Accomplishment
No. Description of Activity Inclusive Date/s
13 Troubleshoot the Main Breaker of the Main Building April 25, 2023
with Sir John Mark A. Cantila
14 Re-install the outlet at the biometric area April 28, 2023
15 Troubleshoot the Lighting Circuit of Room 3, 4 and 5 May 13-14, 2023
of Building 17 (Repaired)
16 Re-assemble the Fluorescent case wiring and replace May 16, 2023
with a latest fluorescent bulb
17 Conduct Electrical Inspection May 29, 2023
18 Troubleshooting the current main source of Building 16 June 29, 2023
19 Sound System Outlet (3 Loads) Installation July 10, 2023