Issuance of TRF/SR/MR Nominating of Subcontractors/Suppliers Issuing of Material Submittals Issuance of LPO/Subcontract Agreement Delivery Dates Required on Site Period (Leadtime) S. No. Material Description Planned - As per Actual Issuance Planned - As per Actual Planned - As per Anticipated Planned - As per Actual Planned - As per As per Base Line Subcontractor / Actual Actual Delivery Base Line Date MR/TRF Reference Base Line Nomination Base Line Document No Delivery Period Remarks Base Line Subcontract/PO PO/SC Reference Base Line Actual Leadtime Schedule Supplier Submission Date Dates Schedule (Matls. Dept.) Schedule Date Schedule (Leadtime) Schedule issued Dates Schedule A Civil: x x x x x x x x x x x x x x x x x x x
10
11
12
13
14
15
16
17
Sub-Total for Civil Works Packages 0 0 0 0
B Architectural: x x x x x x x
Sub-Total for Architectural Works Packages 0 0 0 0 0
C MEP Works (by Subcontractors scope)
Sub-Total for MEP Works by Subs Packages 0 0 0 0 0