You are on page 1of 7

FORBES MARSHALL SINGLE ORIFICE FLOAT

TRAP

CUSTOMER NAME M/s. THEJO, Chennai


CONTACT PERSON Mr. SANTHOSH
REFERENCE NO. 2022-23/SSD/NR/THEJO/206
DATE 06-OCT-2022

1
REF NO: 2022-23/SSD/NR/THEJO/212
DATE: 10-OCT-2022

To,
M/s. THEJO ENGINEERING LIMITED,
CHENNAI

Kind Attn: Mr. SANTHOSH.K

Sub.: Techno Commercial Offer for Process Steam Traps as per enquiry

Dear Sir,

Greetings from Forbes Marshall!

We thank you for the kind courtesy extended to us during our walk through study to find
the potential for energy conservation from steam savings. Please find our detailed techno-
commercial proposal for the same.

We look forward to associate for this requirement & do contact us for any clarifications.

For Forbes Marshall Pvt. Ltd.

Rajesh Narayanan
Chennai
Cell: 72990 13300

2
Characteristics of Process Traps:
A trap selected for a Process Heating application must have the following characteristics:

It must be a continuous discharge type of trap and must remove condensate as soon as it is
formed without accumulation. This is very essential since any accumulation of condensate
will result in decrease of heat transfer area and would affect the heat transfer rate.

Must be able to handle fluctuating condensate load with equal efficiency since in any
process the condensate steam load is bound to vary being maximum during start up,
minimum once the desired temperature are reached. The trap should work without loss in
efficiency and without wasting steam under fluctuating loads.

The trap must have adequate air venting capacity and should not get steam locked. This is
essential to send out air during start-up and ensures quick start up.

Further to the above points, our Forbes Marshall Traps have following salient features:

 The seat, the valve is always sub-merged under a minimum water seal, which
prevents any live steam leakage.

 The trap has horizontal inlet outlet connections, which ensures easy and economical
installation.

 The trap can be opened for inspection/ repair without disturbing the line.

 The movement of the valve is guided.

Process traps are very critical to process parameters and the product output, both, in terms
of quality and quantity (batch timing).
• The trap should discharge condensate as soon as it is formed completely.
• The trap should not leak live steam.
• The trap should be able to handle heavy start-up loads.
• The trap can operate against back pressure
• The trap should have the provision to discharge air and other non-condensable
gases.
• Traps perform well with light loads.
• Traps are responsive to slugs of condensate.

Ground reality about process condensate evacuation application and its effects
1. As often seen in the industries, installation is limited to a trap with some valve’s
2. However, components like below are essential as per god engineering practise
3. Advantages of having Strainer’s, NRV and Sight Glass:
4. Upstream of trap a strainer avoids any rust, foreign material, dirt particles from
going to the trap chamber and obstructing condensate removal, since the orifice

3
from which condensate is removed is very small (less than 5 mm).
5. NRV downstream of trap avoids any possibility of back pressure of condensate.
Because condensate lines after traps will be connected to the common condensate
header. So if the working pressures of the utilities are different, there are good
chances of back pressure of one trapping causing no condensate removal from other
trap. By installing NRV after every trap, there is no back pressure on any of the trap.
This leads to the efficient condensate removal.
6. Sight Glass downstream of trap helps in knowing what is passing through the
condensate piping i.e. whether it is condensate or steam. If steam is leaking through
the trap, then by visual inspection we can identify passing trap.
7. Adequate number of valves upstream, downstream, bypass and to test the traps and
depressurise in closed loop are required.

4
Expectations from Ideal Process Trap:

 Should not leak live steam during operation


 Discharge condensate instantaneously
 Modulate the discharge based on the condensate formation rate
 Removal air / incondensable gases as and when they enter the heat exchange area

Dos and Don’ts for Process Traps:

 Avoid group trapping


 Avoid water hammer conditions
 Install trap as close to the equipment as possible
 Ensure strainer is provided on the upstream of the trap
 While sizing the trap give due consideration to warm up loads
 Do not allow excessive back pressure to build up
 Provide trap monitoring for performance monitoring of the trap

5
COMMERCIAL OFFER:
UNIT PRICE IN QTY TOTAL
S. NO DESCRIPTION OF ITEMS SIZE
INR EACH
FORBES MARSHALL SINGLE ORIFICE
FLOAT TRAP WITH SLR.
1. MODEL: 040SOFT31 40 NB 64,850 1 64,850
MOC: CI
IBR CERTIFIED.

HSN CODE – 84819090

Commercial terms and conditions:


Prices : Ex Our works Pune (All taxes/duties extra)

Terms of Payment : 100 % against Proforma invoice before dispatch

GST : The present rate of GST is 18%.

12 months from commissioning or 18 months from supply


Warranty :
whichever is earlier.

Freight : To be paid by Customer Extra at actuals

Delivery : Within 4 Weeks from the receipt of advance payment

Validity : 30 Days from the date of offer

Please raise your Purchase Order in the name of


Forbes Marshall
Pvt. Ltd.
Ordering Information 73/159,6TH
: AVENUE
GSTIN: HARRINGTON
ROAD CHETPET
CHENNAI-600031

Please e-mail PO copy to


Order processing :
nrajesh@forbesmarshall.com for processing

This offer shall be governed by our standard terms and condition


Terms and Conditions of sale which is available on the following link:
https://www.forbesmarshall.com/terms-of-sale.aspx Note:
Please note that a binding contract shall come into effect only

6
upon a sales order acceptance issued by us against your Purchase
Order. We request you to kindly carefully read the terms and
conditions, including but not limited to the terms in relation to
warranties and limitation of liability. We reserve the right to
amend the standard terms and conditions, from time to time.

RAJESH.N
72990 13300

You might also like