Client / Project : Academy of Defence Industries (ADI) Site Location Al Dirab, Riyadh
Inspection Date: 27-Nov-23 Inspection Carried out By: HSE Officer Muhammad Noman Qamar
Risk Level and Observations Closure Time: Extreme Risk /Red- Immediately or within One Week; High Risk /Peel- within Two Weeks, Moderate Risk/Yellow - within Three Weeks Low/Green - within One Month.
Note:- This report to be discussed, agreed with the Operation Team and communicated to the relevant parties. Follow-up and verification to be done until closure accordingly. Record to be maintained in the site Safety Folder.
Building B02
Statutory
1 ADI Backside. Poor-Housekeeping. MED Removal of Material Requires. SFCL Team ASAP CLOSE Housekeeping Requires.
Required.
Building B01
Statutory
2 ADI Second Floor. Poor-Housekeeping. HIGH Removal of Material Requires. SFCL Team ASAP CLOSE Satisfactory
Required.