CONCOURSE FFL

LVL.

5th LANDING FFL


LVL.

4th LANDING FFL


LVL.

3rd LANDING FFL.


LVL.

2nd LANDING FFL.


LVL.

1st LANDING FFL


LVL.

FOOTPATH
LVL.

C1 C2 C3 C4 C5 C6
F1 F1 F1 F2 F2 F2

SECTION A-A

SCHEDULE OF COLUMNS
COLUMN SIZE / SHAPE
MARKED

C1 C2 C3 C4 C5 C6
ST
CONCOURSE 1 LANDING
LEVEL
SCHEDULE OF FOOTING
TYPE OF LOCATION OF SIZE OF FOOTING (MM) SCHEDULE OF BEAMS
5th LANDING 4th LANDING 3rd LANDING 2ndLANDING
FOOTING FOOTING L B D BEAM MARKED SIZE W x D REMARKS

ENTRY EXIT- CONCOURSE BEAM

LEVEL PLAN

C1 C2 C3 C4 C5 C6

F2 F2
F1 F1 F1 F2
C7 / C8
DETAIL: 1 C1
DETAIL: 2 DETAIL: 3
ENTRY EXIT- FOOTING PLAN

REFERENCE DESIGN DOCUMENT FOR NOTES REFER SHEET NO. 1 OF 4


DOC. NO : MML4-CA09-CHCTPL-CIV-CLN-6032 THIS DRAWING IS APPLICABLE FOR STATION OF PACKAGE
DOC.TITLE : DETAIL DESIGN REPORT FOR (CA09). THE DRAWING IS TO BE READ IN CONJUNCTION
STANDARDIZATION OF STAIRCASE FOR REINFORCEMENT SCHEDULE
WITH CORRESPONDING STATION FRAMING PLAN.
SINGLE COLUMN
REFER SHEET NO. 2 OF 4
REV. NO. : A
DATE : 08.02.2023

DESIGNATION NAME SIGN DESIGNATION NAME SIGN