You are on page 1of 8

भारतीय राष्ट्रीय राजमार्ग प्राधिकरण दरू भाष / Phone: 91-11-25074100/25074200

फ़ैक्स /Fax: 91-11-25093507/ 25093514


(सड़क पररवहन और राजमार्ग मंत्रालय)

National Highways Authority of India


(Ministry of Road Transport and Highways) June 28, 2023
जी-5 एवं 6, सैक्टर-10, द्वारका, नई दिल्ली-110075
G-5 & 6, Sector 10, Dwarka, New Delhi - 110075
File. No 13057/01/2022/IT
CIRCULAR
Sub.: Hands-on workshop on updating, validating, and certifying data on Data Lake for
PDs, ROs and GM (HQ) - scheduled from 3rd – 7th July 2023

Ref:
1. OM 15037/01/2021/IT dated 17-09-2021 and 14.12.2022 – Prescribing mandatory
Requirement for all PDs and GM (Tech)-HQ to keep all information updated in Data
Lake Portal and if due to any inconsistencies / incompleteness / wrong input etc., any
embarrassment is brought to NHAI or any privilege motion is brought against Ministry /
NHAI, the concerned user / officer will be help personally responsible.

2. OM 15037/01/2021/IT dated 06.07.2022 – Designating GM (HQ) and RO as Nodal


Information In-charge for authenticating and validating the information uploaded on Data Lake.

With reference to the above, it is once again reiterated importance of completeness and
correctness of data which is being uploaded and certified by the users on Data Lake as it is
being used for reporting and monitoring at various levels in the government. This data, if not
complete or updated may portray a fallacious picture / bring embarrassment for NHAI.

2. Secretary RT&H is also now conducting SoM wherein information from Data Lake
portal is directly taken by M/o RTH officers for agenda and discussions. In addition,
forthcoming monsoon session of Parliament is also scheduled in the 4th week of July 2023
therefore readiness of information in Data Lake for preparing replies to the PQs by the
concerned Divisions is absolutely necessary. Hence, it is once again requested that all officers
must take ownership of their data certified by them on Data Lake.

2.1 To facilitate above, IT-Div will be conducting hands-on workshops across different levels
of the organization from 3rd – 7th July 2023. The agenda of this workshop will be to explain
the key attributes and certifications which are required to be done on the portal by the
officers by 7th calendar day of each month. How to check current data and ways to update
and certify. How to see how many projects are certified and on what date, etc.

2.2 The data attributes which are currently being certified on Data Lake at the PD, RO and
GM (Tech)-HQ level is enclosed as Annexure-1 along with the frequency for update
required. The schedule for the various batches of workshop dedicated for PDs / ROs, and
GMs at Hq is also enclosed as Annexure-2. All officers are requested to bring their official
laptop during the workshop and also associate their Data Lake operators with them.
- -2-

2.3 Lastly, as per instructions dated 11.05.2023 by the Chairman NHAI, all CGMs (Tech) and
GM (Tech) – HQ are requested to regularly conduct monthly review meetings with their
ROs and PIUs on Data Lake. Minutes of the meeting are also to be uploaded on Data Lake
itself.

Digitally signed by
Encl: As above DEEPAK SAXENA
Date: 2023.06.28
17:25:34 +05'30'
(Deepak Saxena)
I/c CGM (IT)
To,
All ROs, All GM(Tech) -Hq and All PDs

Copy for information to:


1. All CGMs (Tech) at Hq
2. PPS to all Members
3. PPS to Chairman, NHAI

Copy also for necessary action to:


1. Data Lake Team – Project Manager – Kind Att. Sh Ram Singh.
2. Sh. Pranjal Gupta – Joint Advisor Product Manager; IT PMU
Annexure 1

Cer fica ons Done by the GM on Data Lake

S.No. Category Cer fying Data Timeline / Frequency of Cer fica on


1 1st Stage Approval Status, Date
2 Tentative LA Cost
3 Appraisal / Pre - Appraisal of Projects Tentative Project Cost
(1st Stage Appraisal by LA Committee
4 Completed) Tentative Capital Cost
5 IRR and PCU / Traffic Details
6 Project Viability, Viability Gap Amount and Proposed Actions for Gap
7 Pre Appraised By
8 Status of Appraisal
9 Date of Appraisal (Likely / Actual)
10 Bid Stage
11 Bid to be Invited / Reinvited
Appraisal / Pre - Appraisal of Projects
12 Bid Invitation Date (Likely / Actual)
(2nd Stage Appraisal Completed)
13 Tender Published (Likely / Actual)
14 Tender ID
15 Bid Due Date (Likely), Bid Received Date Actual
16 Approval of Competent Authority
Monthly (1st to 7th of Every Month)
17 IAC / PATSC Appraisal Note and Saction Letter Upload
18 Awarded (Yes/No)
19 Likely Award Date / Actual Award Date
20 LoA Upload
21 Work Award Details (Regular Civil Work) Awarded Cost (Rs Cr), Estimated Cost (Rs Cr)
22 Quote by L2 Bidder Cost (Rs Cr)
23 % Age (+/-) above or below the Estimated Cost (Rs Cr)
24 Construction Period (Days)
25 Agreement Date (Actual/Likely)
26 Agreement Signing for Awarded Projects Agreement Upload
27 Remarks/ Issues/ Hindrances
28 Financial Closure Date (Actual/Likely)
Financial Closure for Awarded Projects
29 Financial Closure Document Upload
30 Appointed/ Commencement Date (Actual/Likely)
31 Issue Appointed Date for Awarded Projects Scheduled Completion Date (As per contract)
32 Appointed Date Letter Upload
Cer fica ons Done by the RO on Data Lake

S.No. Category Cer fying Data Timeline / Frequency


1 Total Length of NHs in the State
2 Total Length of NHs entrusted to NHAI
Length Entrusted to RO Other roads with NHAI /Reaches taken over by NHAI where entrustment not done:
3 Project is yet to be awarded / Completed Projects transferred to NHAI for tolling / Other
Reaches taken over for maintenance etc.
4 Hindrance of Project Hindrances Details, Target to Resolve, Remarks
5 Month Wise target for issuing CC of the projects & Achievement
6 Certification of Data Filled by PD Month wise/Project wise Construction Target and Achievement
7 Month wise Target and Achievement for Appointed Dates
Monthly (1st to 7th of Every Month)
8 Total Number of Existing Plants at Site Till Date
9 Number of Geotagged Plants Till Date
10 Total Number of Projects
11 Geotagging of Plantation Number of Projects Where 100% Compliance made as per CA
12 Total Number of Man-months of Senior Horticulture Expert Paid in Last 4 Months
13 Number of YHS Mobilized/Approved
14 Number of Project Updated During Month
15 Project Award (Non - Regular Works) Likely / Actual Award Date, LoA Generation
Ad-hoc Basis
16 Agreement Signing for Awarded Projects Likely / Actual Agreement Date
Cer fica ons Done by the PD on Data Lake

S.No. Category Sub - Category Cer fying Data Timeline / Frequency of Cer fica on
1 DPR Milestones Milestones for DPR Deliverables
2 LA Details Land Required, Land Acquired, Status of 3A / 3D / 3G / 3H
3 Encumberence Free Land Handed over to the Concessionaire
Encumberence Free Land
4 Balance Length to be Handed Over
5 Clearances Type of Clearance, Clearance Status, Due Date of Resolution
6 Details of Utility Shifting, Department / Division
7 Commencement Date, Due Date
Utility Shifting
8 Physical and Financial Progress of Utility Shifting
9 Expenditure Sanction and Incurred
10 Construction Milestones Reason for Burst of Milestone
Upda ng Project Details
11 Construction Progress Construction Progress for the Month
(Balance For Award, Under Monthly (1st to 7th of Every Month)
12 Implementa on, O&M) S - Curve (Physical) S - Curve Details
13 S - Curve (Financial) S - Curve Details
Revision of Project Length (Descoping /
14 Reason for Change, Affected Length, Value of Descoped Work
+ve COS)
15 Provisional / Final Completion Likely / Actual PCOD and COD Date
16 Drone Scheduling Agency, Target Date for Drone Survey
17 Critical Issue Issue Description, Type, Authority, Disposal Due Date
18 Disposal of AE/IE MPR Disposal of AE/IE MPR
Additional Length Constructed Except
19 Additional Length Constructed Except Service Road
Service Road
Number of Ambulances Deployed, Number of Calls Received /
20 Utilization of Ambulance
Attended
Construction Progress for Under
21 Construction Progress Weekly Update of Construction Progress Weekly
Implementation Projects
Number of Plants as per CA (LHS / RHS / Median), IRC, Site
22 Green Highway Plantation Monitoring Form
Survey
23 Details for Foundation Stone Laying Date, Venue, Dignitary Names
Monthly (1st to 7th of Every Month)
Foundation Stone Laying and
24 Inauguration Technical Features Number of Bus Bays, Major Bridges, Minor Bridges
25 Toll Notification Toll Notification New Toll Plaza Details, Location, Stretch As and when needed
Annexure 2(a): Schedule for PIUs under Following ROs

S.No. Region Offices of NHAI (PIUs under ROs) Slots Day Date Time Mode
RO-Gandhinagar, RO-Mumbai, RO-Bengaluru, RO-Vijayawada, RO-Chennai, RO-
South &
1 Jabalpur, RO-Bhubaneswar, RO-Nagpur, RO-Hyderabad, RO-Madurai, RO- Slot 1 Monday 03.07.2023 03:00 -05:00 Online
West
Thiruvananthapuram

RO-Delhi, RO-Jaipur, RO-Bhopal, RO-Chandigarh (HR), RO-Chandigarh (PB), RO-Jammu,


North &
2 RO-UP West, RO-Kolkata, RO-UP East, RO-Patna, RO-Ranchi, RO-Guwahati, RO-Raipur, Slot 2 Tuesday 04.07.2023 03:00 -05:00 Online
East
RO-Dehradun, RO-Shimla

Additional session for those PDs who somehow could not attend slot 1/2, and/or have specific
3 Slot 3 Wednesday 05.07.2023 03:00 -05:00 Online
queries.
Annexure 2(b): Schedule for ROs

S.No. Region Offices of NHAI (ROs) Slots Day Date Time Mode

RO-Gandhinagar, RO-Mumbai, RO-Bengaluru, RO-Vijayawada, RO-Chennai, RO-


South &
1 Jabalpur, RO-Bhubaneswar, RO-Nagpur, RO-Hyderabad, RO-Madurai, RO- Slot 1 Thursday 06.07.2023 11:00 - 12:00 Online
West
Thiruvananthapuram

RO-Delhi, RO-Jaipur, RO-Bhopal, RO-Chandigarh (HR), RO-Chandigarh (PB), RO-


North &
2 Jammu,RO-UP West, RO-Kolkata, RO-UP East, RO-Patna, RO-Ranchi, RO- Slot 2 Thursday 06.07.2023 03:00 - 04:00 Online
East
Guwahati, RO-Raipur, RO-Dehradun, RO-Shimla
Annexure 2(c): Schedule for GMs of the following ROs

S.No. Region Offices of NHAI (GMs of following ROs) Slots Day Date Time Mode

RO-Gandhinagar, RO-Mumbai, RO-Bengaluru, RO-Vijayawada, RO-Chennai, RO-


South & Offline at
1 Jabalpur, RO-Bhubaneswar, RO-Nagpur, RO-Hyderabad, RO-Madurai, RO- Slot 1 Friday 07.07.2023 11:00 - 12:00
West HQ
Thiruvananthapuram

RO-Delhi, RO-Jaipur, RO-Bhopal, RO-Chandigarh (HR), RO-Chandigarh (PB), RO-


North & Offline at
2 Jammu,RO-UP West, RO-Kolkata, RO-UP East, RO-Patna, RO-Ranchi, RO- Slot 2 Friday 07.07.2023 03:00 - 04:00
East HQ
Guwahati, RO-Raipur, RO-Dehradun, RO-Shimla

You might also like