No. Description of Activity Inclusive Date/s
1 Conduct Electrical Inspection August 8, 2022
(During Brigada Eskwela Period)
2 Install 4 Lightings at Home Economics Room August 10-11, 2022
(During Brigada Eskwela Period)
3 Lighting Installation @ Grade 9 SPS (Saturday) September 24, 2022
4 Troubleshoot the Outlet Circuit of Building 12 October 13, 2022
5 Repair the Switch of Room 9, Building 17 October 19, 2022
6 Troubleshoot the Current Source of November 23-24, 2022
Buildings 16 and 17
7 Breaker Replacement at Building 15 with Sir John January 17, 2023
Mark A. Cantila
8 Re-install the Service Entrance of the Main Building. February 2-3, 2023
9 Troubleshoot the Outlet Circuit of Room 6 and 7 at March 3, 2023
Building 17
10 Floodlight trouble shooting @ Bldg 16 March 10, 2023
11 Repaired Lighting Source and replace the load @ April 17, 2023
Registrar s Office
12 Re-wire the Service Drop Wire and Repaired 1 Switch April 21, 2023
of Building 17.

Prepared by:

SHERWIN S. CASTILLO
T-1/School Electrician

Approved by:

MARIBEL A. UGSIMAR PRELYN O RASALAN


OIC-JHS OIC-SHS

ROLANDO D. ACORIBA, JR. PhD, EdD, DPM


District Supervisor
ACCOMPLISHMENT REPORT
Date: April 25, 2023 – July 10, 2023

“As a School Electrician”


Name of Teacher: Sherwin S. Castillo
Position/Subject Taught: T-1/ Mathematics 8
Teaching Load: 20 Hours

Accomplishment
No. Description of Activity Inclusive Date/s
13 Troubleshoot the Main Breaker of the Main Building April 25, 2023
with Sir John Mark A. Cantila
14 Re-install the outlet at the biometric area April 28, 2023
15 Troubleshoot the Lighting Circuit of Room 3, 4 and 5 May 13-14, 2023
of Building 17 (Repaired)
16 Re-assemble the Fluorescent case wiring and replace May 16, 2023
with a latest fluorescent bulb
17 Conduct Electrical Inspection May 29, 2023
18 Troubleshooting the current main source of Building 16 June 29, 2023
19 Sound System Outlet (3 Loads) Installation July 10, 2023

Prepared by:

SHERWIN S. CASTILLO
T-1/School Electrician

Approved by:

MARIBEL A. UGSIMAR PRELYN O RASALAN


OIC-JHS OIC-SHS

ROLANDO D. ACORIBA, JR. PhD, EdD, DPM


District Supervisor

You might also like