QUALITY CONTROL PLANS Page 1 of 11
Contents
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 2 of 11
PM - Project Manager FULL WITNESS - Verification of compliance with 1.1.0 - Contract Review
specifications by witnessing activities and
QM - Quality Manager providing an inspection record. The activity 1.2.0 - Doc. Planning & Control
cannot proceed without witnessing.
PE - Project Engineer 1.3.0 - Design Control
REVIEW - Verification of compliance with
DOE - Director of Engineering 1.4.0 - Procurement Activities
specifications by review of documentary
evidence of related Q.C. activities.
LDE - Lead Discipline Engineer 1.5.0 - Close Out Activities
DS - Discipline Supervisor
APPROVAL - Formal approval required before
proceeding
DE - Discipline Engineer
DC - Document Controller
SPOT REVIEW - Random inspection or review of activities to
C - Client verify compliance with specifications.
F - Full Witness
R - Review
S - Spot Review
A - Approval
See Register of Technical Documents ref. 24630-020-G08-GAK-00001 for details of Company documents referred in this document.
See Attachments 9.1 of Project Quality Plan, BTC003-B001-GE-REG-00001 and BTC003-B020-GE-REG-00001for details of Contractor documents referred in this document.
S p i e C a p a g s .a .
ATTACHMENT 9.5 TO BTC003-B020-QA-PLN-00001
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 3 of 11
1.1.0 Contract Define Scope of Work, 24630-000-ROR-0000- Full and clear definition Disc. Contract DE DS/DOE PM
Review Codes & Standards, 00001 of all Contractual Review Report
and Input Data M-1.3 / E-4.2.7 requirements
[Design Inputs]
Define Design Basis 24630-000-ROR-0000- Design Basis Spec. Disc. Project DE DS/DOE PE A
00001 includes all required input Design Basis
M-1.3 / E-4.2.7 data Specification
1.2.0 Document Prepare Technical 410088-00-L-PM-PR- All required documents Technical Doc. DE DS PE A
Planning Document Register 015 identified, listed and Register:
Control E-4.2.7 scheduled BTC003-000-
GE-REG-00001
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 4 of 11
1.3.0 Design Control Document AGT004-0000-IM-PRO- All documents Check Prints DE LDE/ DE PE/PM A
Preparation, 00001, checked and approved Approval (Not
Checking, 410088-00-L-PM-PR-015, prior to issue Signatures Orig.)
Verification and 410088-00-L-PM-RP-017,
Approval AP-CDZZZZ-PM-SPE-
0002, WP-6.2 / E-4.2.7
1.4.0 Procurement Prepare Inquiry 410088-00-L-PM-PR-015 All Inquiry Requisitions Inquiry DE DS/PE PM S
Activities Requisitions 410088-00-L-PT-PS-011 / prepared and Requisitions
027 approved
410088-00-L-PM-PR-012
410088-00-L-PT-PR-009
24630-000-GPP-GEX-
00011
S p i e C a p a g s .a .
ATTACHMENT 9.5 TO BTC003-B020-QA-PLN-00001
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 5 of 11
1.5.0 Close-out Plant Performance E-4.2.7 Plant meet Contract Validation DE DS/PE PM A
Activities Validation 24630-000-ROR-0000- Performance Reports
00001 requirements
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 6 of 11
TPI - Third Party Inspection SPOT REVIEW - Random inspection or review of activities to
verify compliance with specifications.
PB - Project Buyer
DE - Discipline Engineer
SC - Shipping Co-ordinator
See Register of Technical Documents ref. 24630-020-G08-GAK-
F - Full witness 00001 for details of Company documents referred in this
document.
R - Review
See Attachments 9.1 of Project Quality Plan, BTC003-B001-GE-
S - Spot Review REG-00001 and BTC003-B020-GE-REG-00001for details of
Contractor documents referred in this document.
A - Approval
S p i e C a p a g s .a .
ATTACHMENT 9.5 TO BTC003-B020-QA-PLN-00001
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 7 of 11
2.1.0 Supply Sources Approval of P-5.8 Approved vendor Project Approved PPM PM A
Supply Sources 410088-00-L-PT-PS- list Vendor List
027 Client Notification of
Acceptance
2.2.0 Inquiry Issue Inquiries for Procedure Procedure Inquiry Package PB EM/PM S
Equipment and WP-5.1 WP-5.1
Bulk Material
2.4.0 Purchase Orders Issue Purchase Procedure Procedure Purchase Order PB PPM/PM A Un priced
Order WP-5.2 & WP-5.3 WP-5.2 Procedure Package
410088-00-L-PM-PR- WP-5.3
015
2.5.0 Inspection Review/Approve Procedures: P-5.9 & Approved Inspection report, DE/QE QM/PM F FAT only
Surveillance witness tests/ P-5.9 and Approved ITP/Petrofac inspection release note
examinations at vendor ITP or Petrofac Inspection Scope.
vendors premises Inspection Scope.
2.6.0 Expediting Expedite purchase Procedure, Procedure Tracking Report PEX PPM/PM S
orders WP-5.4 WP-5.4
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 8 of 11
PM - Project Manager FULL WITNESS - Verification of compliance with 3.1.0 - Document Review
specifications by witnessing activities and
LCE - Lead Construction Engineer providing an inspection record. The activity 3.2.0 - Project Correspondence
cannot proceed without witnessing.
DS - Discipline Supervisor 3.3.0 - Document and Data Control
ME - Material Control Engineer APPROVAL - Formal approval required before proceeding 3.7.0 - Control of Non Conforming Product
WS - Warehouse Supervisor
SPOT REVIEW - Random inspection or review of activities to 3.9.0 - Quality Records
DC - Document Controller (Construction Site) verify compliance with specifications.
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 9 of 11
ITEM PROCESS QUALITY ACTIVITY SPECIFICATION/ ACCEPTANCE QUALITY RECORD RESPONSIBILITY HOLD POINTS
NO. DESCRIPTION PROCEDURE REF. CRITERIA
C COMMENTS
3.1.0 Document Review Review/approve construction Contract Documents, Contract Documents, Sub-Contractor QM R
sub-contractors project quality 410088-00-L-QA-PR- Compliance with Quality Plan
plan and quality system 002, project requirements
covering contract requirements 410088-00-L-PM-PR-
and ISO9001 015, ISO 9001
3.2.0 Project Retain all project Procedure WP-6.7, Procedure WP-6.7 Project Files PM S
Correspondence correspondence in applicable 410088-00-L-PM-PR- 410088-00-L-PR-PR-
job files 015 015
3.4.0 Material Receipt inspection of Applicable purchase Applicable purchase Receipt inspection MC S
Receipt Inspection materials/equipment procured order, order Requirements report.
by Petrofac. / Customer 410088-00-L-PM-PR-
supplied product 015
S p i e C a p a g s .a .
ATTACHMENT 9.5 TO BTC003-B020-QA-PLN-00001
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 10 of 11
3.5.0 In process Highlight Petrofac Contract Documents, Contract Documents, Applicable inspection SQC S/F S or F depends on
inspections Inspections on sub Specifications, Specifications, and test plan the project
contractors ITPs (civil, drawings, approved drawings, approved specifications and
mechanical, instruments, ITP’s ITP’s GOC.
electrical)
Perform inspections and Approved ITPs, Contract documents, Applicable Inspection DQI S/F
document: Petrofac Procedure specifications, drawings, report/record
• Surveillance QA–12.11 Approved ITPs.
• Witness
• Hold point
Verify construction sub- Sub contractors Contract Documents, Applicable inspection SQC S
contractors control of: approved Specifications, drawings, report /record
• Special processes. procedures/method Approved ITPs.
• Inspection, statements
• Measuring and test
equipment
Inspection and test status Sub-contractors Contract Documents, Applicable drawing, DQI S
approved procedures & report or record
method statements
P
I
ETRO FAC
L
N T E R N A T IO N A L TD.
QUALITY CONTROL PLANS Page 11 of 11
3.6.0 Final Inspection Carryout final Sub contractors Contract documents/ Applicable inspection DQI A
inspections, Punch list approved inspection and specifications report or record
incomplete work. test plan Punch lists
3.7.0 Control of non- Identify / document non- Procedure BTC003- Procedure BTC003- Non conformance report, SQC A
conforming conforming product, B001-QA-PRO-00007 B001-QA-PRO-00007 CAR/PAR
product agree corrective action
and implement
corrective action.
3.8.0 Acceptance and Carry out pre- Commissioning Plan, Specifications, Pre-commissioning and Comm. Engineer, A
Completion commissioning and 410088-00-L-CG-PH- drawings, Commissioning
Commissioning activities. 001. Commissioning Plan Records/Reports
A
Complete punch list Punch Lists Specifications, Signed off Punch Lists DS
items drawings
3.9.0 Quality Records Review/approve Sub- Contract Documents, Contract Documents, System test pack DQI A
Contractors system test 410088-00-L-PM-PR- Specifications,
packs (Piping, civil, 015 drawings
mechanical, electrical, AP-CDZZZZ-IM-GLN-
instruments) 0002
Compile final Contract documents, Contract documents Supplier Data Book, SQC A
acceptance dossiers / 410088-00-L-PM-PR- Specifications, drawing Deign and Installation
Data Books 015, UKCS-TI-019, Data Book, Radiographs,
AP-CDZZZZ-IM-SOR- Certificate of Compliance,
0001 Op. and Maintenance
Data Book