Tank/Equipment No: MTBE TANK (440-T-2007)

User inputs Output

UNTIL CERTIFIED AND DATED


THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION Tank Dia Dt 37.100 m Tank Net Volume Vt 19999.1 cu.m
REVISION DESCRIPTION

Tank Height Ht 18.5 m 125790.49 BBL


No. of Tanks in dike N 1
Dike height Hd 2m Dike Capacity Required = Vt X V%
Dike length (proposed) Ld 129.0 m 21999.0 cu.m
Dike width (proposed) Wd 112.0 m
Foundation width extension Hw 0.9 m Designed Capacity of dike =
Foundation height Hf 1m 21541.9 cu.m
Apron Fa Yes Total vol in dike 19999.05 cu.m
Freeboard height Hb 0.2 m Result : 125790.49 BBL
Rainfall height (per RCER 2015) Hr 0.1 m
Percentage for pipes volume Pp 1% % of Vt Dike design volume is less by 458 cu.m
Dike wall type Tw Trapezoid
Dike angle e 45 degrees No overspill danger
JOB ORDER / EWO NO.

Dike capacity required V% 110% % of Vt


DATE

No. of road accessway inside Rr 1

Automated Volume calculations


Total dike volume Vd 24561.6 cu.m Ld x Wd x (Hd - Hb -Hr)
Tank area At 1081.02989 sq.m ᴫ x (Dt/2)^2
REV. NO.

Tank volume inside dike Vk 756.72092 cu.m (Hd - Hf - Hb -Hr) x At


Foundation dia Df 38.9 m Hw x 2 + Dt
Foundation volume Vf 1188.47235 cu.m Hf x ᴫ x (Df / 2)^2
Apron's height Ha 0.75 m Hf - 0.25
Apron's inner radius Rai 19.45 m Df/2
Apron's outer radius Rao 21.7 m Ha x 3 + Rai
BY/DATE

Apron's slope volume as cone Vac 998.443306 cu.m ᴫ/3 x (Rai^2+Rao^2+ Rai x Rao) x Ha
OTHER

Apon's vol. exclud. foundation Va 107.08904 cu.m Vac - { Ha x ᴫ x (Df / 2)^2 }


Dike wall slope area (if trapezoid) At 3.2 sq.m {Hd x Hd/tan(e)/2 + 0.6 x Hd }
Dike wall area excl. freeboard Aw 2.975 sq.m At - [(Hb+Hr)x{(Hb+Hr)/tan(e)}/2 + 0.6 x (Hb+Hr)]
Dike wall slope volume (trapezoid) Vw 1433.95 cu.m (Ld + Wd) x 2 x Aw
Pipes/support/access vol Vp 199.990529 cu.m Pp x Vt
OPERATIONS/DATE

Road/access area inside Ar 14 sq.m {Hd x (Hd x 7)}/2


Road/access volume inside Vr 84 cu.m Ar x Rr x 6meter
Area of ramp's 1 side slope Ars 4.66666667 sq.m {(Hd / 3) x (Hd x 7)}/2 or Ar/3
Volume of ramp's 2 side slopes Vrs 6.22222222 cu.m 2 x {Ars x Hd / 3}
REVIEW FOR KEY DRAWINGS

Total wastage volume Vg 3019.72415 cu.m Vr + Vrs + N x (Vf + Va + Vp) + Vw + (N-1) x Vk


Available Dike Volume Vq 21541.9 cu.m Vd - Vg
CONST. AGENCY/DATE

Overtopping case (for SPILL MODELING)


Ratio of tank wall to dike L/R 2.47708895 {(Ld-Dt)/2} / (Dt/2) No impact Safe range: 0.33 < L/r < 4
Ratio of dike height to tank h/H 0.10810811 Hd/Ht
REQUIRED

Tanks static head ratio R/H 1 (Dt/2) / Ht 4 rows


Overspill A factor A 0.8277
Overspill B factor B 1.4026
✘ Overspill flow rate Q 0.71124598 A ^ {-B x (h/H)} Safe Safe range: 0 < Q < 1
CERTIFIED/DATE

HHLL
DESIGN CERTIFICATION
(DESIGN AGENCY)

Ht

Max Liquid level


in dike
Dt
ENGG./DATE

0.6
Hw Hb + Hr

Hd 0.5
Fa (1:3 Hf
slope)

Ld
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
0A1 IS COVERED, FOR ALL APPROVAL

BASIS OF CALCULATION
1. Net volume of one (1) Tank was utilized to size the dike wall requirement.
REVISION VALIDATION

2. All items inside the dike wall within the dike wall height has been considered as wastage volume.
3. Vehicle access road ramps - is considered as 6m wide having a 14% slope (1:7) ramp
DRAWING COMPLETION CERTIFICATE NO.

4. 200mm additional height of dike for Freeboarding (for wave formation etc) - is considered.
5. 1% of tank capacity considered for pipes/supports/platforms.
6. Ht considered as HHLL.
7. 100mm additional height is considered in dike for rainfall per RCER 2015
8. Overspill modeling is done for Axisymmetric tank rupture case only based on loss prediction work done by Greenspan & Johansson and Atheron.
THIS REVISION NO.

DIKE WALL CALCULATION DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO REV.NO.

STORAGE TANK: MTBE TANK (440-T-2007) DOC

SAUDI ARABIA
R/H e A B
0.3 33.7 0.959215 2.042395
0.3 90 0.9255 3.37164
0.5 90 0.8873 3.1682
1 30 0.8248 1.3067
1 33.7 0.825515 1.330355
1 45 0.8277 1.4026
1 60 0.7746 1.3451
1 90 0.7918 2.6596
2.5 90 0.5789 2.0818