Apron's slope volume as cone Vac 998.443306 cu.m ᴫ/3 x (Rai^2+Rao^2+ Rai x Rao) x Ha
OTHER
HHLL
DESIGN CERTIFICATION
(DESIGN AGENCY)
Ht
0.6
Hw Hb + Hr
Hd 0.5
Fa (1:3 Hf
slope)
Ld
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
0A1 IS COVERED, FOR ALL APPROVAL
BASIS OF CALCULATION
1. Net volume of one (1) Tank was utilized to size the dike wall requirement.
REVISION VALIDATION
2. All items inside the dike wall within the dike wall height has been considered as wastage volume.
3. Vehicle access road ramps - is considered as 6m wide having a 14% slope (1:7) ramp
DRAWING COMPLETION CERTIFICATE NO.
4. 200mm additional height of dike for Freeboarding (for wave formation etc) - is considered.
5. 1% of tank capacity considered for pipes/supports/platforms.
6. Ht considered as HHLL.
7. 100mm additional height is considered in dike for rainfall per RCER 2015
8. Overspill modeling is done for Axisymmetric tank rupture case only based on loss prediction work done by Greenspan & Johansson and Atheron.
THIS REVISION NO.
DIKE WALL CALCULATION DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO REV.NO.
SAUDI ARABIA
R/H e A B
0.3 33.7 0.959215 2.042395
0.3 90 0.9255 3.37164
0.5 90 0.8873 3.1682
1 30 0.8248 1.3067
1 33.7 0.825515 1.330355
1 45 0.8277 1.4026
1 60 0.7746 1.3451
1 90 0.7918 2.6596
2.5 90 0.5789 2.0818
Reference:
2169-3358-2008-1-949.pdf (silverchair.com)