SAKSHAM ASSOCIATES

Creating structures that shapes lives

Quotation
Item Rates Remark Item Rates Remark
Floor Kitchen
21 /Sqft 600 /Rft
(2’ X 2’) Granite
Floor Kadappa
24 /Sqft 2500 Unit
(2’ X 4’) Cupboard
Wall Riser/
25 /Sqft 80 /Rft
(1’ x 2’) Tread
Wall Granite
23 /Sqft 15 /Rft
(1’ x 1.5’) Cutting
Wall WC Bottom
28 /Sqft 1500 Unit
(2’ x 4’) Tile (4' X 3')
Bath
Skirting 24 /Rft Bottom Tile 1800 Unit
(7' X 4')
Granite
50 /Rft Block Fixing 1800 Brass
Molding
Umbra
Patti
Full Molding 75 /Rft 70 /Rft
(Cutting &
fitting)
Chamfer
50 /Rft Epoxy fill 13 /Rft
Molding
Granite
Cutting 75 /Rft
Fitting

Terms & conditions

 Payment Schedule of the finished work should be done on a weekly basis.


 All the required material (tiles, cement, manufactured sand) should be
provided by the owner/builder in the parking area (Should be less than 50
ft from lift/ staircase area. In case if transportation distance is increased,
additional transportation charges will be added per running feet.
 Standing charges will be charged 900/ per unskilled labour and 1500 /maestri
in case of material unavailability, lack of electricity or any other case
which is not related to labour contractor.
 Shelter area and water for labour will be provided by the owner/builder.