HSEQ INSPECTION REPORT

Client / Project : Academy of Defence Industries (ADI) Site Location Al Dirab, Riyadh

Facilities Manager's Name: Tahir Mehmood Abbasi Faciltiy Engineer Mohammed Alsubie

Inspection Date: 26-Oct-23 Inspection Carried out By: HSE Officer Muhammad Noman Qamar

Risk Level and Observations Closure Time: Extreme Risk /Red- Immediately or within One Week; High Risk /Peel- within Two Weeks, Moderate Risk/Yellow - within Three Weeks Low/Green - within One Month.

Note:- This report to be discussed, agreed with the Operation Team and communicated to the relevant parties. Follow-up and verification to be done until closure accordingly. Record to be maintained in the site Safety Folder.

Action Taken Target


Sr.# Location Area / Room Observations Images Risk Type Risk Level Recommendations Current status After Rectification Images Remarks
By Date

Woker Working at height always


have to wear Full-Body harness
Building B02B for fall prevention. Proper and
Working at Height Without Wearing Full- Statutory
1 ADI Theatre Area. HIGH Inspected Scaffolding and SFCL Team ASAP CLOSE Satisfactory
Body Harness and on Improper Platform. Required.
platform to be used for work at
height which consists of green tag
on it.

Multi-Purpose Hall Properly Insulated Wire to be


Statutory
2 ADI Inside. Power-Tools Wire Electricity. HIGH used with power-tools and Must SFCL Team ASAP OPEN
Required.
consists of socket on it.

Building B02B Properly Insulated Wire to be


Statutory
3 ADI Corridor. Power-Tools Wire Electricity. HIGH used with power-tools and Must SFCL Team ASAP OPEN
Required.
consists of socket on it.

Storage Area
Statutory
4 ADI Outside. Poor-Housekeeping. MED Removal of Wastage Required. SFCL Team ASAP CLOSE Satisfactory.
Required.