DEMOLISHING

SUMMARY
OUTSTANDING SCOPE

BIILL NO ITEM DESCRIPTION TOTALS

SECTION 1 - P&G's

1 1 Fixed Charge Items R -


2 2 Time Related Items R -

Sub Total Section 1 R -

SECTION 2 - CIVIL AND BUILDING WORKS

1 3 Old Kitchen Area R -


2 4 Area Next To Sports Grounds R -
3 5 Old Flat And Surrounding Area R -
4 6 Kwanala Village Asbestos Removal R -
5 7 Kwanala Village Area R -

Sub Total Section 2 R -

8 Sub Total Excluding Vat R -


9 Vat @ 15% R -

TOTAL INCL VAT R -

SUMMARY Page 1 of 21
DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QUANTITY RATE AMOUNT

SCHEDULE OF QUANTITIES

DEMOLISHING OF STRUCTURES AND REINSTATING GROUNDS TO


IT'S ORIGINAL STATE FOR KRIEL COLLIERY - SERITI MINE
EARTHWORKS, CONCRETE AND STEELWORK

VALUE ADDED TAX

The Contractor shall price all items exclusive of VAT and shall add
the VAT payable separately as indicated in the Final Summary

FIXED PRICE

This is a fixed rate remeasurable contract, rates and prices shall


remain fixed for the duration of the Contract

REFERENCE TO CONTRACT

The items in these Bills of Quantities shall be read in conjunction


with all other relevant parts of this Document

CIVIL WORKS

SECTION NO. 1

BILL NO. 1

SANS1200A & PRELIMINARY AND GENERAL (Applicable to the whole of the


PSA Works)

8.3 FIXED CHARGE ITEMS

The sums stated for items under this heading shall cover the cost of
providing, establishing and commissioning on the site the facilities
adequately equipped to enable all the work to commence and to
proceed to completion as required in terms of the contract. The
sums shall also cover (where appropriate) the cost of demolition of
and the removal from the site of all items established and shall
include for making good and restoring the site to the satisfaction of
the Engineer.

8.3.1 Contractual requirements

1 1 Insurance as per Conditions of Contract SUM 1 R -

1 2 Programmes required SUM 1 R -

1 3 Suretyship as per Conditions of Contract SUM 1 R -

1 4 All other Contractual requirements SUM 1 R -

8.3.2.2 Establishment of facilities on Site for the Contractor

1 5 a) Offices and storage sheds SUM 1 R -

1 6 b) Workshops SUM 1 R -

1 7 c) Laboratories SUM 1 R -

1 8 f) Tools and equipment SUM 1 R -

1 9 g) Water supplies, electric power and communications SUM 1 R -

1 10 h) Dealing with water SUM 1 R -

1 11 i) Access SUM 1 R -

Section 1 - P&G's Page 2 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QUANTITY RATE AMOUNT

1 12 j) Plant SUM 1 R -

1 13 Fuel SUM 1 R -

Features requiring special attention

1 14 Health inductions and all requirements SUM 1 R -

1 15 Safety inductions and all requirements SUM 1 R -

1 16 Notice boards SUM 1 R -

1 17 Contractor's documents SUM 1 R -

Protection of the environment & compliance to the EMP & WUL


1 18 SUM 1 R -
conditions

1 19 Surveys and setting out SUM 1 R -

1 20 Existing services and structures SUM 1 R -

1 21 Protective clothing SUM 1 R -

1 22 Other contractors employed by the Employer SUM 1 R -

1 23 Site security SUM 1 R -

1 24 Transportation of material and personnel SUM 1 R -

ASBESTOS MANAGEMENT AND SAFE DISPOSAL OF ASBESTOS AS PER


REGULATION 21

1 25 Asbestos inventory assessment report Sum 1 R -

1 26 Routine asbestos monitoring report No. 1 R -

Plan of work approved by an Approved Inspection Authority and


1 27 Sum 1 R -
notification to the Department of Labour

1 28 Hazardous waste transporter Sum 1 R -

1 29 Asbestos personnel competency Sum 1 R -

Equipment, machinery, material (Scaffolding, etc.) and all


1 30 Sum 1 R -
consumable usage on site

1 31 Final clearance at project completion Sum 1 R -

8.3.3 Other fixed charge obligations

1 32 All other fixed charge obligations SUM 1 R -

8.3.4 Removal of site establishment

1 33 Removal of site establishment and re -instatement on completion SUM 1 R -

Total Carried forward to Total Summary R -

SECTION NO. 1

BILL NO. 2

SANS1200A & PRELIMINARY AND GENERAL (Applicable to the whole of the


PSA Works)

8.4 TIME RELATED ITEMS

Section 1 - P&G's Page 3 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QUANTITY RATE AMOUNT

The sums stated for items under this heading shall cover all the
Contractor's Time Related costs, related to contractual obligation
and shall include, but not be limited to site rentals, repairs to, and
depreciation of, buildings and furniture, the wages of staff, operating
and maintaining these facilities in accordance with the requirements
of the Contract

8.4.1 Contractual requirements

2 1 Insurance as per Conditions of Contract Month R -

2 2 Programmes required Month R -

2 3 Suretyship as per Conditions of Contract Month R -

2 4 All other Contractual requirements Month R -

8.4.2.1 Operation and Maintenance of facilities on site for the Engineer

2 5 a) Furnished offices Month R -

2 6 b) Telephone Month R -

2 7 d) Survey assistants and materials Month R -

8.4.2.2 Operation and maintenance of facilities on site for the Contractor

2 8 a) Offices and storage sheds Month R -

2 9 b) Workshops Month R -

2 10 c) Laboratories Month R -

2 11 f) Tools and equipment Month R -

2 12 g) Water supplies, electric power and communications Month R -

2 13 h) Dealing with water Month R -

2 14 j) Plant Month R -

2 15 Fuel Month R -

Features requiring special attention

2 16 Health and Safety requirements for the duration of the project Month R -

Protection of the environment & compliance to the EMP & WUL


2 17 Month R -
conditions

2 18 Disposal of materials Month R -

2 19 Tests on completion Month R -

2 20 Setting out Month R -

2 21 Examinations and inspections Month R -

2 22 Protective clothing Month R -

2 23 Site security Month R -

2 24 Transportation of material and personnel Month R -

8.4.3 Supervision

2 25 Supervision for the duration of Construction Month R -

Section 1 - P&G's Page 4 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QUANTITY RATE AMOUNT

8.4.4 Company and head office

2 26 Overhead costs for duration of Contract Month R -

8.4.5 Other time related obligations

2 27 All other time related obligations Month R -

Total Carried forward to Total Summary R -

Section 1 - P&G's Page 5 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT

CIVIL & BUILDING WORKS

EARTHWORKS, DEMOLITION & REMEDIAL WORKS

SECTION 2 - BUILDING AND STRUCTURES AT OLD KITCHEN AREA

BILL 1

SANS 1200C SITE CLEARANCE

Clear and grub site and dispose of as directed by the Engineer within
8.2.1
free haul distance of 2km

1 1 Clear site and grub area ha 9.67 R -

Remove topsoil and stockpile as directed by Engineer within free haul


8.2.10
distance

1 2 Remove topsoil layer 150mm deep ha 9.67 R -

Import topsoil 300mm deep from approved borrow pit as directed by


Engineer

1 3 Hauling distance exceeding 500m and not exceeding 1000m m3 10,461.00 R -

1 4 Hauling distance exceeding 1000m and not exceeding 1500m m3 10,461.00 R -

Rip and scarify

Rip, scarify and recompact top 150mm to minimum 90% Modified


1 5 ha 9.67 R -
AASHTO density

SABS 1200C Demolition

8.2.8 Demolish and remove structures/buildings

Demolish all structures and building rubble and cart away, with
distance not exceeding a 16km radius from the mine. Supplier to
confirm beforehand what materials can be dumped at identified
location. All costs included.

Removal of 10m high mast lights including bases and cart away -
1 6 No. 14 R -
Page, 5 figure 5.

Removal of 25m high mast lights including bases and cart away - Page
1 7 No. 4 R -
5, figure 5.

1 8 Removal of Lapa and cart away - Page 5, figure 4. No. 5 R -

1 9 Removal of fire Hydrants and cart away - Page 4, figure 1. No. 4 R -

Removal of fire Hydrants (Underground) and cart away - Page 4,


1 10 m 15.00 R -
figure 1.

Removal of Manhole including backfilling and cart away - Page 20,


1 11 No. 6 R -
figures 54 & 55.

Demolition of concrete paving including Backfilling and cart away -


1 12 m2 3,448.30 R -
Page 4, figures 2 & 3.

Demolition of transformer bay house 3.7 x 3.7m on plan and 3m high


1 13 m2 12.58 R -
at eaves and cart away.

Demolition of concrete bases around transformer bay house


1 14 m2 37.40 R -
including Backfilling and cart away - Page 12, figure 27.

1 15 Removal of transformers and cart away - Page 13, figure 29. Item 2 R -

Section 2 - Old Kitchen Page 6 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


Removal of 3m high Palisade fencing and cart away - Page 8, figures
1 16 m 15.00 R -
14 & 15.

Break up and remove existing tarmac not exceeding 50mm thick and
1 17 m2 7,477.00 R -
cart away - Page 4, figure 2.

1 18 Backfill to trenches - Page 8, figure 13. m3 1,000.00 R -

1 19 Allow for the removal of rubble and cart away. m3 60.00 R -

Allow the removal of concrete walkways and cart away - Page 13,
1 20 m 2,000.00 R -
figure 30.

Removal of drain with green mesh wire and cart away - Page 13,
1 21 Item 1.00 R -
figure 31.

1 22 Removal of steel handrails and cart away - Page 5, figure 4. m 50.00 R -

1 23 Removal of existing carport and cart away - Page 11, figure 23. m2 56.00 R -

Demolish and remove single storey buildings, etc comprising


unreinforced/reinforced concrete surface beds, brick external and
internal walls, corrugated iron roof covering on timber roof
structure etc and cart away with distance not exceeding a 16km
radius from the mine. Supplier to confirm beforehand what
materials can be dumped at identified location. All costs included. -
Page 7-11, figure 21-31

Building Next to the gate (Building 1) brickwork structure 40 x 18m on


1 24 No. 1 R -
plan and 5m high at eaves and cart away - Page 9, figure 18.

ABET A Centre brickwork structure 43 x 11m on plan and 5m high at


1 25 No. 1 R -
eaves and cart away - Page 9, figure 18.

Sinqobile Centre A brickwork structure 43 x 11m on plan and 5m high


1 26 No. 1 R -
at eaves and cart away - Page 17, figure 46.

Foyer area brickwork structure 12 x 7m on plan and 4m high at eaves


1 27 No. 1 R -
and cart away (Building 2).

Workshop brickwork structure 38 x 34m on plan and 5m high at


1 28 No. 1 R -
eaves and cart away - Page 17, figure 44.

ABET B Centre brickwork structure 19 x 7.5m on plan and 5m high at


1 29 No. 1 R -
eaves and cart away - Page 17, figure 46.

Sinqobile Centre B brickwork structure 25 x 4m on plan and 4m high


1 30 No. 1 R -
at eaves and cart away - Page 17, figure 42.

ABET C Centre brickwork structure 20 x 8m on plan and 5m high at


1 31 No. 1 R -
eaves and cart away - Page 17, figure 47.

Sinqobile Centre C brickwork structure 12 x 8m on plan and 4m high


1 32 No. 1 R -
at eaves and cart away - Page 17, figure 43.

Removal of steel warehouse structure 3.8 x 3.4m on plan and 4m


1 33 No. 1 R -
high at eaves and cart away - Pages 10 & 11, figures 21 & 22.

Remove and Grub large tree and stumps of girth and cart away, with
distance not exceeding a 16km radius from the mine. Supplier to
8.2.2
confirm beforehand what materials can be dumped at identified
location. All costs included. - Page 4, figures 10 & 11.

1 34 a) Over 1m and up to and including 2m No. 300 R -

1 35 b) Over 2m and up to and including 3m No. 300 R -

Section 2 - Old Kitchen Page 7 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


1 36 c) Over 3m and up to and including 4m No. 200 R -

1 37 d) Over 4m and up to and including 5m No. 100 R -

Total Carried forward to Total Summary R -

Section 2 - Old Kitchen Page 8 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT

CIVIL & BUILDING WORKS

SECTION 2 - AREA NEXT TO SPORTS FIELD

EARTHWORKS, DEMOLITION & REMEDIAL WORKS

BILL 2

SANS 1200C SITE CLEARANCE

Clear and grub site and dispose of as directed by the Engineer within
8.2.1
free haul distance of 2km

2 1 Clear site and grub area - Page 14, figures 32 & 34. ha 0.87 R -

Remove topsoil and stockpile as directed by Engineer within free


8.2.10
haul distance

2 2 Remove topsoil layer 150mm deep - Page 13, figures 28 & 30. ha 0.87 R -

Import topsoil 300mm deep from approved borrow pit as directed


by Engineer

2 3 Hauling distance exceeding 500m and not exceeding 1000m m3 240.60 R -

2 4 Hauling distance exceeding 1000m and not exceeding 1500m m3 240.60 R -

Rip and scarify

Rip, scarify and recompact top 150mm to minimum 90% Modified


2 5 ha 0.87 R -
AASHTO density

SABS 1200C Demolition

8.2.8 Demolish and remove structures/buildings

Demolish all structures and building rubble and cart away, with
distance not exceeding a 16km radius from the mine. Supplier to
confirm beforehand what materials can be dumped at identified
location. All costs included.

Removal of 10m high mast lights including base and cart away - Page
2 6 No. 1 R -
13, figure 31.

Removal of Brickwork kerbing and cart away, with distance not


2 7 m 20.00 R -
exceeding 10 kilometres - Page 14, figure 32.

Removal of concrete V-Drain and cart away, with distance not


2 8 m2 282.24 R -
exceeding 10 kilometres - Page 7, figure 11.

Demolition of concrete base including Backfilling and cart away, with


2 9 m2 224.00 R -
distance not exceeding 10 kilometres - Page 13, figure 31.

Demolition of concrete slab with bund walls including Backfilling and


2 10 m2 214.00 R -
cart away - Page 18, figure 48.

Demolition of concrete slab with table and chairs including


2 11 No. 3 R -
Backfilling and cart away - Page 18, figure 49.

Break up and remove existing tarmac not exceeding 50mm thick and
2 12 m2 210.00 R -
cart away - Page 15, figures 36 & 37.

2 13 Backfill to trenches m 210.00 R -

Removal of brickwork palisade fence and cart away - Pages 14 & 15,
2 14 m 21.00 R -
figures 34 & 35.

Concrete fencing walls 1.2m high including the razor wire and cart
2 15 m 210.00 R -
away - Page 15, figures 36 & 37.

Section 2 - Sports Field Page 9 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


2 16 Allow for the removal of rubble and carte - Page 16, figure 38. m3 40.00 R -

Demolish Thatch roof lapa including seating area and cart - Page 18,
2 17 No. 5 R -
figure 50.

Demolish and remove single storey buildings, etc comprising


unreinforced/reinforced concrete surface beds, brick external and
internal walls, corrugated iron roof covering on timber roof
structure etc and cart away with distance not exceeding a 16km
radius from the mine. Supplier to confirm beforehand what
materials can be dumped at identified location. All costs included.

Garages brickwork structure 7 x 3.2 m on plan and 3m high at eaves


2 18 including corrugated iron garage door and cart away - Page 14, figure No. 24 R -
33.

2 19 Removal of structural steel ramp and cart away - Page 16, figure 39. No 1 R -

2 20 Removal of steel rubbish bins and cart away - Page 16, figure 40. No 5 R -

Total Carried forward to Total Summary R -

Section 2 - Sports Field Page 10 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT

CIVIL & BUILDING WORKS

SECTION 2 - OLD FLAT AND SURROUNDING AREA

EARTHWORKS, EMOLITION & REMEDIAL WORKS

BILL 3

SANS 1200C SITE CLEARANCE

Clear and grub site and dispose of as directed by the Engineer within
8.2.1
free haul distance of 2km

Clear site and grub area including trees up to 1m girth - Page 19,
3 1 ha 7.20 R -
figure 51

Remove topsoil and stockpile as directed by Engineer within free


8.2.10
haul distance

3 2 Remove topsoil layer 150mm deep ha 7.20 R -

Import topsoil 300mm deep from approved borrow pit as directed


by Engineer

3 3 Hauling distance exceeding 500m and not exceeding 1000m m3 5,798.40 R -

3 4 Hauling distance exceeding 1000m and not exceeding 1500m m3 5,798.40 R -

Rip and scarify

Rip, scarify and recompact top 150mm to minimum 90% Modified


3 5 ha 7.20 R -
AASHTO density

SABS 1200C Demolition

8.2.8 Demolish and remove structures/buildings

Demolish all structures and building rubble and cart away, with
distance not exceeding a 16km radius from the mine. Supplier to
confirm beforehand what materials can be dumped at identified
location. All costs included.

3 6 Removal of Brickwork Paving and cart away - Page 19, figure 52a. m2 1482.00 R -

Removal of 10m high mast lights including bases and cart away -
3 7 No. 7 R -
Page 5, figure 5.

Removal of 25m high mast lights including bases and cart away -
3 8 No. 2 R -
Page 10, figure 21.

3 9 Removal of fire Hydrants and cart away - Page 4, figure 1. No. 3 R -

Removal of Manhole including backfilling and cart away - Page 20,


3 10 No. 3 R -
figures 54 & 55.

Demolition of concrete paving including Backfilling and cart away -


3 11 m2 2300.00 R -
Pages 5 & 6, figures 6 & 7.

Break up and remove existing tarmac not exceeding 50mm thick and
3 12 m2 5800.00 R -
cart away - Page 4, figure 2.

3 13 Backfill to trenches - Page 20, figure 53. m3 1000.00 R -

Contact and liaise with post office to determine dedicated area for
3 14 the removal of post office post boxes including backfill and cart away Item 1 R -
- Page 7, figure 12.

3 15 Allow for the removal of rubble and cart away. m3 60.00 R -

Section 2 - Old Flats Page 11 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


Remove and Grub large tree and stumps of girth and cart away,
with distance not exceeding a 16km radius from the mine. Supplier
8.2.2
to confirm beforehand what materials can be dumped at identified
location. All costs included.

3 16 a) Over 1m and up to and including 2m - Page 19, figures 52 & 52a. No. 200 R -

3 17 b) Over 2m and up to and including 3m - Page 19, figures 52 & 52a. No. 200 R -

3 18 c) Over 3m and up to and including 4m - Page 19, figures 52 & 52a. No. 100 R -

3 19 d) Over 4m and up to and including 5m - Page 19, figures 52 & 52a. No. 50 R -

Total Carried forward to Total Summary R -

Section 2 - Old Flats Page 12 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT

CIVIL & BUILDING WORKS

SECTION 2 - KWANALA VILLAGE

ASBESTOS MANAGEMENT AND SAFE DISPOSAL OF ASBESTOS AS


PER REGULATION 21

BILL 4

REMOVAL OF EXISTING WORK

NOTE: Contractor must conduct a site visit to view and familiarise


themselves with the works and scope per structure/ house for
pricing purposes

NOTE: Some House are illegally occupied and can only be demolished
once vacant - Garage of House 1 & 12/ House Number
4,10,16,18,26,34,35,36,37,38,41,46,49,52,53

General

The contractor shall carry out the whole of the works with as little
mess and noise as possible and with a minimum of disturbance to
adjoining premises and their tenants, He shall provide proper
protection and provide, erect and remove when directed, any
temporary tarpaulins that may be necessary during the progress of the
works, all to the satisfaction of the principal agent

Water supply pipes and other piping that may be encountered and
found necessary to disconnect or cut, shall be effectually stopped off
or grubbed up and removed, and any new connections that may be
necessary shall be made with proper fittings, to the satisfaction of the
principal agent

Making good of finishes shall include making good of the brick and
concrete surfaces onto which the new finishes are applied, where
necessary

Please refer to document “COH-21-13487 Seritit Kriel INV” for the


full Asbestos report on Kwanala Village. Please price P&G's items
accordingly, if new report is required.

Remove all asbestos from demolition and safely dispose of at a


reputable location including all necessary plant and equipment and
material for the removal.

CEILINGS

Removal and safe disposal of all asbestos Ceiling Boards (House


including Garage)

4 1 House 1 m2 64.00 R -

4 2 House 2 m2 64.00 R -

4 3 House 3 m2 108.00 R -

4 4 House 4 m2 109.00 R -

4 5 House 5 m2 64.00 R -

4 6 House 6 m2 64.00 R -

4 7 House 7 m2 64.00 R -

4 8 House 8 m2 64.00 R -

4 9 House 9 m2 93.00 R -

4 10 House 10 m2 93.00 R -

Section 2 - Kwanala Village Page 13 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT

4 11 House 11 m2 64.00 R -

4 12 House 12 m2 64.00 R -

4 13 House 13 m2 64.00 R -

4 14 House 14 m2 64.00 R -

4 15 House 15 m2 92.00 R -

4 16 House 16 m2 81.00 R -

4 17 House 17 m2 81.00 R -

4 18 House 18 m2 118.00 R -

4 19 House 19 m2 118.00 R -

4 20 House 20 m2 118.00 R -

4 21 House 21 m2 118.00 R -

4 22 House 22 m2 118.00 R -

4 23 House 23 m2 126.00 R -

4 24 House 24 m2 126.00 R -

4 25 House 25 m2 118.00 R -

4 26 House 26 m2 118.00 R -

4 27 House 27 m2 118.00 R -

4 28 House 28 m2 118.00 R -

4 29 House 29 m2 118.00 R -

4 30 House 30 m2 118.00 R -

4 31 House 31 m2 118.00 R -

4 32 House 32 m2 118.00 R -

4 33 House 33 m2 118.00 R -

4 34 House 34 m2 118.00 R -

4 35 House 35 m2 118.00 R -

4 36 House 36 m2 118.00 R -

4 37 House 37 m2 84.00 R -

4 38 House 38 m2 79.00 R -

4 39 House 39 m2 79.00 R -

4 40 House 40 m2 79.00 R -

4 41 House 41 m2 118.50 R -

4 42 House 42 m2 118.50 R -

4 43 House 43 m2 102.00 R -

4 44 House 44 m2 118.50 R -

4 45 House 45 m2 118.50 R -

4 46 House 46 m2 84.00 R -

Section 2 - Kwanala Village Page 14 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


4 47 House 47 m2 100.00 R -

4 48 House 48 m2 100.00 R -

4 49 House 49 m2 100.00 R -

4 50 House 50 m2 86.00 R -

4 51 House 51 m2 86.00 R -

4 52 House 52 m2 116.00 R -

4 53 House 53 m2 89.00 R -

4 54 Adjacent structures m2 150.00 R -

4 55 Pump Station m2 10.00 R -

4 56 Education Centre m2 305.00 R -

FASCIA BOARDS

Removal and safe disposal of all asbestos Fascia Boards (House


including garage)

4 57 House 1 m2 17.00 R -

4 58 House 2 m2 17.00 R -

4 59 House 3 m2 18.00 R -

4 60 House 4 m2 11.00 R -

4 61 House 5 m2 17.00 R -

4 62 House 6 m2 17.00 R -

4 63 House 7 m2 17.00 R -

4 64 House 8 m2 17.00 R -

4 65 House 9 m2 11.50 R -

4 66 House 10 m2 11.50 R -

4 67 House 11 m2 5.50 R -

4 68 House 12 m2 5.50 R -

4 69 House 13 m2 17.00 R -

4 70 House 14 m2 17.00 R -

4 71 House 15 m2 18.00 R -

4 72 House 16 m2 9.00 R -

4 73 House 17 m2 9.00 R -

4 74 House 18 m2 11.00 R -

4 75 House 19 m2 11.00 R -

4 76 House 20 m2 11.00 R -

4 77 House 21 m2 16.00 R -

4 78 House 22 m2 16.00 R -

4 79 House 23 m2 11.00 R -

4 80 House 24 m2 11.00 R -

Section 2 - Kwanala Village Page 15 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


4 81 House 25 m2 16.00 R -

4 82 House 26 m2 22.00 R -

4 83 House 27 m2 16.00 R -

4 84 House 28 m2 16.00 R -

4 85 House 29 m2 22.00 R -

4 86 House 30 m2 22.00 R -

4 87 House 31 m2 22.00 R -

4 88 House 32 m2 22.00 R -

4 89 House 33 m2 22.00 R -

4 90 House 34 m2 22.00 R -

4 91 House 35 m2 22.00 R -

4 92 House 36 m2 22.00 R -

4 93 House 37 m2 14.00 R -

4 94 House 38 m2 14.00 R -

4 95 House 39 m2 14.00 R -

4 96 House 40 m2 14.00 R -

4 97 House 41 m2 10.50 R -

4 98 House 42 m2 10.50 R -

4 99 House 43 m2 10.00 R -

4 100 House 44 m2 10.50 R -

4 101 House 45 m2 10.50 R -

4 102 House 46 m2 14.00 R -

4 103 House 47 m2 15.00 R -

4 104 House 48 m2 14.00 R -

4 105 House 49 m2 14.00 R -

4 106 House 50 m2 11.00 R -

4 107 House 51 m2 11.00 R -

4 108 House 52 m2 11.00 R -

4 109 House 53 m2 10.00 R -

4 110 Adjacent structures m2 150.00 R -

4 111 Pump Station m2 1.00 R -

4 112 Education Centre m2 4.00 R -

WINDOW SILLS

Removal and safe disposal of all asbestos window sills

4 113 House 3 m2 8.00 R -

4 114 House 4 m2 8.00 R -

4 115 House 15 m2 11.00 R -

Section 2 - Kwanala Village Page 16 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT

4 116 House 16 m2 5.50 R -

4 117 House 17 m2 5.50 R -

4 118 House 18 m2 11.00 R -

4 119 House 19 m2 11.00 R -

4 120 House 20 m2 11.00 R -

4 121 House 21 m2 11.00 R -

4 122 House 22 m2 11.00 R -

4 123 House 23 m2 11.00 R -

4 124 House 24 m2 11.00 R -

4 125 House 25 m2 11.00 R -

4 126 House 26 m2 11.00 R -

4 127 House 27 m2 11.00 R -

4 128 House 28 m2 11.00 R -

4 129 House 29 m2 11.00 R -

4 130 House 30 m2 11.00 R -

4 131 House 31 m2 11.00 R -

4 132 House 32 m2 11.00 R -

4 133 House 34 m2 11.00 R -

4 134 House 35 m2 11.00 R -

4 135 House 36 m2 11.00 R -

4 136 House 37 m2 4.00 R -

4 137 House 38 m2 4.00 R -

4 138 House 39 m2 4.00 R -

4 139 House 40 m2 4.00 R -

4 140 House 41 m2 2.00 R -

4 141 House 42 m2 2.00 R -

4 142 House 43 m2 3.00 R -

4 143 House 44 m2 2.00 R -

4 144 House 45 m2 2.00 R -

4 145 House 46 m2 4.00 R -

4 146 House 47 m2 3.00 R -

4 147 House 48 m2 3.00 R -

4 148 House 49 m2 3.00 R -

4 149 House 50 m2 3.00 R -

4 150 House 51 m2 3.00 R -

4 151 House 52 m2 3.00 R -

Section 2 - Kwanala Village Page 17 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


4 152 House 53 m2 3.00 R -

4 153 Education Centre m2 3.00 R -

Total Carried forward to Total Summary R -

SECTION 2 - KWANALA VILLAGE

BILL NO. 5

SANS 1200C SITE CLEARANCE

Clear and grub site and dispose of as directed by the Engineer within
8.2.1
free haul distance of 2km

Clear site and grub area including trees up to 1m girth - Page 1, figure
5 1 ha 9.07 R -
1.

Remove topsoil and stockpile as directed by Engineer within free


8.2.10
haul distance

5 2 Remove topsoil layer 150mm deep ha 9.07 R -

Import topsoil 300mm deep from approved borrow pit as directed by


Engineer

5 3 Hauling distance exceeding 500m and not exceeding 1000m m3 13605.00 R -

5 4 Hauling distance exceeding 1000m and not exceeding 1500m m3 13605.00 R -

Rip and scarify

Rip, scarify and recompact top 150mm to minimum 90% Modified


5 5 ha 9.07 R -
AASHTO density

REMOVAL OF EXISTING WORK

NOTE: Contractor must conduct a site visit to view and familiarise


themselves with the works and scope per structure/ house for
pricing purposes

NOTE: Some House are illegally occupied and can only be demolished
once vacant - Garage of House 1 & 12/ House Number
4,10,16,18,26,34,35,36,37,38,41,46,49,52,53

General

The contractor shall carry out the whole of the works with as little
mess and noise as possible and with a minimum of disturbance to
adjoining premises and their tenants, He shall provide proper
protection and provide, erect and remove when directed, any
temporary tarpaulins that may be necessary during the progress of
the works, all to the satisfaction of the principal agent

Water supply pipes and other piping that may be encountered and
found necessary to disconnect or cut, shall be effectually stopped off
or grubbed up and removed, and any new connections that may be
necessary shall be made with proper fittings, to the satisfaction of
the principal agent

Making good of finishes shall include making good of the brick and
concrete surfaces onto which the new finishes are applied, where
necessary

Demolish all structures and building rubble and cart away, with
distance not exceeding a 16km radius from the mine. Supplier to
confirm beforehand what materials can be dumped at identified
location. All costs included.

8.2.5 Breaking up and removing unreinforced concrete


5 6 1,8m high concrete fence around the houses m 1,370.00 R -

Section 2 - Kwanala Village Page 18 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


Removing Steel Palisade Fencing
Dismantle and remove Steel Palisade Fencing not exceeding 2.4m
5 7 m 210.00 R -
high, including posts, gates, foundations, etc. Complete.

Removing Diamond Mesh Fencing


Dismantle and remove Diamond Mesh Fencing not exceeding 2.4m
5 8 m 40.00 R -
high, including posts, gates, foundations, etc. Complete.

SABS 1200C Demolition

8.2.8 COMPLETE STRUCTURE INCLUDING FOUNDATIONS

Breaking up and removing reinforced concrete, including cutting off


and removing reinforcement, foundation brickwork and strip
footings to 1m below NGL, superstructure external and internal
brickwork, including concrete foot paths as well as removal of all
fittings, timber or steel trusses, IBR roof sheeting, gutters and
downpipes complete.

Note: Please refer to document “COH-21-13487 Seriti Kriel INV” for


images of the respective structures.

5 9 House 1 m2 110.00 R -

5 10 House 2 m2 110.00 R -

5 11 House 3 m2 110.00 R -

5 12 House 4 m2 120.00 R -

5 13 House 5 m2 80.00 R -

5 14 House 6 m2 80.00 R -

5 15 House 7 m2 80.00 R -

5 16 House 8 m2 80.00 R -

5 17 House 9 m2 90.00 R -

5 18 House 10 m2 90.00 R -

5 19 House 11 m2 80.00 R -

5 20 House 12 m2 80.00 R -

5 21 House 13 m2 80.00 R -

5 22 House 14 m2 85.00 R -

5 23 House 15 m2 100.00 R -

5 24 House 16 m2 100.00 R -

5 25 House 17 m2 100.00 R -

5 26 House 18 m2 120.00 R -

5 27 House 19 m2 120.00 R -

5 28 House 20 m2 120.00 R -

5 29 House 21 m2 120.00 R -

5 30 House 22 m2 120.00 R -

5 31 House 23 m2 125.00 R -

5 32 House 24 m2 125.00 R -

5 33 House 25 m2 120.00 R -

Section 2 - Kwanala Village Page 19 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


5 34 House 26 m2 120.00 R -

5 35 House 27 m2 120.00 R -

5 36 House 28 m2 120.00 R -

5 37 House 29 m2 120.00 R -

5 38 House 30 m2 120.00 R -

5 39 House 31 m2 120.00 R -

5 40 House 32 m2 120.00 R -

5 41 House 33 m2 120.00 R -

5 42 House 34 m2 120.00 R -

5 43 House 35 m2 120.00 R -

5 44 House 36 m2 120.00 R -

5 45 House 37 m2 110.00 R -

5 46 House 38 m2 120.00 R -

5 47 House 39 m2 100.00 R -

5 48 House 40 m2 90.00 R -

5 49 House 41 m2 120.00 R -

5 50 House 42 m2 120.00 R -

5 51 House 43 m2 110.00 R -

5 52 House 44 m2 120.00 R -

5 53 House 45 m2 120.00 R -

5 54 House 46 m2 110.00 R -

5 55 House 47 m2 110.00 R -

5 56 House 48 m2 110.00 R -

5 57 House 49 m2 110.00 R -

5 58 House 50 m2 100.00 R -

5 59 House 51 m2 100.00 R -

5 60 House 52 m2 110.00 R -

5 61 House 53 m2 110.00 R -

5 62 Adjacent structures m2 200.00 R -

5 63 Pump Station m2 25.00 R -

5 64 Education Centre m2 305.00 R -

Demolish and remove concrete slab with bud walls and cart away

Demolition of concrete slab with bund walls including Backfilling -


5 65 m2 10.00 R -
Page 21, figure 56.

Demolish and remove children's play area and cart away

5 66 Demolition of children's wood play area - Page 21, figure 56. No. 1 R -

Demolish and remove existing carport and cart away

Section 2 - Kwanala Village Page 20 of 21


DEMOLISHING
BOQ
OUTSTANDING SCOPE

BILL NO ITEM NO PAY REF DESCRIPTION UNIT QTY RATE AMOUNT


5 67 Removal of existing carport and cart away - Page 21, figure 57. m2 70.00 R -

Demolish and remove Sewage Plant Complete and cart away

5 68 Demolition of Sewage Plant including Backfilling m2 2,200.00 R -

GARAGE

Breaking up and removing reinforced concrete, including cutting off


and removing reinforcement, foundation brickwork and strip
footings to 1m below NGL as well as superstructure Brickwork, doors,
windows and Roofs Complete

5 69 Removal of Double Garage unit complete No 21 R -

Carefully breaking up and removing reinforced concrete, including


cutting off and removing reinforcement, foundation brickwork and
strip footings to 1m below NGL as well as superstructure brickwork,
doors, windows and roofs complete, Including all necessary patching
work to leave existing carport in its original state

5 70 Removal of Single Garage unit complete No 16 R -

SUNDRY ITEMS

Taking out and removing piping, sanitary fittings, etc including


disconnecting piping from fittings and cart away, with distance not
exceeding a 16km radius from the mine. Supplier to confirm
beforehand what materials can be dumped at identified location.
All costs included.

5 71 All Sanitary Fittings per house No 37 R -

5 72 Disconnect and make safe of existing electricity supply No 37 R -

5 73 Disconnect and make safe of existing sewer line No 37 R -

5 74 Disconnect and make safe of existing electricity supply No 37 R -

Remove and Grub large tree and stumps of girth and cart away,
with distance not exceeding a 16km radius from the mine. Supplier
8.2.2
to confirm beforehand what materials can be dumped at identified
location. All costs included.

5 75 a) Over 1m and up to and including 2m. No. 150 R -

5 76 b) Over 2m and up to and including 3m. No. 200 R -

5 77 c) Over 3m and up to and including 4m. No. 100 R -

5 78 d) Over 4m and up to and including 5m. No. 50 R -

5 79 e) Over 5m and up to and including 6m. No. 10 R -

Total Carried forward to Total Summary R -