Project Name : Talimarjan Thermal Power Plant Extension Project

Date/Revision 26.June.2014 Page 1

MECHANICAL Risk Assessment


Work Activity Rev. No. 0
WORKS

Risk Assessment
Work Activity Break Down Risk Facts Risk Occurrence Occurrence Assess. Registry
Frequency Severity Grade
Equipment falling on the excavation due to unsafe operation fall 1 3 D
Personnel hit / struck by equipment due to poor communication / non availability of signal man or
hit / struck by 2 2 C ***
banks man
Excavation and backfilling works for
Personnel falling from the edge of excavation while moving / working near the edge of excavation falling 1 2 E
equipment foundation
Personnel falling on the trench due to unsafe access / unsafe ladder fall 1 2 E
Equipment collide with another equipment due to non availability of signal man or banks man to
collision 2 2 C ***
control operation

Personnel hit by equipment / materials during transportation due to poor loading and unloading
hit by 1 3 D
practices
Collapsed of equipment / materials while transporting due to improper lashing and strapping collapse 1 2 E
Collapsed of crane / forklift while lifting due to unsafe location and crane positioning collapse 2 1 E
Transportation of equipment
Personnel hit by equipment during transportation due to heavy and huge load hit by 1 3 D
Workers caught in between load and transport equipment due to poor communication between
caught in between 1 3 D
operator, rigger and workers
Hand and body injury due to non compliance to PPE requirements hand and body injury 1 2 E
Personnel hit by scaffolding materials during lifting / erection of scaffold hit by 2 1 E
Tripping hazards to personnel due to non arrangement of scaffolding materials tripping 3 1 D
Erection / dismantling of scaffolding on Scaffolding / working platform collapsed because scaffolds are used as support for equipment /
collapse 2 2 C ***
equipment heavy load and by accidental hit by vehicle / equipment due to lack of barricade
Personnel falling from heights due to non compliance to wearing of proper PPE fall 2 2 C ***
Personnel falling from heights due to unsafe / incomplete scaffolding platform fall 2 2 C ***
Personnel caught in between equipment / materials due to poor communication between rigger
caught in between 1 3 D
and crane operator

Equipment / materials falling from height to personnel due to poor installation of supports /
falling 2 2 C ***
temporary connection
Construction / installation of equipment Workers hit / struck by equipment during erection due to unsafe lifting practices and due to
hit / struck by 1 2 E
collapsed of lifting tools and tackles

Lifting equipment collapsed / overturned due to loose and un even ground and due to exceeding
overturned 1 3 D
of safe working load.
Poor housekeeping / cables and materials arrangement causing tripping hazards to personnel tripping 3 1 D

Grade(Dangerous degree):A(9),B(6),C(4),D(3),E(2),F(1)
Project Name : Talimarjan Thermal Power Plant Extension Project

Date 26.June.2014 Page 1


Risk Assessment Registry
Work Activity MECHANICAL WORKS Rev. No. 0

Risk Assessment
Assessment
Work Activity Break Down Risk Facts Control Measures
Grade Occurrence Occurrence Assessment
Frequency Severity Grade

E
Provide qualified, certified and trained signal man or banks man with
Personnel hit / struck by equipment due to poor communication / non identification vest or jacket
C 1 1 F

PL
Excavation and backfilling availability of signal man
works for equipment Provide proper barrication and install sign boards
foundation
Equipment collide with another equipment due to non availability of Provide qualified, certified and trained signal man or banks man with
C
signal man or banks man to control operation identification vest
1 1 F

M
Provide / install proper and safe support for equipment
Scaffolding / working platform collapsed because scaffolds are used
C as support for equipment / heavy load and by accidental hit by Provide hard barricade and install sign boards 1 1 F
vehicle / equipment due to lack of barricade Do not allowed personnel to use scaffold as supports for equipment or heavy

Erection / dismantling of
scaffolding on equipment
C
proper PPE
SA
Personnel falling from height due to non compliance to wearing of
load
Provide / issue proper PPE to all personnel working and wear properly when
working at high elevation

Provide / install safe scaffolding / safe working platform


1 1 F

Scaffolding shall be erected by competent and certified scaffolder of proper


scaffolding materials and should be complete with requirements
Personnel falling from height due unsafe / incomplete scaffolding
C
platform
1 1 F
Scaffolding shall be inspected, tagged and approved before allowing any
personnel to work on the scaffold

Provide proper and safe supports to equipment and materials


Construction / installation of Equipment / materials falling from height to personnel due to poor
equipment
C
installation of supports / temporary connection
Avoid installation of temporary stand or supports 1 1 F
Provide barricade and install warning sign boards
Project Name : Talimarjan Thermal Power Plant Extension Project

Date 26.June.2014 Page 1


Risk Assessment Registry
Work Activity MECHANICAL WORKS Rev. No. 0

Risk Assessment
Assessment
Work Activity Break Down Risk Facts Control Measures
Grade Occurrence Occurrence Assessment
Frequency Severity Grade