Professional Documents
Culture Documents
Evaluation criteria
1. Fundamental criteria
Must meet criteria/pass-fail criteria
12. EXCITER
Single-shaft circular exciter
13. STEERING SYSTEM
Servo assisted, maintenance free center articulation with oscillation facility,
front and rear winching points.
14. SPRINKLER/SCRAPER
Pressurized sprinkling system, spring loaded retractable scraper (two each
drum), changeable nozzles, multiple water filtering.
15. DRIVERS STAND/INSTRUMENTS
Fuel, battery charging current, sprinkler system, parking brake, hour meter,
engine oil pressure, air filter condition, hydraulic oil level and temperature,
water level indicator, cup holder, comfortable adjustable operator seat with
arm rests and safety belt.
16. SERVICE CAPACITIES
Fuel: 95L
Sprinkler water:- 230L
17. ELECRICAL SYSTEM
Battery capacity:- 62V
Alternator:- 80A
18. AFTER SALES SERVICE: The supplier should have local agent to give
maintenance service under its warranty period.
19. Spare parts: Compulsory spare parts should be delivered along with the
roller compactor.
20. Warranty The Supplier 2 years warrants that all the Goods are new, unused,
and of the most recent or current models, and that they incorporate all recent
improvements in design and materials.
21. Manuals and Brochures :During documentation the supplier should attach
the manufacturer brochures and the operation and maintenance manual during
delivery period .Be noted all manuals should be in English
22. Taxes and duty: The Supplier shall be entirely responsible and include the
price in financial offer for all taxes, stamp duties, license fees, and other
duties
23. Operational training :the supplier should give operational training during
delivering the equipment
24. DOCUMENTATION
All maintenance and operational manuals should be submitted during
delivery. Written language should be English.