HSE Inspection Report - 02 Dec 2024
HSE Inspection Report - 02 Dec 2024
Client / Project : Academy of Defence Industries (ADI) Site Location Al Dirab, Riyadh
Inspection Date: 2-Jan-24 Inspection Carried out By: HSE Officer Muhammad Noman Qamar
Risk Level and Observations Closure Time: Extreme Risk /Red- Immediately or within One Week; High Risk /Peel- within Two Weeks, Moderate Risk/Yellow - within Three Weeks Low/Green - within One Month.
Note:- This report to be discussed, agreed with the Operation Team and communicated to the relevant parties. Follow-up and verification to be done until closure accordingly. Record to be maintained in the site Safety Folder.
Building B01
Statutory
3 ADI Inside . Improper placement of material HIGH Materials to be Removed. SFCL Team ASAP OPEN
Required.
Storage Area
Statutory
4 ADI outside. Improper placement of interlock materials. . HIGH Interlock to be placed properly. SFCL Team ASAP CLOSE Satisfactorily.
Required.