Professional Documents
Culture Documents
24 October 2012
Gentlemen:
We have your above referenced transmittal submitting copies of plans as listed therein on the above subject.
We have reviewed the BNWAS system in accordance with IMO Resolution MSC. 128(75) and its relevant
regulations, and with regard thereto advise that the arrangements and details as indicated appear to be
satisfactory, in association with the attached comment.
Please note that the final acceptance for the Bridge Navigational Watch Alarm System with the above
standard regulations is subject to the verification of the equipment on board the vessel by the attending
Surveyor.
Electronic copy of the plans stamped to indicate our review is being returned.
An invoice to cover the cost of the subject review is being forwarded to you separately.
Should you need any clarifications, please do not hesitate to contact Mr. Maheshnaidu at (65) 63717898 or
email MAppalanaidu@eagle.org or Mr. HM Kim at (65) 6371-2661. In case of inquiry by a phone or reply by
a document, please inform or refer to Task No. & the date of this letter.
Hyoung-Min Kim
Senior Principal Engineer
Ship/Offshore Engineering Systems
cc: ABS SG ESD File w/p (12 IRF2398)
cc: ABS Surveyor w/p (Via O2E)
PACIFIC DIVISION
438B ALEXANDRA ROAD, #06-05, BLK B ALEXANDRA TECHNOPARK, SINGAPORE 1 1 9968
TEL: 65-6276-8700 FAX: 65-6272 21 95 (SED) 65-6276 81 30 (ESD) EMAIL: ABSSingapore@eagle.org
WEB: www.eagle.org
CO. UEN: S58FC1 284D
Pg 1 of 2
Electronically published by ABS Singapore.
Reference 958969, dated 24-OCT-2012.
Drawings List
Comment List
PACIFIC DIVISION
438B ALEXANDRA ROAD, #06-05, BLK B ALEXANDRA TECHNOPARK, SINGAPORE 1 1 9968
TEL: 65-6276-8700 FAX: 65-6272 21 95 (SED) 65-6276 81 30 (ESD) EMAIL: ABSSingapore@eagle.org
WEB: www.eagle.org
CO. UEN: S58FC1 284D
Pg 2 of 2