You are on page 1of 2

9483541831 / 7676701831

QUOTATION
CLIENT: Maya Autobahn ventures LLP, Date: 21-08-2023
No555, axis padegal, 4th floor, j.p.nagar 3rd phase,
9th cross, Bangalore -560078.
PRPOERTY: Devihalli, Channarayapatna taluk, Hassan district.
CLIENT ID - COM-FSTN-003

Dear Sir,
We look forward to provide you a service. The quotation for the Compound wall and retaining
wall for proposed fuel station. The price and other work details as follows.

SL NO: ITEM DESCRIPTION UNIT QTY RATE AMOUNT


Excavation at boundary line of
compound wall by manually and
machinery for levelling dressing the
edges, with all lifts back filling in
layers of 150mm watering and com-
1 paction removal of slurry while ex-
cavation and keeping the area free
from water, rate to inculde dispos-
ing the excess earth and spreading
the layers into site level as per the
design upto 1.5m cumic 352 200 70400

concreting of P.C.C (1:4:8) M10


grade for the thickness as per design
2 with proper mix proportion of con-
crete, compation and levelling. this
includes the shuttering if required as
per site condition cumic 31 5000 155000
READY MIX CONCRETE laying
Reinforced Cement Concrete of
specified grade 53 with proper
20mm and less size coarse aggre-
3 gates with necessary admixtures,
pouring using pump, with proper
compaction using vibration, scaf-
folding if required on site demand,
curing.
footing concrete cumic 84.49 5200 439348

1
retaining wall above footing cumic 112.66 5200 585832

reinforcement for RCC work with


high yield strength dia bar (HYSD)
4
as per design mentioned grade of
steel of including cutting, bending,
placing in position according to
drawings and binding the reinforce-
ment in proper spacing
material tons 28.16 76000 2140160
fabricating charges tons 28.16 18000 506880

5 compound wall above fromation


level upto the height of 1.5m pre-
casted planks sqm 497 1300 646100
Total 4543720
CP % 20 908744
Total 5452464

PAYMENT CONDITIONS:
1. Above price is of Exclusive of 18% GST.
2. Above price is valid upto 30 days.
3. Payment made in three stages –Advance 50 % + GST
During work in progress 35 % + GST
Remaining immediate before handover 15 % + GST.