Generally, we are following the process of Procure to Pay cycle while ordering
any material i.e Raw, Spare, Consumable etc.
But in some case we required the material on urgent basis we have no time for
any PO creation before Goods Receipt or Any critical condition we required
some material without any reference PO.
SAP has maintained some configuration for this critical or urgent situation.
For this case while we do Goods Receipt of Ordered material with reference to
PO. At that time, we have the option of adding a non-ordered material in
goods receipt.
Below is the process of Auto PO while doing Goods Receipt for Non-Ordered
Material.
Step: - 1
Create a Standard Material by using T-Code: -MM01
1]Ordering Material in Purchase Order
Step: -3
Create Standard PO by using T-Code: -ME21N for ordered
material i.e 100000000000040066
Step: -4
Do the Goods Receipt by using T-Code: - MIGO
After entering PO no, it will fetch the data from of ordered material only
for Goods Receipt.
Step: -5
For this error we do some configuration in system as below
First Configuration
1] Activating the Auto PO for 101 Movement
Path to Activate Auto PO for Movement: -
SPRO->IMG-> Materials Management-> Inventory Management and Physical
Inventory-> Goods Receipt-> Create Purchase Order Automatically
Step: -6
Check the stock of Non-Ordered Material in system by using T-
Code: -MMBE
System will Display the Auto PO. It will look like same as we create PO
Manually.