BILL Of QUANTITY

Pekerjaan : GANTI ATAP EMPTY BUNCH PRESS


Budget Tahun : 2023
No AFCE/AFRM :
Luas :
Lokasi : BPK POM

Harga
No Qty Unit Sub Total (Mat+Upah) Keterangan
Material Sub Total Material Upah Sub Total Upah

1 PEKERJAAN PERSIAPAN 500.000,00 13.930.000,00 14.430.000,00


1 - Mobilisasi Pekerja dan Alat kerja 1,00 Ls 5.000.000,00 5.000.000,00 5.000.000,00
2 - Pekerjaan Pembongkaran atap 174 M2 50.000,00 8.680.000,00 8.680.000,00 Include pembongkaran CNP lama
3 - Safety & BPJS
- Safety Equipment 1,00 Ls 500.000,00 500.000,00 500.000,00
- Safety Shoes
- Angkur Point
- Body Hardness with absorber
- Helm Project
- Rompi Project
- Police Line
- Medical Kit ex Box
- BPJS 1,00 Ls 250.000,00 250.000,00 250.000,00

2 Pekerjaan Penutup & Atap 59.952.480,00 16.594.200,00 76.546.680,00


1 Pemasangan atap 174 M2 210.000,00 36.456.000,00 40.000,00 6.944.000,00 43.400.000,00 BLUESCOPE SPANDEK II, 0,4 MM BMT WARNA BIRU
2 Pekerjaan pemasangan Lipped Chanel 150.50.20.3 834 Kg 24.000,00 20.025.600,00 10.000,00 8.344.000,00 28.369.600,00 Include pengiriman,zincromate, cat finish warna pelita green
3 Pekerjaan pemasangan Tie rod besi dia 12 75 Kg 24.000,00 1.790.880,00 10.000,00 746.200,00 2.537.080,00

4 Pekerjaan Pemasangan NOK 14 M 120.000,00 1.680.000,00 40.000,00 560.000,00 2.240.000,00 BLUESCOPE O,4 BMT, WARNA BIRU

Total Material 60.452.480,00 Upah 30.524.200,00 90.976.680,00

RESUME
Material 60.452.480,00
Upah 30.524.200,00
Total 90.976.680,00
Pembulatan 90.976.000,00