is required, they must be made of
synthetic fiber rope or cable equipped with rope grabs, or they may consist of self-
retracting reel type lanyard attached directly to a safety harness.
Static rope lifelines with rope grabs are required for each person working from suspension
scaffolds or for erection and structural steel erection where tie-off points are limited.
Static rope lifelines must be anchored independent of all other systems at the top and
must be capable of supporting 5000lbs (2268kg).
Sliding rope grabs, retractable lifeline devices, shackles, karabiner and slings must be
manufactured to an internationally recognized standard (i.e. EN 362 / ANSI Z359.1). All knots
in the fiber rope used must be a double-figure of 8.
Sliding rope grabs approved for the size of rope are the only method for securing a safety
lanyard to a vertical lifeline. Lanyards shall not be attached to lifelines by means of knots or
loops.
Rope grabs shall be positioned on the lifeline at least above shoulder height.
Retractable lifeline devices shall be secured by means of shackles, karabiners and wire rope
chokers or synthetic slings capable of supporting 5000lbs (2268kg). Rope (synthetic or
natural fiber) shall not be used to secure these devices. Each retractable lifeline device shall
be equipped with a rope tag line for extending.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE7 12 OF 118
Rope Access
Rope access (static rope technique & abseiling) is only suitable for general light work and
inspection, and should not be used for construction works.
If access from a working platform, man-lift or man-basket is impracticable, Contractor must
submit risk assessment and safe sequence of works to Employer or its Representative for
approval prior to any works commencing.
Only persons trained in rope access equipment and procedures to an International Standard
(i.e. IRATA) shall be allowed to conduct such activities.
All rope access equipment must be 3rd Party inspected on a six-monthly basis; records to be
kept and available Employer or its Representative upon request.

29. Roofing & Fragile Surfaces & Openings Standard


Ref to ROSHN HSSE Manual : RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00025

On new builds, Contractor shall follow all design drawing instructions relating to supplied
edge protection during roof work, and use all facilities provided. If the designer has omitted
provisions, the following requirements within this Standard of temporary protection must be
met by the Contractor.
Before any refurbishment works commences, Contractor shall acquire from the building
owner information and details on the integrity of the roof structure, capability for support,
and maximum weight allowable during work, including structural calculations.
Contractor shall conduct a Risk Assessment and Safe Sequence of Work for all roof work,
which is to be included in the Construction Phase OH&S Plan.
The following typical hazards should be considered if applicable:

The capability of the roof to support intended loads;


Overhead power lines;
Fragile material;
Roof lights made of glass or translucent material;
HVAC or exhaust outlets that may be emitting noxious gases or
smoke; Antennas / communications equipment.
The Risk Assessment and Safe Sequence of Work must include all measures to be used to
provide fall prevention, fall protection of people and materials, and the protection of
workers on lower floor levels, and any others at ground level that may be in the vicinity.
All fragile surfaces, roof lights and other openings (such as service ducts, risers etc.) must be
provided with a physical barrier (i.e. guardrail, mid-rail & toe-boards), or securely covered.
Physical Barriers must be provided; tape, rope or string is not sufficient
Roofing work activities must stop when wind speeds reach 23mph (37 km/h or 10.2 m/sec).
Only sufficient material for a maximum of 2 days’ work shall be stored on roofs. No
materials or tools may be stored within 6 feet (1.83m) of a roof edge unless guard rails,
mid-rails & toe- boards and secure netting are erected.
All material must be secured at the end of each shift, considering forecasted weather
conditions. Waste and material must be secure and removed at the end of every
shift.

For access to roofs, a tower may be provided, however consideration must be given to
access for tools, equipment and materials
Employees engaged in roof work shall be trained in safety procedures to be followed to prevent a
fall. The minimum content of training shall include:

The function, use and operation of the safety harness and lifeline system to be used;
The correct procedures for erecting, maintaining, and disassembling
the fall arrest safety system to be used;

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE80 OF 118


The nature and location of fall hazards in the work area, near a roof
edge, all openings and fragile surfaces;
Limitations of use on the systems to be used;
Correct procedures for material and tool
handling; Emergency contingency plan;
Access & egress (i.e. correct use of a ladder).
Roof access and work shall generally be prohibited at night.
Tools used at the leading edge of roof work must be placed in a tool bag/pouch and be
attached by a lanyard to the employee to prevent tools from falling.
Wherever roof works is to be conducted, a safe area shall be cordoned off at ground level to
prevent persons being struck by falling objects from height.
It is not acceptable for open steelwork, plywood sheets, insulation or cladding to be used as
a working platform.
Where work is to be performed at a distance from the roof edge, then barriers erected
around the immediate work area will serve as the fall protection.
Work shall not be carried out on chimneys by resting ladders against them.
No working platforms or material shall be stored over any floor openings or
covers. Employees creating an opening in a wall or floor must have authorization
from their
Supervisor. The Contractor is to arrange for the opening to be covered in accordance with
the above requirements
If a floor opening cover or wall opening cover needs to be removed for a short period of
time, an employee must be assigned to guard the area to warn people of the hazard. Covers
are to be replaced immediately works have been completed

Work at Height possible list of activities:


Mobilization and Preparation of Site
Offices Pre-cast Wall Lifting and
Installation
Scaffold erection, modification and
dismantling Installation of Structural Column
Roofing Installation
Installation of roof slab
Installation of EOT Crane and Load
testing Installation of Cable Tray Support
Lighting Installation
Installation of Fire Suppression System & Fire Alarm
System Installation of HVAC System
Building doors
installation Cable Pulling
Painting work
Installation of Power Transformer
Foundation and ground shuttering and de-shuttering forms, concrete
pouring Erection of upper, common & super body structure
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE8 1 OF 118
30. Hot Work Permit (Red Color)

The purpose of the Hot Work Permit is to control work activities that may produce sufficient energy to
ignite flammable atmospheres or combustible materials.
Hot work permit system is used for any activity, which involves welding, cutting, brazing, soldering,
grinding and any work that involves fire or heat as source or outcome of the activity being
performed. Hot work includes any of the following work activities.

All forms of welding.


Oxy acetylene
cutting.
Grinding or cutting using abrasive
tools. Stress relieving.

Persons undertaking Hot Work must be accompanied by an assistant whose duties will include that of
fire watcher and monitoring of the work area after the work has been completed.

All Hot Work shall be performed in accordance with both national, client fire prevention strategies and
as specified in ‘Hot Works’.
Permit to work to be issue according Roshn permit procedure.
This type of work permit can be applicable if this condition of work
existed: Welding.
Burning.
Brazing.
Propane soldering.
Oxyacetylene cutting.
Grinding ferrous metals.
Torch applied roofing.
Heat gun

Hot Work possible list of activities:


Mobilization and Preparation of Site
Offices Fabrication and steel fixing
Installation of steel
casing Grounding
installation
Asphalt cutting
Access road and structure
preparation Water Proofing
Membrane application Cable
termination

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 2 OF 118
Application of asphalt pavement
Heating, coupling and connector installation & Cable jointing works

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 3 OF 118
Installation of Cable Tray
Support Installation of
Transformer
Lighting Installation
Building doors installation

31. Cold Work Permit (Green Color)


The purpose of the Cold work permit is to control work activities that will not produce sufficient energy to ignite
flammable atmospheres/materials. Work with hand tools, sand removal, asbestos removal or repair, scaffold erection,
brush painting, etc.

Cold Work possible list of activities:


Ground Preparation for Lean
Concrete Lean Concrete Preparation
& Pouring Concrete pouring
Shuttering & De-shuttering works
Ground assembling of tower bottom and
superstructure. Building Signage, Road Marking, Crash
Barrier Installation Flood Testing on Roof
Blasting operation
Cable Pulling 380/110/13.8kV Using Winch
Machine Brick or tile laying
Sand bedding
Wire mesh and warning tape laying

32. Site Safety Rules


1..1 General Site Rules

All Employees of Contractors shall abide the general safety rules and shall:

Report unsafe conditions to your Supervisor/Foreman so that necessary corrective action will be
initiated immediately.
Promptly report all injuries to your immediate Supervisor/Foreman and obtain the necessary
medical help.
Properly care for and be responsible for all personal protective
equipment. Always wear hard hat on the job site.
Use eye and face protection where there is a danger from flying objects or particle, such as
when grinding, chipping, and welding, etc.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 4 OF 118
Dress properly. Wear appropriate work clothes and shoes. Loose clothing and jewelry should
not be worn.
Use suitable gloves whenever necessary.
Do not operate machinery or equipment if you are not authorized to do so.
Never operate any machine unless all guards and safety devices are in place and in proper operating
condition.
Do not stand or sit on the sides of any moving
equipment. Be alert and keep out from all overhead
loads.
Keep all tools in safe working condition. Never use defective tools or equipment and report any
defective tools or equipment to your immediate supervisor promptly.
Do not throw tools or materials from height. Never leave them where they may accidentally
drop on persons below or in any path where free movement is obstructed.
Practice good housekeeping always. Keep your tools and surroundings clean and the equipment in
its proper place.
Use proper aisles, walkways, stairways, roads, or other point of egress instead of short
cuts. Smoking is restricted in many work areas. Smoke only in the designated areas.
Never start new work that is strange to you without proper instruction from the supervisor.
Clarify all job-related doubts from him. (In times of emergency/fire/other matters, coordinate to
your lead man/foreman to go in the assembly point.)
Comply with all known Government safety laws as well as employer regulations and policies.
All posted safety rules and warning signs must be obeyed. They must not be removed without
authorization.
Horseplay causes accidents, so will not be tolerated.
Failure to wear Personal Protective Equipment (eye protection, hearing protection, safety helmets,
etc.).
Failure to follow recognized industry practices.

1..2 Life Critical Rules

Drinking alcohol, and/or drug abuse prior to or during working hours or after working hours are
against our company regulations and Saudi Arabian Government laws.
Fighting, provoking, or engaging in an act of violence against another person on Company property
Theft, Willful damage to property
Not using safety harnesses and lanyards when there is a potential for
falling. Removing and/or making inoperative safety guards on tools and
equipment Tampering with machine safeguards or removing machine tags

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 5 OF 118
or locks

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 6 OF 118
Removing barriers and/or guardrails and not replacing them
Failure to follow rules regarding the use of company equipment or
materials. Major traffic violations while using a company vehicle.
Engaging in dangerous horseplay
Failure to notify the Company of a hazardous situation, and other major violations of company
rules or policies.

1..3 DAR Engineering Disciplinary Procedure

Employees at all levels will be subject to progressive DAR Engineering discipline for non-compliance with
their respective responsibilities. Progress DAR Engineering discipline will include:
Informal verbal
warning, Formal written
warning,
Suspension from work without
pay, Termination.
Safety infractions that could result in serious physical harm or death may result in immediate termination.

33. Management Contractor


All Contractors are to be managed in accordance with the following procedure.
The use of contractors must be pre-approved by ROSHN . Approval requirements include:
A formal safety review of the Contractor/subcontractor being performed by ROSHN safety
department and subsequently by DAR ENGINEERING.
The DAR Engineering of the review must commensurate with the hazards and risk exposure.
The Contractor/subcontractor agrees to abide by our Drug and Alcohol policy and onsite safety
rules throughout the duration of the work.
Any subcontractor that has a “Non-Approved” safety status will not be used on any ROSHN / Dar
Engineering site.
Contractor are responsible for meeting all HSE requirements, ensuring that their subcontractors
are aware of and comply with all ROSHN HSSE Manual / procedural requirements.
In some cases, DAR ENGINEERING / ROSHN HSE Department may require organizations to pre-
qualify prior to be allowed to bid to carry out construction work. In such instances the Contracts
Department will inform prospective bidders of the process to be followed.

Selection and Appointment of Contractors


For HSE aspects, Sub-contractors will be pre-qualified by DAR ENGINEERING HSE by
reviewing their safety programs, safety training documents and safety statistics. DAR
ENGINEERING HSE and ROSHN shall review of subcontractors’ OSH personnel
competency.
Ongoing Management of Subcontractors
Once awarded, the contractors HSE shall engage and monitor the subcontractors and
ensure their compliance with project HSE requirements.

34. Rewards and Recognition


DAR ENGINEERING always promotes Positive safety Culture and one way doing so is the reward
program which aims to motivate workers to follow safety at all the time.
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE8 7 OF 118
The contractor should practice the same.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 8 OF 118
Process:

To do this contractor will choose 4 People Monthly for Best Contribution towards Safety. Project
Manager and DAR ENGINEERING/ ROSHN will be called on to handover the certificate to selected
employees.
Project Safety Manager will select the best Workers on recommendations from Safety team, DAR
ENGINEERING/ ROSHN Site team. No employee can be selected for consecutive 2 months.

Voucher cards / Cash Prize can also be included as per project Management decision. Ref ROSHN HSSE
Manual

35. Stop Work Procedure


1..1 Authority

Prior to calling a stop work, contractors’ employees and subcontractors must attempt to
remove, mitigate or isolate the hazard in conjunction with the controlling site supervisor.
If the contractors’ employees and subcontractors are not satisfied with the mitigation measure,
then they have the authority to stop work. The contractor’s employee must notify their safety
officers / safety managers of the stop work event immediately.

1..2 Work Suspension

Establish the requirements for contractors’ personnel to stop work if they believe a danger
exists to any persons, property or the environment that cannot be removed, isolated or
mitigated to as low as reasonably practicable.
This procedure shall apply to all contractors-controlled operations in bus project and all work
activities carried out by contractors employees, contractors and subcontractors.
1..3 Corrective Action

Work associated with the affected area or operation will not resume unless all corrective actions
identified in the applicable incident report have been completed and closed.
All personnel affected by the Stop Work will be briefed on the corrective actions and
preventative measures taken.

36. Management of change


In construction, the term 'change management' can sometimes be used to refer to change control
processes where changes to a task or method statement – which may have impacts on safety, time,
cost, or quality – are assessed and approved.

Project changes and/or adjustments are inevitable as they are a fact-of-life at all stages of a project's life
cycle. Managing changes effectively is crucial to the success of a construction project. Change Management
in construction requires a solution to DAR Engineering discipline and coordinate the process, for
example, assessment of risk, documentation, drawing, information briefing & monitoring.

Contractors will manage the process for a work activity that had not previously been supported by a
method statement, this will include the following activities:

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 9 OF 118
Work activity temporarily suspended.
Construction Manager, Engineer, HSE Manager and other subject matter experts to be
consulted on the evaluation of a suitable work methodology
Dynamic risk assessment to evaluate hazards, risks and mitigation measures carried
out Alterations to the work method statement to be formally documented, reviewed
and
approved by Site Management and SMEs
All involved personnel to be briefed on the changes to the work
method Work activity monitored by Supervision
Work continues or suspended until a safe system of work can be implemented.

1..4 Responsibilities

Department manager

The department manager is responsible for evaluating OSH perceived risk in their respective area
caused by changed to the start of any work, in the line with procedure.

OSH Coordinator

The OSH Coordinator will assist the department manager in the implementation of this procedure.

37. Welfare and Sanitary facilities

1. Ratio of Toilet
Toilets will be provided at site as per ROSHN requirement and will also comply client H&S policy for
sanitation. All such facilities will be fitted out with washing basins as needed to maintain hygienic
conditions. Sewage DAR Engineering in charge of the toilet – and washing facilities will be constructed
via (readily available prefabricated) septic tanks of proper capacity. The effluent water from those these
septic tanks will be DAR Engineering in charged in accordance with local regulations.

2.Toilets/urinals and washbasin ratio chart


No. of Persons on Site No. of Toilets No. of Washbasins
1–5 1 1
6 – 25 2 2
26 – 50 4 4
51 – 75 5 5
76 - 100 6 6

3. Rest shelter
Temporary aluminum portable rest shelter with seating will be provided at or near the workplace for
persons engaged in work at site to prevent wind, rain and heat.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 10 OF 118
4. Portable water
Potable water will be provided to the temporary site offices and working area, to be taken from the
local water supply distribution system provided by Client or which has been approved by client.

In addition, working are contractors will provide appropriate portable igloo water cooler for workers

In the event water from this supply will be unsuitable for drinking purposes specific drinking water need
to be delivered from this supply via a (readily available) filtration unit for that purpose. Such drinking
water will be daily freshly distributed in heat-insulated containers to "remote" workplaces. Certification
of filtration system tests results shall be approved by Client before distribution. And portable drinking
water should be tested on regular basis to check its portability and compliance with client requirements.
All the test resulted, and certificates should be properly documented.

5. Waste control
Waste shall be stored in designated area from where it shall be discarded as per ROSHN Environment
Procedures.

6. Cleaning of facilities
Contractors will provide separate team for housekeeping and project environmental department will
maintain inspection and record.

Tools, ropes and other materials not in use will be stored away and all rubbish cleared up
promptly.
Slippery surfaces will be treated immediately, as they are extremely dangerous;
Oily or greasy surfaces will be gritted or treated with industrial salt or sand (or other type of
appropriate absorbent material)
Drip trays will be sand filled and set beneath all machinery to prevent the development of
oily, slippery surfaces and, especially on pontoons, to minimize fire hazards
All spillages will be cleaned up as soon as practicable, spill kits will be available onsite and
include booms that can be deployed on water.

38. Personal Protective Equipment


1..1 Introduction

Contractor to ensure to create a safe and healthy work environment for all its employees. Workplace
present special hazards to the individuals those working there, necessitating the application of engineering
controls, administrative controls, and the use of personal protective equipment to protect against
workplace hazards. The use of personal protective equipment is an integral part of minimizing hazards
but should only be considered after all other controls have been exercised. The Subcontractor shall
provide personal protective equipment (PPE) for Subcontractor’s personnel such as safety belt, eye
protection, respiratory equipment, and hard hats. Subcontractor shall train their employees to wear
appropriate personal protection equipment that is maintained in good condition. Subcontractor's
employees shall not commence work until proper protective equipment is always worn while on-site. All
employee staff and visitors shall always wear the appropriate specific PPE when they are on the work
SITE.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 11 OF 118
1..2 Purpose

The purpose of the Personal Protective Equipment (PPE) Program is to protect employees from risk of injury
or death by creating a barrier against workplace hazards. The PPE program addresses eye, face, and
head, foot, and hand protection. Components of our company’s Respiratory Protection Program and the
Hearing Conservation program are also a part of this program.

1..3 Responsibilities

The Safety and Health Manager will be responsible for assessing the hazards and exposures that may
require the use of PPE, determining the type of equipment to be provided, and purchasing the
equipment. Input from managers, supervisors, and employees will be obtained and considered in selecting
appropriate equipment. Managers/supervisors will be responsible for training employees in the use and
proper care of PPE, ensuring that all employees are assigned appropriate PPE, and ensuring that PPE is worn
by employees when and where it is required.

1..4 Mandatory PPE

The use of Personal Protective Equipment (PPE) forms the final line of defense between employee and
hazard and applies to all employees at the work site, including the Contractor, visitors and client or
customer representatives.
Contractors follows a Four-Point PPE Practice: Hard hat, steel toe boots, high visibility jacket and safety
glasses. If any materials are to be handled, then gloves shall be worn as well

1..5 Task Specific PPE

Specific PPE shall also be specified in Method Statements and Risk Assessments such as glove type (i.e.
material, level of protection, etc.). Where possible, hazards will be eliminated or controlled to reduce
the risk associated with a specific task.
These controls include:
Elimination of the
hazard Isolation of the
hazard
Administrative Controls
Contractors will make available all required PPE for its employees. All employees will receive training
in the use, care, maintenance and storage of the PPE issued to them.
All personal protective equipment will be within the requirements of the local HSE legislation, industry best
practices and standards. Where site-specific PPE requirements exist all the employees, Contractors, visitors
and Stakeholders on the Project, will follow those requirements.

1..6 Issue and Maintenance of PPE

No piece of PPE will be modified or changed contrary to the manufacturer’s instructions or


specifications or HSE legislation.
All PPE that is of questionable reliability, damaged or in need of service or repair will be removed from
service immediately.
Defective PPEs to be removed from site to prevent it from being in circulation

39. Occupation Health


1..1 Pre work Medical Assessment

Contractor will ensure complete physical exams as part of

practice 1..2 Pre-Employment medical and monitoring.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE8 12 OF 118
Contractors has to ensure pre health inspection periodic basis.

1..3 Plant and equipment operator medicals

Contractors will ensure medical fitness for specified occupations included:

Eyesight
Color vision
Fit

40. Night works


Night work procedure outlines minimum requirements for any work that is done during the
hours of darkness where general illumination/ Lighting is required.
This procedure applies to Contractors and its subcontractors for all activities that will
commence at the Project.
Dar Engineering will be notified for any Night work activities see the attached Night Work
Notification appendix.
No Night work shall commence without Health and Safety coverage at site.
All points of entry, passageway and muster point shall be clearly illuminated and marked.
Illumination shall be measured by light meter, calibrated in LUX, during the light setup and
periodically thereafter.
Tower lights shall be installed in a matter that illuminates whole work
area. All confined space area shall be provided with adequate light.
Back lighting shall be provided in case of power failure.
Lighting poles and other metal poles shall be grounded, and the circuit fitted with RCD.
Temporary electrical installation shall meet ROSHN/Dar Engineering or National electric
code. Broken or damage electrical bulbs/ cords shall be repaired/replaced.
Competent electrician shall be available at site during night
works. Nurse and ambulance shall be provided during any night
activities. All work to be carried out shall comply with approved
JHA.

Contractor will submit a Separate Night work Plan with Method of Statement and Risk Assessment. If there
are...

41. Heat Stress


The relevant Engineer/Supervisor will ensure that:
Adequate ventilation and air movement is provided in enclosed environments that may become hot;
and appropriate work and rest regimes, relating to the physical fitness, general health, medication
taken, and body weight of each worker exposed to heat, are implemented.
To determine the level of heat-related risks for a worker, assess the following factors:

Environmental conditions (e.g., Air temperature, radiant heat, humidity, air


flow). Physical work (e.g., Strenuous or light).
Work organization (e.g., the duration, exposure to heat, time of day); and Clothing (e.g.,
heavy protective clothing).

1.1. Acclimatization Process for New comers inside Kingdom of Saudi Arabia.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE90 OF 118


It’s no secret that Saudi Arabia is a hot country, the heat can be excruciating and that’s no surprise as
the kingdom is near the equator, almost entirely a desert, and very rarely ever rains. The weather is
totally predictable, in the summer it’s hot and sunny every day and in the winter, it’s warm and sunny
every day.

According to the available literature, workers in hot climate countries, similar to the study cohort, can
heat acclimatize faster than those in other Western countries.

New employees are at the highest risk for heat illness. Acclimatization is crucial to working in hot
conditions

what do you need to carry around with you at all times to ensure your comfort, like water, , an
umbrella, gloves… Whether you can continue with your exercise routine outdoors or if it is simply too
hot to bear. How long can you stay out in the sun without feeling terrible or when are the best times
to go outside.

Allow workers to acclimatise to their environment and identify which workers are
acclimatised/assessed as fit to work in hot conditions.

Managers should have a formal acclimatization plan for employees working in the heat. Starting new
employees at full intensity is not safe.
Adjustments to the acclimatization Contractors schedule may be needed depending on the worksite’s
situation and on individual factors.
A combination of these conditions can cause heat stress or heat stroke and the effects can range from
simple comfort to life-threatening illnesses. Heat stress reduces work capacity and efficiency.
Control measures for preventing heat stress will include:

Providing adequate ventilation.


Reducing items of heat-producing equipment in the closed vicinity.
Monitoring air velocity and wet bulb temperature regularly, determining cooling effect,
Assessing and recording results.
Regulating air flow, or modifying ventilation in enclosed areas, to ensure adequate
cooling. Refrigerating the air supply in extreme conditions.
Providing additional ventilation fans to create air flows in low flow
areas. Rotating people in hot areas.
Providing rest breaks in cool environments.
Providing shaded rest shelters across the site for workers who are exposed to direct
sunlight. Educating people to recognize symptoms of heat stress.
Providing cool drinking water – current industry practice suggests workers drink half a litter
of water each hour when hot environments cause excessive sweating; and
Providing PPE for surface heat exposure (e.g., Shade, hats).
Summer working hours As per Saudi Law, from June 15 to Sep 15 no worker can work under
direct sunlight from 12pm to 3 pm.
Summer work ban starts from 15 June to 15 Sep every year.
All workers exposed to direct sun shall be transport back to camp or adequate rest shelter area
to provide for workers to take rest during summer work ban.

42. Personal Protective Equipment (PPE)


The definition of Personal Protective Equipment is very broad and covers all protective equipment such
as helmets, footwear, clothing, overalls, gloves, life jackets and safety harnesses. Ordinary working clothes or
clothing provided which is not specifically designed to protect the health and safety of the wearer is not
within the definition.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 1 OF 118
All PPE is to be maintained, replaced, or cleaned as appropriate & necessary information,
instruction and training shall be given to those required to use it.
All P.P.E and its usage shall conform to the requirements of ‘Personal Protective Equipment’s’.
Which is acceptable to the Contractor.
As a minimum, ALL staff and operatives and visitors to site, are required to wear the
following minimum safety apparel: -
- Safety Helmet
- Safety Shoes with protective toe caps
- Hi-visibility Vest.
- Safety goggle
- Hand Gloves

The Contractor HSE Manager shall ensure that there are always adequate stocks of the
safety apparel on site to accommodate visitors to site.
The PPE’s will be inspected to ensure that it comply with Approved International standards
e.g., ANSI or EU.

43. Noise and Vibration


Vibration: A vibrating motion can be DAR Engineering dilating, reciprocating, or periodic.
Vibration can also be either harmonic or random
Action level: the levels of exposure to noise averaged over a working day or week or maximum
noise to which an employee is exposed in a working day
Decibel (dB) - the unit of measurement for the loudness of a sound
First Action Level: 85 dB (A); Second Action Level: 90 dB (A); Peak Action Level: 140 dB

During construction activity it is not anticipated that any person will be exposed to noise levels
that are in excess of 85 dB (A) on an 8- or 10-hour time weighted average (TWA)
An important factor in preventing HAVS is by reducing the time which employees are actually
exposed to vibration. The daily exposure limit value for whole body vibration is 1.15m/s2 and
the daily exposure action value for whole body vibration is 0.5m/s2. The daily exposure limit
value for hand-arm vibration is 5m/s2 with the daily exposure action value for hand-arm
vibration is 2.5m/s2
Contractor Supervisors are to ensure a vibrating tool is shared between a team of employees,
as opposed to it only being used by one person all day; by rotating such personnel to other
areas of work will considerably lessen the effects of vibration on the actual user, lessening the
chances of ill-health effects by the use of the vibrating tool.
Typical sound levels of construction equipment are as follows; however, information must be
sought from the Manufacturer or Construction Plant Hire Company regarding specific
machines:

 Hand Tools – electric 95


 Hand Tools – air 100
 Forklift Trucks 101
 Hammer Drill 102
 Dumpers 103
 Concrete Mixer 104
 Hand Tools – petrol 105
 Tower Cranes 106

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 2 OF 118
 Circular Bench Saws 107
 Medium Trucks 108
 Excavators 109
 Crawler Cranes 110
 Haulage Trucks 111
 Ready-mix Concrete Trucks 112
 Rock Drills 115
 Batching Plant 116
 Generators 117
 Drop Hammer (sheet piles) 118
 Cranes 119
 Compressors, Compactors 120
 Bulldozers, Graders 121
 Vibrating Hammer (sheet piles) 125
 Single acting air hammer (pre-cast) 128
 Double acting air hammer (sheet piles) 138

Acute short-term exposures to impact noise exceeding the threshold may be experienced during
some activities, which shall be managed by the Contractor by reducing employee exposure, and
enforce the wearing of personal protective equipment when working in proximity of the
operations as per Roshn procedure RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00024 Personal
Protective Equipment (PPE) Standard.
It is anticipated that some static equipment situated on lay-down areas may produce a noise
level in excess of 85 dB (A). Supervisor must therefore locate any potential noise sources a
minimum distance of 30m away from offices and other facilities normally occupied. For all
maintenance staff of these equipment, permanent and suitable hearing protection must be
provided.
When areas have been identified that meet the above criteria in above paragraph Contractor
must conduct a noise level survey and risk assessment by a competent person for that area using
a calibrated noise/sound level meter; records to be kept and made available to Employer or its
Representative on request
44. MEPI
To minimize the risk of injury to pedestrians within the site, designated pedestrian footpaths with adequate
lighting will be provided by DAR ENGINEERING. These designated pedestrian footpaths will be identified by
either hard barriers or plastic mesh fencing and appropriate signage will be provided. Pedestrian routes are
to be kept clear of any potential tripping hazard. Where designated pedestrian routes need to cross site
haul roads, a designated pedestrian crossing with appropriate signage will be provided.
The principal pedestrian routes on site will be indicated on a drawing showing haul roads and pedestrian
routes within the TMP. These routes will be subject to change to suit the progress of works on site.
Where significant changes are made, the haul road/pedestrian routes drawing will be updated and
reissued.

45. Scaffolding.
A temporary structure used to support a work crew and materials to aid in the construction, maintenance, and repair
of structures
For all external working at height where the risk assessment shows that Scaffolding is to be constructed;
only "Open Tube & Clamp" or "System" Scaffold is acceptable.

Mixing of different systems or types of Scaffolding shall not be employed on site.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 3 OF 118
For all external working at height where it is calculated that there will be more than 1 Lift Height, only
"Open Tube & Clamp" or "System" Scaffold is acceptable.

For Contractors, all planning for Scaffolding shall include risk assessments and safe sequence of work
which are to be included in the Construction Phase OH&S Plan.

All Scaffolds over 10m long, over 8m in height, hung, cantilever or suspended Scaffolds must be
designed by a qualified, professional structural engineer. All calculations and the design drawing(s) must
be included in an Appendix of the Construction Phase OH&S Plan, that can be extracted and used as a
Scaffolding Plan. Once erected, designed Scaffolds must be approved and signed off by the structural
engineer as being built to the design.

Protection of persons against falling materials should be provided by the use of nets, brick guards, toe-
boards, fans and by the use of barricades at ground level where practicable. All fans must be designed
by a qualified, professional structural engineer. All calculations and the design drawing must be
included in the Construction Phase OH&S Plan.

Special attention must be given to loading and unloading of materials and the removal of waste debris
from the Scaffold. All loading bays intended to be incorporated into large Scaffold structures must be
designed by a structural engineer, and the design and calculations made available to Employer or its
Representative for approval prior to erection. Waste chutes are considered best practice for large waste
removal at height.

The distance apart of transoms must not result in a bay length of greater than

Very light duty (0.75Kn/m2) – inspection, cleaning, painting 2.7m

Light duty (1.5Kn/m2) – plastering, painting, glazing and pointing 2.4m

General purpose Scaffold (2.0Kn/m2) – general construction work, rendering, plastering 2.1m

Heavy duty Scaffold (2.5Kn/m2) – block work, brickwork, heavy cladding 2.0m

All working platforms must comply with ROSHN HSSE Procedure : RRE-HC-HC1-A00-NSP-RRE-HSE- PRO-
00031 Working Platforms Standard
All Scaffolds must be prevented from collapsing or tipping by secure attachment to the bearing surface
or to another structure by the means of the following methods:

Reveal tie
A tube may be wedged or jacked tight into opposing faces of an opening. The reveal tie should be
attached to the reveal tube within 150mm of the end of the opening face.

Through tie
This type of tie relies on a tube, usually placed vertically inside an opening. The tube should
preferably rest as close to one edge of the opening as possible.

Box tie
This forms an assembly of tubes and couplers around columns or other parts of a structure. It must be
at the level of a Scaffold lift and joined to both inside and outside ledgers or uprights.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 4 OF 118
Lip tie
An alternative form of tie takes the form of an "L" shaped arrangement of tubes and couplers, which
hook the Scaffold behind elements of the structure.

Specific to Mobile Tower Scaffold

All mobile towers should be properly constructed as per Manufacturer's instructions by competent
persons.

The mobile tower structure must be of sufficient strength and rigidity for the works. It must be secured
in position, castor wheels locked before anyone accesses the tower, and if the working platform is over
3m in height, the tower must have outriggers added.

Placing steps, ladders or other platforms on the working platform to gain additional height is dangerous
and therefore prohibited.

Under no circumstances must any attempt be made to climb up the outside frames of a mobile tower,
and all access must be made by use of a ladder (on the internal of the structure) or purpose-built frame.
No ladder of any description must be leaned against the outside of a mobile tower. To do so would
cause the tower to become unstable and add to the risk of overturning the tower.

No attempt should be made to move tall, fully-erected towers. The tower must be reduced to a safe
height appropriate to the ground conditions. Normally as guidance, the height should not exceed 2 1/2
times the minimum base dimension. Move the tower manually from the base only; not by vehicle or
construction plant. No persons or materials must be on the tower during movement.
Fixed or mobile Scaffolding with work platforms that are 4 meters or greater in height shall
be: Inspected daily.
Erected under the supervision a competent and experienced Scaffolder who holds a current
certificate of competency.
Certified by the Scaffold inspector or a competent person as being safe to use and in compliance
with relevant statutory requirements and standards.
Isolated by danger tags or warning signs if the Scaffold is incomplete or left unattended.
All Scaffolds constructed on Hofuf site shall:

Have ladder access and extend 1m past the


landing. Have handrails and mid-rails.
Have tied or locked
decking. Have toe boards
fitted.
Be designed to carry the anticipated load.
Be tied in or have outriggers fitted when height is twice the base or
more. Not have any modifications or damage to any component.
The Scaffold structure will be inspected daily by a competent person. Erection, alteration and
dismantling of any complex designed Scaffolding (e.g., suspended Scaffolds, shoring, temporary roofs
etc.) should be undertaken through the direct supervision of a competent person; this should be a
qualified “Scaffolder” or a design engineer providing they possess the necessary industry experience or
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE9 5 OF 118
alternatively an individual

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 6 OF 118
who has received training under a recognized manufacturer/supplier to the limit of the configuration(s)
involved.

Scaffolding determines with color tag system: (RED, YELLOW.

GREEN) Red Tag


The red tag is attached to inappropriate Scaffolds, which are not allowed for working activities and which
are going through assemblage or disassembling process.
Yellow Tag
It is attached to the places where use to full body harnesses is mandatory.
Green Tag
Is attached to appropriate Scaffolds which are allowed for working activities without Safety harness.

46. Ladders
Ladders shall only be used when other means of safe access are impractical. Usage of ladders shall be
limited to temporary access for short duration tasks when other safer means are not practicable.
Ladders shall be used with the following precautions:

Ladders to be placed on a level and solid footing and secured at the top and if practical at the
bottom.
Ladders to be set up at an angle of 4:1 (Vertical: Horizontal)
Timber or fiberglass ladders to be used for work adjacent to live electrical conductors or power
lines.
All ladders are to be of an industrial grade.
Three points of contact to be always maintained.
If the worker is required to use both hands to safely perform the work, then other methods of
safe access to be given priority.
Wrist lanyards to be used for any small hand tools whilst on a ladder.
If the worker is required to carry heavy / large tools or materials up or down the ladder, then
other methods of safe access to be given priority.
Ladder will be inspected, and color coded on a quarterly basis.

47. Plant and Equipment Control


This section details the safety system practices providing an acceptable standard of plant safety on the
project.
The type of plant which may use on this project are:

Foundation Equipment e.g.,


Excavator Concrete trucks / Pumps

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 7 OF 118
Earthmoving plant &
equipment. Dewatering plant.
Lifting Equipment (Hoist/cranes/riggings, etc.)
Wherever possible, the use of 110-volt equipment should be encouraged on site for all small tools and
for temporary site lighting.

Control of Plant

Register shall be maintained for all rolling stocks detailing:


Plant Name, Model, and Registration & Serial
number. Manufacturer & Year of manufacture.
Certification status.
Activity in-charge/ Supervisor shall ensure that only approved plant is utilized for the operations and the
plant shall be operated as specified by the Manufacturer’s Instructions/Manuals ensuring:
Plant is equipped with approved rear end markings.
Each plant is equipped with approved fire
equipment. Personnel are qualified to operate the
plant.
Loading ratings on plant are within specified limits to prevent
overloading. Plant is operated to specified speed limits.
Under the supervision of a competent and authorized person.
In accordance with manufacturer’s/owner’s requirements.
48. Housekeeping
Housekeeping is to be considered an extension of every activity on the project.
Good housekeeping practices contribute to the prevention of injuries and have a positive impact
on the overall project health and safety. (Contractors Housekeeping procedures must be followed)
Supervisors shall be responsible for ensuring that vehicles and work areas within their control
are maintained in a tidy and safe manner and that materials and equipment not in use are neatly
stored away from work area and clear of access ways.
All offices and toilet facilities are to be cleaned daily. Supervisors and site managers are to
monitor the cleanliness of all facilities during their daily work routine around the site.

49. Fire Prevention and Control Measures


A key item of the policy and procedure is the “Actions to be taken on the outbreak of a fire”.
This document must be clearly displayed in prominent locations and communicated to all
employees, Contractors, Sub-Contractors, Visitors and Suppliers during induction training and at

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 8 OF 118
regular intervals. It should also be translated into the main language of the workforce.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 9 OF 118
All means of gape from a building or area are to be kept clear and free from obstruction.
All gape routes are to be clearly signed and indicate the most direct route to a place of safety.
Doors on designated gape routes shall not be locked with a key, or blocked so as to prevent
gape, and open in the direction of (gape) travel.
Gape routes shall be adequately lit, with either natural light or domestic lighting, and if
necessary, with emergency lighting.
The Project Safety Instruction (PSI), ‘Fire Precautions’ should be followed to ensure that
adequate fire precautions are adopted throughout the whole sphere at the operations.
C02 or Dry Chemical Powder portable firefighting equipment will be provided in all site offices cribs
sheds and storage areas. Portable firefighting equipment shall be provided on all moving plant
on the site.
All fire extinguishers are to be checked by a competent person on a six (6) monthly basis and a
register of inspections kept by the Safety team.
An adequate and sufficient amount of relevant fire-fighting equipment shall be located throughout
lay-down areas, offices and construction sites at designated, prominent “Fire Points” on the
following principles:

 1 per building (or 3000 square feet);


 For every floor of a building;
 1 within 50 feet (15.2m) where more than 5 US Gallons (18.9 liters)
of flammable or combustible liquids are being used;
 1 within 50 feet (15.2m) where more than 5 pounds (2.3kg) of flammable
gases are being used;
 1 every 75 feet (22.9m) in open offices and storage yards;
 1 every flammable or combustible liquids storage area;
 1 every fuel dispensing or vehicle servicing area;
 For every motorized vehicle or equipment.

Smoking is prohibited in all site offices, lunchrooms, toilet/wash facilities, and enclosed work areas.
Smoking will also be prohibited in work areas identified and sign posted as hazardous areas,
e.g., Chemical / flammable liquid storage areas, bush fire risks. However, designated smoking
areas will be provided for smokers.
There shall be a minimum of 5m between all temporary buildings and structures.
All offices shall be fitted with smoke detectors and there shall be a “no smoking”
policy in all offices.
Materials shall not be stored in a manner so as to obstruct access to fire prevention/protection
equipment (detectors/alarms/panels), fire-fighting equipment, control valves, doors, motors,
aisles or hallways that serve as a means of gape.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 10 OF 118
Aisles and hallways shall be a minimum of 36 inches (91 cm) wide.
There must be a minimum clearance of 18 inches (46cm) between materials and sprinkler heads
(where fitted).
Materials shall not be stored within 6 feet (1.8m) of any doorway or opening.
Materials storage shall comply with the separate RRE-HC-HC1-A00-NSP-RRE-HSE-PRO- 00028
Storage of Materials Standard.
Vehicles, Sheds, Garages & Workshops
Portable firefighting equipment must be positioned adjacent to a work area where Hot Work is
being undertaken.
The ROSHN Standards on RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00019 Hot Works and RRE-HC-
HC1-A00-NSP-RRE-HSE-PRO-00014 Engineering & Vehicle Workshops shall be complied with.
All Managers shall ensure on a regular basis that all staff including Contractors, Sub-
Contractors, Visitors and Suppliers are made aware of the actions to be taken on the outbreak of
fire, the method of raising the alarm, the location of assembly points, and the location of fire-
fighting equipment
Contractor shall ensure that an adequate amount of staff is competent to use the fire- fighting
equipment provided, and these staff are to form an Initial Response Team for fighting fires.
Accumulation of rubbish and waste materials shall be kept to a minimum, and is to be cleared
away at regular intervals, when required, or as a minimum, each day on the cessation of works.
Electrical installation must be performed by a competent electrician and conform to Kingdom of
Saudi Arabia electrical codes and standards for both temporary and permanent electrics.
Alterations and additions to wiring or fittings are only to be carried out by a competent
electrician.
All defective electrical appliances are to be taken out of use until repaired by a competent
person.
The use of multi-plug adaptors and home-made extension leads on a construction site are
forbidden.

Only plugs compatible with the electrical receptacles (sockets) are permitted
Cylinders are to be stored in a well-ventilated and shaded location, 25m away from all other
flammable stores.
LPG cylinders are to be kept in a separate storage area either 6.1m (20’) away from all other gas
cylinders, or a physical barrier a minimum of 5’ high must separate the two.
All cylinders must be protected against shock, especially falling, and high temperature extremes.
All cylinders (unless manufacturer instructions state otherwise – e.g. special gases) must be
stored and secured by means of a substantial chain or cable in the upright position, and fitted
with valve protection caps.
All cylinder storage areas shall be properly signed, and a “no smoking” policy within
25m enforced.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE9 11 OF 118
All welding and cutting operations shall conform to Roshn Procedure RRE-HC-HC1-A00-NSP-RRE-
HSE-PRO- 00019 Hot Works Standard.
A fire extinguisher with a 30lb (13.6 kg) Class A, B, C rating (as applicable) shall be at the work
location for all hot works.
Combustible liquids, including oils & greases, shall be stored in original containers or in storage
tanks, labeled with contents and capacity.
Flammable/combustible liquids and solvents are not to be used near ignition sources.
Only approved containers, safety cans and portable tanks shall be used for the storage and handling
of flammable and combustible liquids.
Approved, properly labelled storage cabinets (or drums) shall be used to store flammable liquids in
excess of 15 US Gallons (57 litres).
Permanent fuel storage tanks shall be maintained in a bunded area, with provisions made for
the handling of spills and groundwater protection.
All fuel lines shall be equipped with valves capable of stopping the flow of fuel at source, and all
piping valves and fittings shall be capable of withstanding working pressures compatible with
the type of liquid being stored.
All permanent fuel storage tanks and dispensing units shall be protected against collision
damage A fire prevention check shall be conducted at cease works on a daily basis, and, if Hot
Works have
been conducted, 1 hour after the termination of hot work
50. Environmental Standards

An Index of ROSHN Environmental Standards is as follows:

Reference Title
RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00032 Air Quality
RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00033 Conservation
RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00034 Environmental Monitoring
RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00035 Noise & Vibration Protection
RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00036 Soil & Groundwater
RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00037 Waste Management
RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00038 Water Quality

51. Air Quality Standard


The following areas and tasks have been identified as potential sources of fugitive dust
emissions. At a minimum, dust control techniques shall be employed in:

▪ Areas of heavy equipment and vehicular traffic;

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE 100 OF 118


▪ Keeping roads clean of tracked soils or excavated fill materials;
▪ Soil and fill excavation activities;
▪ Exposed excavation faces or disturbed ground surfaces;
▪ Soil and fill stockpiles;
▪ Soil and fill loading and unloading operations; and
▪ Soil backfill placement, grading, and compacting
Contractors shall not cause dust levels generated by the works to exceed the Kingdom of Saudi
Arabia Air Quality Compliance Criteria.
Contractors shall undertake adequate planning to minimize unnecessary operation of construction
plant and vehicles, including efficiency of trip times and reduction of double handling through
appropriate placement of stockpiles, storage and work areas.
Contractor shall ensure all equipment are in a state of good order and repair, not leaking petrol
or oils; volatile emissions shall also be controlled through minimizing unnecessary leaks, spills
and over-filling of engines.

52. Dust Control

Dust can be generated from natural sources (wind through a site or over an uncovered
stockpile) and also through anthropogenic sources (vehicle movements over unconsolidated
ground).
Contractors are therefore to instigate the following mitigation measures to reduce air quality
impacts:

▪ Paved areas and roads used for, and adjacent to, construction traffic will be
maintained free of tracked soil or fill materials. At minimum, paved traffic
areas, driveways, sidewalks, and roads will be cleaned on a daily basis by wet
spraying and/or washing. More frequent spraying will be provided where
necessary. Adjacent paved areas and roads will be left clean at the end of each
day;
▪ Stockpiled material shall be placed in sheltered/covered areas;
▪ Vehicle speeds shall be regulated on all un-surfaced roads to 25kph; Vehicles shall
▪ be restricted to defined access routes to minimize dust;
▪ Temporary access and haul roads shall be dampened down with water to
minimize dust from construction plant and vehicles on a frequent basis;
▪ Temporary access and haul roads shall be regularly inspected for integrity
and repair;
▪ Site exits are to incorporate wheel washes to minimize mud & dust being
transported onto public roads;
▪ Haulage trucks transporting bulk materials to, from and within the site shall be
covered with a suitable tarpaulin sheet;
▪ Road sweeping equipment shall be used to clean up public road adjacent to
site that has been affected by mud & dust from the works;
▪ Drop height of excavated materials onto the ground or into vehicles shall
be controlled to a minimum limit;
▪ Temporary cover and daily maintenance will be provided for soil or fill
stockpiles and keep active surfaces moist;
▪ Exposed excavations, disturbed ground surfaces, and unpaved traffic areas
will be maintained in a moist condition;
▪ Land clearing will be kept to a minimum so as to keep vegetation cover that
will stabilize the ground.
Smoke generated by bonfires (often when burning waste) is strictly prohibited on

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 1 OF 118
construction sites.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 2 OF 118
Food waste receptacles shall have close-fitting lids to prevent rodent and insect infestation, with
all food waste being taken off site on a daily basis. Food waste receptacles shall be regularly
cleaned and disinfected.
Long-term storage of wastes will not be permitted on site. In addition, for short-term storage,
no wastes are to be stored outside designated areas.
Contractor shall ensure proper storage of volatile fuels and chemicals in appropriately sealed
containers, in cool, covered areas with adequate venting; all containers shall be kept closed
when not in use.
Environmental practices focused on air quality preservation include minimizing the potential
dust and gaseous emissions and therefore, the following measures shall be taken into account:
Compacting and watering unpaved site ways in case it is necessary.
Excavations and grading operations will be suspended during dust storms or very high wind
speeds.
Provision of dust suppression through wetting during loading and unloading of trucks of
potential high dust impacts as deemed necessary.
Covering vehicles carrying earth dry materials or other powdered materials.
Ensuring equipment, machinery and vehicles are properly maintained and inspected to reduce
gaseous missions.
All vehicles shall be properly maintained to minimize excessive exhaust emissions and shall
comply with the Standardization & Metrology Organization.
Ensure all vehicles leaving the site are clean so that roadways remain dust free and usable for all
other neighbors, as well as in safe driving condition.
Reuse of non-potable water whenever possible shall be necessary to reduce the water
consumption for dust suppression.
All trucks and other vehicles where possible, will have their engines turned off when not
required.

53. Conservation:
Conservation planned management of a natural resource to prevent exploitation, destruction or
neglect

The following potential impacts may occur during construction:

 Disturbance of wildlife as a result of construction personnel and lighting;


 Disturbance of wildlife as a result of construction noise and vibration;
 Excavation and earthworks;
 Disturbance or loss of habitat; and
 Movement of construction vehicle and machinery

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 3 OF 118
Contractor is therefore to ensure that employees are instructed not to approach any wild
animals, swim or partake in fishing in any bodies of water, nor disturb nests of breeding birds
and dens of animals. Hunting and snaring of animals is to be strictly prohibited
Contractor shall provide receptacles around site to prevent propagation of unwanted fauna
attracted to food waste
Contractor shall not discharge water near native vegetation on a permanent basis, and shall
aim to use indigenous or adaptive plant species in land gaped areas.
Contractor is to brief employees working in protected areas on the importance of the area and
provided with working practices to be implemented to prevent damage to fauna and flora
Contractors are prohibited, to hunt, kill or capture birds, wild and marine animals. This is to be
undertaken through the preparation of ecological controls for the works, which drive
compliance with international and local standards and policies. In order to confirm that ecology
is not being adversely affected by construction activities, environmental audits, inspections and
monitoring shall be undertaken if sensitive Protected or endangered species are identified on site,
the relevant part of the work will be suspended and Employer or its Representative shall be
informed.
Contractor shall comply to ROSHN Procedure RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00037 Waste
Management Standard to reduce the attraction of rodents, pests and flies

Environmental Monitoring Standard

collection of environmental media (air, water, soil) for analysis of the quality of the environment, or may
include real-time monitoring using devices that detect exposures to hazardous agents

54. Air Quality Monitoring


Contractor shall provide equipment for monitoring air quality to ensure compliance to Kingdom of
Saudi Arabia legislation, city ordinances and the project environmental permit.
Where a requirement is identified for air quality monitoring, a permanent automatic monitoring
station sampling the contaminants shall be installed. Regular samples shall be taken with a
minimum of 14%-time coverage during the entire construction period

55. Noise Monitoring


Contractor shall provide equipment for monitoring noise to ensure compliance to Kingdom of Saudi Arabia
legislation, city ordinances and the project environmental permit

56. Water Quality Monitoring

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 4 OF 118
Water quality monitoring for pollutants and suspended solids shall be undertaken for those
working in, on, or near surface water to ensure compliance to Kingdom of Saudi Arabia
legislation, city ordinances and the project environmental permit. Water sampling shall be
carried out daily at each discharge point.

The Contractor shall take immediate remedial action if the threshold levels as given in Kingdom
of Saudi Arabia environmental legislation, codes and standards are exceeded. All such incidents
and the remedial action taken shall be documented.

57. Noise & Vibration Protection

Includes vibration of any frequency, whether transmitted through air or any other physical medium

Construction, building and demolition related noise can impact the health and wellbeing of
people and animals (considered to be sensitive receivers) when not managed appropriately.
Vibration may also interfere with DAR scientific equipment or damage buildings and
underground services. Both noise and vibration are considered as a nuisance by general public
and protests about noise and vibration are some of the most common complaints that
environmental protection agencies and municipalities receive. Environmental noise and
vibration are now recognized as a public health issue with possible serious or long-term health
impacts.

Contractor can identify and adopt actions to minimize noise and vibration risks through:
 Planning;
 Site layout;
 Management, selection and maintenance of equipment;
 Noise reduction;
 Conduct of workers onsite.

Contractor shall conduct a noise and vibration impact assessment to predict the characteristics
of noise and vibration generated by the planned works which should identify people and
sensitive environments that could be affected by the Works.
The results of the impact assessment should be used by the Contractor to:

▪ Avoid the generation of noise and vibration;


▪ Assist in choosing alternative equipment or methods that generate
less noise or vibration;
▪ Reduce noise and vibration by using the most appropriate equipment
and work practices for the activities;
▪ Attenuate noise by obstructing the path between noise source and receiver;

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 5 OF 118
▪ Maintain equipment and vehicles according to manufacturer’s instructions;
▪ Consider alternatives if noise and vibration cannot be reduced
through avoidance, reduction or attenuation
▪ Organize deliveries and access, with consideration given to combining loads to reduce noise and congestion
in surrounding streets;
▪ Consulting and informing potentially noise-affected residences
regarding designated access routes to Site;
▪ Facilitate construction during normal working hours, where possible;
▪ Develop a process for managing complaints from the general public.
Noise and vibration impact assessments can also be useful when providing information to the
community and people who could be affected by noise
Contractor shall deliver appropriate information and training for employees, such that work
equipment may be used correctly and safely in order to minimize employee exposure to noise &
vibration
Access roads to the Site shall be positioned such that vehicular movements cause minimum
disturbance to residential areas as far as reasonably practicable, and that the access is designed
so that the need for the vehicles to reverse is minimized.
Contractor shall adequately plan operations of vehicles & construction plant to include
efficiency of trip times and reduction of double handling of materials. Vehicle speeds shall be
regulated on all un-surfaced roads to 30kph.
Drop height of excavated materials onto the ground or into vehicles shall be controlled to a
minimum limit.
Contractors will provide personal protective equipment (PPE) designed to reduce the
transmission of vibrations to the employees (e.g. anti-vibration gloves, anti-vibration mats, etc.)
where after implementation of engineering and administrative controls the risk still remains
58. Protection of Soil & Groundwater Standard

Groundwater: a body of water located beneath the ground surface in soil pore spaces and in the
fractures of geologic formations.
Fresh Surface Water: all fresh waters on the ground and includes water within rivers, streams,
lakes, ponds, wetlands, marshes, wadis and man-made reservoirs.

Plant and vehicle maintenance areas will be located in designated impermeable areas with a
fall to a central gully. Water and oil will be collected and separated in an adjacent oil trap. The
location of these designated areas and oil traps will be presented in the Site layout drawing.

All stationary construction plant & equipment are to have either a secondary containment
system (e.g. bunds around semi-permanent generators), or metal drip trays placed beneath
them during

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 6 OF 118
operation. The drip trays will be regularly emptied to prevent overflow and the hazardous
wastes will be dealt with in accordance with RRE-HC-HC1- A00-NSP-RRE-HSE-PRO-00037 Waste
Management Standard.
Drip trays are to be of sufficient size to contain any breach of primary containment and large
enough to extend beyond the outline of the equipment. When used for storage of oil drums, the
drip tray shall have a capacity of 25% of the drum(s) aggregate total storage capacity.
Mobile equipment and vehicles will be removed from site for major maintenance and servicing
which will take place off site. On the construction Site, refueling, oil changing and light
maintenance will be undertaken using drip trays. This will prevent any release of materials from
accidental spills into the underlying soil and groundwater.
Metal impervious drip trays must be used at the time of fuel delivery to catch any oil that
could be lost during the coupling and decoupling of delivery hose(s).

If equipment’s have extensive dripping, the equipment shall be sent for immediate repair and
maintenance.
All vehicle servicing records and vehicle certificates will be held on site and made available to
Employer or its Representative on request.

The fuel, oil and chemical stores shall have secondary containment, and be stored on
impermeable bases within a bund to contain at least 110 % of the maximum capacity of the
storage facility (or 25% of total storage capacity where more than one container is stored), in
accordance to Kingdom of Saudi Arabian environmental legislation, codes and standards. Bunds
shall be emptied immediately after all rain events. All tank discharge pipes, valves and trigger
guns will be contained securely within the bund. The contents of any tank will be clearly
marked on the tank, and a notice displayed requiring that the valves and trigger guns be locked
when not in use.

Incompatible materials shall be separated (e.g. flammables and oxidizers) and shall be kept in
different containment areas. Used and waste fuel, oil and chemicals shall be clearly identified
and segregated within the containment area.
Adequate spill response kits, medical and fire fighting equipment shall be situated
throughout the area.
Designated areas will be established for vehicle and wheel washing. The wheel wash facility
will have an impermeable surface. Vehicle-washing effluent on the construction sites will be
routed to a suitable storage facility such that the effluent can be sent for treatment or
evaporation if necessary. Highways and roads around the construction sites will be monitored
and roads to be regularly cleared to prevent to build up of excess materials.
Contractor shall undertake regular inspections of all sewage, wastewater tanks, refueling,
vehicle/equipment servicing, engineering workshops and chemical storage areas to ensure that
serviceability and containment is adequate.

All staff handling hazardous materials shall be trained in spill response, containment, material
handling and storage procedures. Personnel designated for the emergency response team
shall be trained in the response procedures in the event of a spill, including the use of the spill
clean- up kit, and removal of the hazardous waste.
Plastic sheeting shall be placed beneath mobile and static concrete mixers and concrete pump
trucks before start-up and during transfer of concrete to delivery location or other
receptacles.

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 7 OF 118
59. Waste Management Standard

Waste: material, substance or by-product eliminated or discarded as no longer useful or required after
the completion of a process

All waste should be handle as per ROSHN procedure RRE-HC-HC1-A00-NSP-RRE-HSE-PRO-00037 Waste


Management.

Contractors shall introduce practices that minimize waste generation at source, by reducing
waste and introducing segregation of waste following the principles of waste management
hierarchy:
 Reduce;
 Reuse;
 Recycle;
 Recover;
 Treatment;
 Disposal.

During the Works, Contractor is to segregate waste into the following categories:

 Municipal Waste;
 Hazardous Waste;
 Medical Waste;
 Electrical and Electronic E-Waste.

Waste containers shall not be allowed to overflow, and regular collection shall be maintained.
Containers shall be regularly inspected to ensure containers are kept closed during
accumulation, and shall be tightly sealed prior to transportation off-site. There shall be a
sufficient number and size of waste containers proportionate to the Works to contain amount of
waste generated.
All food waste shall be properly stored in containers with close-sealing lids to minimize pest
infestation and odor control.
Containers used for lightweight materials such as cardboard shall have tarpaulins or netting in
order to stop the waste being blown around site during inclement weather.
Waste oils, lubricants, paints etc. shall be stored in tightly closed, leak-proof containers
compatible to the hazardous waste to be stored. Containers will be clearly labelled to accurately
describe their contents and appropriate warning labels to be attached. Wherever possible,
chemicals shall be kept in their original containers.
Hazardous waste will not be placed in containers provided for non-hazardous waste.
Such errors may lead to hazardous waste being handled as non-hazardous, putting the handlers
at risk, or may lead to the waste being improperly disposed.
The area used for reuse and recyclable green waste should ideally be on an impervious concrete
base.
Any drums or containers that held a hazardous substance will be considered hazardous
regardless of the quantity of substance remaining in the drum or container. Any container or
cylinder awaiting disposal or being discarded that contains a hazardous compressed gas with a

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 8 OF 118
pressure

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 9 OF 118
greater than atmospheric pressure, will be classified as hazardous waste. The contractor should
store used oils in secure bulk containers which are double skinned or have bunds of 110%
capacity.
All areas used for storage of waste shall be a minimum of 30m away from a water source.
Under no circumstances is Contractor to allow any employees, Sub-contractors or Suppliers to
illegally dispose of waste at an unauthorized location (i.e. the side of the road).
No waste shall be burnt on site.
Contractor shall, on the completion of Works, clear away and remove from site all surplus
materials and waste through the approved method and to the correct establishment, and leave
the whole of the site in a clean condition to the satisfaction of Employer or Dar Engineering.

All waste will be collected and segregate and disposal as per ROSHN standard RRE-HC-HC1-A00-NSP-
RRE- HSE-PRO-00037 Waste Management.

Additionally, as per Saudi arabia environmental management law,

Saudi Arabia has published a new Waste Management Law on September 15th 2021. This law aims to
regulate the transport, segregation, storage, import, export, safe disposal of waste and all other
activities related to it. This law replaces Municipal Solid Waste Management Law enacted by the Royal
Decree no. M/48 of 2013. All concerned parties must recycle, retrieve resources, and ensure safe
disposal in order to achieve better environmental and economical results.
According to article 11 of this law waste producers must conserve natural resources and materials,
reuse products, reduce waste, store it in the designated areas, and separate it for the purpose of reuse or
recycle. Article 14 holds the manufacturers/importers an extended responsibility for their products to
ensure financial sustainability in the waste management sector and therefore enforce the concept of
circular economy. The rules and procedures concerned will be determined in the executive regulation
for this law. Article 16 to 18 prescribe the different responsibilities of waste related service providers.
For example, disposal service providers must adhere to the disposal methods set by the national waste
management center (NWMC). As for hazardous waste transporters, they must use means of transportation
that conform with NWMC standards, place warning labels and ensure the existence of documentation
about the transported hazardous waste.
This law also regulates the import and export of waste as well as dealing with emergency situations. Article
19 prohibits the import of hazardous waste without a permit. It also prohibits the import of recycled waste
in addition to recycled used products, devices and equipment.
This law will take affect November 14th
2021. Ref:
https://www.my.gov.sa/wps/portal/snp/aboutksa/environmentalProtection/!ut/p/z0/04_Sj9CPykssy0xPL
MnMz0vMAfIjo8zivQIsTAwdDQz9LSw8XQ0CnT0s3JxDfA0M_A30g1Pz9AuyHRUBPXGyKQ!1

60. Attachments

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 10 OF 118
Attachment HOT WORK PERMIT

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 10 11 OF 118
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01 PAGE 110 OF 118
Attachment COLD WORK PERMIT

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 11 1 OF 118
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE 11 2 OF 118
Attachment LIFTING OPERATION WORK PERMIT

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 11 3 OF 118
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE 11 4 OF 118
Attachment EXCAVATION WORK PERMIT

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 11 5 OF 118
DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01
PAGE 11 6 OF 118
Attachment WORK AT HEIGHT PERMIT

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 11 7 OF 118
************************************END OF DOCUMENT********************************

DOCUMENT CODE: DAR-HSE-PLN-01 REVISION CODE: 01


PAGE 11 8 OF 118