Professional Documents
Culture Documents
Notification of : Two Scaffold clips from the same batch have failed.
Potential # : B1
Business Unit : E.O.S.
Peer Group 5
Delivery Unit : East of Shetland
Site : Magnus 211/12
Date of Event : 08-10-2000
Time of Event :
A/I Report No. : Mag 00-132
Exact Location : Magnus 211/12
Brief Description : During construction of a scaffold platform two single scaffold clips from the same new batch
failed while being tightened up. It appears from initial inspection that the materials these are
made from are too soft / malleable. One rivet holding the bolt into the main part of the clip
has sheared and one has been pulled out. Both have deformed the hole in the main body of
the clip.
The clips were manufactured for CAPE Offshore Services in September 2000 and the Batch
number is G-784.
DISTRIBUTION
All SORs should be forwarded to G BPX Safety Flyers e-mail distribution list in addition to locally
agreed Business Unit distribution requirements.
SORs with high potential (i.e. Amoco C6, C9, C12, D4, D8, D12, D16 or BP A1, A2, A3, B3) must
also be forwarded to G BPX Safety Hiflyers e-mail distribution lists in accordance with local Business
Unit procedure.
# Please insert a potential from the matrix e.g. A1 and not a description of the potential e.g. serious.
DS Rev 2 11/02/99
DS Rev 2 11/02/99