You are on page 1of 1

HSEQ INSPECTION REPORT

Client / Project : Academy of Defence Industries (ADI) Site Location Al Dirab, Riyadh

Facilities Manager's Name: Malik Ashfaque Faciltiy Engineer Mohammed Alsubie

Inspection Date: 13-Nov-23 Inspection Carried out By: HSE Officer Muhammad Noman Qamar

Risk Level and Observations Closure Time: Extreme Risk /Red- Immediately or within One Week; High Risk /Peel- within Two Weeks, Moderate Risk/Yellow - within Three Weeks Low/Green - within One Month.

Note:- This report to be discussed, agreed with the Operation Team and communicated to the relevant parties. Follow-up and verification to be done until closure accordingly. Record to be maintained in the site Safety Folder.

Action Taken Target


Sr.# Location Area / Room Observations Images Risk Type Risk Level Recommendations Current status After Rectification Images Remarks
By Date

Multi purpose Hall


Statutory
1 ADI Inside. Poor Housekeeping. MED Removal of wastage required. SFCL Team ASAP OPEN
Required.

Building B02 Roof Materials to be stored at its


Poor-Housekeeping and improper storage Statutory
2 ADI Top. HIGH designated area and proper SFCL Team ASAP OPEN
of materials. Required.
housekeeping required.

Building B02B First


Floor Testing Statutory
3 ADI Poor Housekeeping. HIGH Removal of wastage required. SFCL Team ASAP CLOSE Satisfactory.
Room. Required.

Building B02B
Statutory
4 ADI Rooftop poor housekeeping. MED Removal of wastage required. SFCL Team ASAP OPEN Satisfactory.
Required.