MINUTES OF MEETING

Date: 23 Nov 2023 Reference No:01


Project Name: King Salman Airbase Project (KSAP) Dirab, Riyadh, TSE line and tie in
Agenda: Coordination meeting
Moderator: Eng. Bassel Al-Rifai
Location: NASJV site office

Attendees Name from MTCO Position Attendees Name from NASJV Position

Acting
Ahmed massada representative
Roy Yazigi
as project
manager
Site
Abdulatti Alsayed engineer Medhat Saad aldin
Ahmed Haggag Mech. engineer Bassel Al-Rifai Project Manager
Hisham hamdan T.O. manager

Action Action
Points Discussed Remarks
By: Date:
An authorization letter shall be issued as per MTCO letter
1445/MTCO/153 issued on 20-11-2023 – Attached- to coordinate with NASJV 27-11-23
the related stalk holders.
MTCO shall be notified about the material approvals status and the
NASJV 28-11-23
hydraulic calculations report.
MTCO shall submit a proposed shop drawing compiling to the
discussed chambers arrangement ,NWC guidelines and applicable MTCO 27-11-23
routing to have the consultant`s approval first then NWC approval will
be secured either by the consultant “If applicable” or by MTCO.
The chambers arrangement will be as follows :
1-Air valve chamber at the beginning of the line respecting the line
profile. MTCO-
2-Gate valve chamber after 5 meters. NASJV
3-Flow meter chamber just outside the project`s fence.
4-Flow control valve chamber inside the project`s fence.
A trial bit to confirm the feeder pipe diameter and level will be the first
MTCO -
task for MTCO once they secured the related approvals
The material purchasing process will start directly after the approvals
MTCO- -
of material submittals and shop drawing by (SIO/NWC) and the
NASJV
consultant
NASJV confirmed that the previously shared MOM dated 21-10-2022 -
NASJV
with SIO is the last MOM regarding this project.
As per the latest coordination cycle with NWC/SIO the branch pipe
-
diameter will be DI DN250 according to the design flow of 3000 NASJV
m3/day, max. velocity of .7 m/s and all fitting swill be PN16.
Eng Mohammed al faqih as the project manager will be MTCO`s -
MTCO INFO
contact person in any future communications
NASJV offered it`s assistance with any available data to facilitate NASJV - INFO
MTCO`s work
NASJV MTCO
Eng. Bassel Al-Rifai Eng. Mohammed al faqih
Project Manager Projects Manager
Signature: Signature:
Date: 25/Nov/2023 Date: 25/Nov/2023