SITE
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 2 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
TABLE OF CONTENTS
1. SCOPE............................................................................................................................ 3
2. DEFINITIONS AND ABBREVIATIONS .......................................................................... 3
3. REFERENCE DOCUMENTS .......................................................................................... 3
4. PREPARATION AND CHANGE CONTROL OF THE PROCEDURE ............................ 3
5. GENERAL INSTRUCTION ............................................................................................. 4
6. DOCUMENT ................................................................................................................... 4
7. INSPECTION PROCEDURE .......................................................................................... 6
APPENDICES
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 3 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
1. SCOPE
This procedure covers for applying the Procedure, test Plan, Inspection and Method to be
prepared by CONTRACTOR and Subcontractor at Chile Solar PMGD Project site.
The terms used throughout this procedure shall have the following meaning except where
the context requires otherwise.
2.1. Definition
2.2. Abbreviations
3. REFERENCE DOCUMENTS
This procedure is issued and revised at care of Project Quality Manager of CONTRACTOR,
under approval of Site Manager.
It is subject to COMPANY review.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 4 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
5. GENERAL INSTRUCTION
5.2. Construction Procedure, Inspection and Test Plan and Method Statement will be written for
activities related to Specification, Contract Document, Code and Standard.
5.3. The document number of Procedure, Method Statement and ITP shall be as per Project
Document Identification Code (Q2-WI-001 is00).
5.5. The Construction Procedure, Method Statement and ITP shall be prepared by Subcontractor,
reviewed by each Construction specialist and Project Quality Manager (or a delegate), and
approved by Site Manager.
5.6. The form of Inspection and Test Plan, Request for Inspection and Inspection Report shall be
prepared as per Appendix III, IV, V
5.7. The revision of each procedure, method statement and ITP shall be revised by initiator.
6. DOCUMENT
6.1.1. Subcontractor shall forecast necessary Construction Procedure and Method Statement with
construction schedule and prepare procedure issue plan. Each discipline Specialist shall
expedite the plan and cooperate with subcontractor.
6.1.2. The Construction Procedure and Method Statement shall be prepared for specific
construction and got approval from COMPANY before start construction activity
6.1.3. Each Construction Supervisor and Project Quality Manager (or a delegate) shall review the
submitted procedure. If there is no comment, submit to COMPANY for approval
6.1.4. After receiving the approved Construction Procedure and Method Statement from
COMPANY, this shall be distributed to relevant organization and Subcontractor to implement
at site.
6.1.5. CONTRACTOR and Subcontractor supervisor shall fully understand and awareness.
Supervisor shall monitor that the construction follows each Method Statement.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 5 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
6.2.1. The ITP referred to each discipline (Civil – Mechanical – Electrical) shall be conformed to
relevant Method Statement. The ITP shall specify all of Inspection and Test items to verify
that equipment, component, system, parts, or systems are being located, installed,
assembled, connected, and adjusted in compliance with the latest construction drawings,
instructions, procedures, and other applicable documents.
6.2.2. The relevant ITP report forms shall be attached to relevant ITP and submitted to
CONTRACTOR.
6.2.3. Project Quality Manager (or a delegate) shall review the submitted ITP with attached
inspection and test report forms. If there are no comments, assign the inspection points and
submit ITP to COMPANY for approval. The inspection point shall be defined as followings.
6.2.4. After receiving the approved ITP from COMPANY, this shall be distributed to relevant
organization and Subcontractor to implement at site.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 6 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
7. INSPECTION PROCEDURE
7.1.1. Subcontractor shall issue the NFI when the work is ready for inspection after completion of
their own inspection satisfactorily.
7.1.2. When CONTRACTOR receives the NFI from subcontractor, Project Quality Manager (or a
delegate) or his designee shall handover the NFI to assigned CONTRACTOR’s inspector.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 7 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
7.1.3. When completion of pre-check, NFI shall be issued to COMPANY at least 24 hours in
advance of working day of ‘H’ or ‘W’ points identified in the ITP for COMPANY
7.1.4. In case that the required inspection date will be delayed or postponed, revised NFI shall be
issued with new NFI number.
7.2.1. When possible, for pre-check, the CONTRACTOR’s inspector shall perform the pre-check of
NFI with Subcontractor’s inspector and report to the Project Quality Manager (or a delegate)
after performing. In case of not possible for pre-check such as concrete pouring inspection,
etc., NFI can be issued to COMPANY without pre-check. If the pre-check results are
satisfied, the NFI shall be issued to COMPANY.
7.2.2. If the result of inspection and test are satisfied, inspectors who witness the inspection and
test shall sign on the relevant inspection report after performing the inspection or test.
COMPANY inspector shall sign, on the relevant inspection report which is designated as
‘HOLD’, ‘WITNESS’ inspection item.
7.2.3. If there are unacceptable results during inspection or test, this item shall be issued to the
Non-Conformance Report and controlled with Non-Conformance Control Procedure. If the
unacceptable condition is minor, simple or readjusting easily, this will not lead to issue NCR
but to reissue the NFI after correction.
7.2.4. When COMPANY inspector cannot attend the ‘WITNESS’ point of inspection and test with
waive, CONTRACTOR inspector shall be responsible for the result. CONTRACTOR
inspector shall inform detail consequence to COMPANY inspector and Subcontractor /
CONTRACTOR shall process next activity.
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 8 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 9 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
YES
YES
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 10 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 11 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
TCM Identificatio n Co de
NOTICE FOR INSPECTION C006
P M GD P ROJECTS (CHILE)
SUBCONTRACTOR
DISCIPLINE
FROM SIGNATURE
TO CC
ITEMS TO BE INSPECTED
FORMS ATTACHED
REFERENCE DRAWINGS
NOTES:
N/A
ACKNOWLEDGEMENT OF RECEIPT
(fo r NFI by e-mail, co py o f mail receipt is sufficient and shall be attached during inspectio n)
Name
Signature
Date (dd-mmm-yy)
ASSESSMENT
Name
Signature
Date (dd-mmm-yy)
This document is Tecnimont Chile property, and cannot be used by others for any purpose, without prior written consent
TCM Identification Code
SITE QUALITY CONTROL
C000-QZ-PQ-000001
PLAN
PMGD PROJECT CHILE QUALITY Sheet 12 / 12 Issue 0A
Client Identification Code
SOLAR PMGD PROJECTS (CHILE)
Report N..: -
UNIDAD : SISTEMA :
SUBSISTEMA : AREA :
TAG Nº : RFI Nº :
Contractor Drawing : Client Drawing :
SUBCONTRATO
CONTRACTOR
CLIENTE
(Free)