Project : Demolition phase III

Project No. : SDC-LOA-23-006


Document Type : Risk Assessment Method Statement (RAMS)
Description of work Activities : Risk Assessment Method Statement for Demolition of Substation and Workshop
Document No. : SP3-SCC-SDW-DEM-RAMST-000013 Rev 00
Supervision Consultant: Contractor:

EALTH SAFETY & ENVIRONMENT DEPARTMENT RISK ASSESSMENT

S = Severity Rating L = Likelihood R = Risk Rating

30 – 36 LOCATION: Chillers Yard


0- NO INJURY OR ILLNESS 0- ZERO TO VERY LOW Intolerable
20 – 25 High High ASSESSED BY: Mohammed Irshad
1- FIRST AID INJURY OR 1- VERY UNLIKELY
ILLNESS

15 – 18
2- MINOR INJURY OR ILLNESS 2- UNLIKELY Substantial
Medium DATE OF ASSESSMENT 02/08/2023
3- 3DAYS, INJURY OR ILLNESS 3- LIKELY 12 Moderate

8 – 10 Tolerable
4- MAJOR INJURY OR ILLNESS 4- VERY LIKELY REVIEW DATE: Quarterly

Low
5- FATALITY, DISABLING 5- ALMOST CERTAIN 1 – 6 Trivial
INJURY SIGNATURE: Rev: 00 (Signoff on reviewal date
06.08.2023)
Activity: Demolition of Chillers Yard Risk and Hazard

NOTE –
1- PLEASE ENSURE WITH YOUR SUPERVISOR PRIOR START THE WORK WEAR APPROPERIATE PPE OF RELATED TASK
2- HOME-MADE TOOLS ARE PROHABITED
3- DAILY TBT MUST CONDUCT ACCORDING TO THE TASK PRIOR TO START THE WORK.
4- PPE IS EQUIPMENT WORN TO MINIMIZE EXPOSER TO HAZARDS.
5- EXAMPLE OF PPE INCLUDES GLOVES, SAFETY GLASSES, HEARING PROTECTION, HARD HAT, AND RESPIRATORY SYSTEM.
Project : Demolition phase III
Project No. : SDC-LOA-23-006
Document Type : Risk Assessment Method Statement (RAMS)
Description of work Activities : Risk Assessment Method Statement for Demolition of Substation and Workshop
Document No. : SP3-SCC-SDW-DEM-RAMST-000013 Rev 00
Supervision Consultant: Contractor:

S. DESCRIPTION OF WORK HAZARDS Possible Responsible

RISK Rating
LIKELIHOO

LIKELIHOO
SEVERITY

SEVERITY

RATING
No SEQUENCE Affects / CONTROLS & MITIGATION personal

RISK
Harm MEASURES TO REDUCE THE RISK

01 Description of Tools and main Improper handling Workers Physical 4 4 16 Prior start the work conducted TBT related to 4 2 8 Site
access to safe /working location Uninspected tools, Injury due to using for below topic. Supervisor/Site
Damage Tools, Entry of improper tools, Safety Officer
to unauthorized Using of Damage Topic of TBT
operation of existing tools, Slip and trip Wear Appropriate PPE.
facilities. physical injury due Using of temporary structures
to uninspected Using of Standard Tools.
Deploy Authorized Workers.
Proper Supervision from execution team.

Use of the right/certified/stander tools


Use appropriate PPE. Make sure the five
Points of PPE's.
1-Hard hat.
2-Safety shoes.
3-Safety glasses
4-Safety vest
5-Hand gloves.

Damage tools and broken tools shall not


allowed the work forece.
All the equipment’s must be inspected and
having sticker on it.
HSE Person must conduct mobilization
inspection outside the entrance.
All the tools which are going to use with this
activity shell be inspected and having color
code on it.
Damage broken and homemade tools are not
allowed to use.
Power tools hand tools must be kept and
Project : Demolition phase III
Project No. : SDC-LOA-23-006
Document Type : Risk Assessment Method Statement (RAMS)
Description of work Activities : Risk Assessment Method Statement for Demolition of Substation and Workshop
Document No. : SP3-SCC-SDW-DEM-RAMST-000013 Rev 00
Supervision Consultant: Contractor:

store at storage area.


To each and every employee, do not touch
operate enter and open any existing facilities.
Ensure that dust shall not accumulated
existing facilities.
All people working inside the premises
should know the emergency procedure.
Everyone must know the emergency
assembly point and emergency contact
numbers.
Everyone knows the first aider location of
first aid kit location supervisor has to
communicate and instruct the workers how
to respond in case of emergency.
Awareness of fire points and ERT members
numbers list posted at site.
ER team must be proactive and available at
site.

02 Mechanical Demolition with Moving Plant / Unsuitable, 5 4 20 Make sure the excavator is parked in 5 3 15 Site Supervisor
the help of excavators Vehicles Unsafe, poorly designated area as per layout. 360- Site Engineer /
Crushed / maintained degree clearance, inspection done prior Safety Supervisor
Entrapment equipment to start up. Only authorised person
Dust Untrained enters the construction demolition zone.
Noise Operators (or) Operation area is full isolated. Flagman
Etc. Banks man. will be deployed for demolition activities.
Use of the right/certified/standard
equipment.
Maintaining equipment correctly
Restricting use of equipment to trained,
competent persons, Checking of
equipment before use
Checking of equipment certification. Only
Project : Demolition phase III
Project No. : SDC-LOA-23-006
Document Type : Risk Assessment Method Statement (RAMS)
Description of work Activities : Risk Assessment Method Statement for Demolition of Substation and Workshop
Document No. : SP3-SCC-SDW-DEM-RAMST-000013 Rev 00
Supervision Consultant: Contractor:

competent person will operate the


equipment’s. Use appropriate PPE. Wear
proper hearing protection.
03 General activities inside the Poor visibilities, Electric shock 5 4 20 All the MEP supplies full closed from the 5 3 15 Electrician /
building, improper causes death, main source. Electrical, mechanical, and Plumbers /Site
ventilation, severe burn. plumbing disconnection will be by competent engineer /Safety
Slip, trip, Electrical and trained persons.use the right tools for Supervisor
the right job,hands & power tool should be
Shock, Injuries,
inspected , Unauthorized persons are not
Physical Burns, Fire allowed to work on electrical supplies. Wear
Dust, pinch points, appropriate PPE. Put relevant safety
Sharp edges, signage’s prior to start up. Supervision
lone working consultant will double check prior to start up.
Firefighting system will be available to handle
the fire. Trained/competent fire fighters will
extinguish the fire.Ventilation should be
properly , use proper light in noon visible
area, activies should be according to methed
statement, single worker not allowed should
be atleast tow workers must involve in
activity.
04 Manual Handling Improper lifting Physical Harm 4 3 12 Use mechanical aids were possible – 4 2 8 Site supervisor
tackles, Back pain due to cranes, forklifts, trolleys, wheelbarrows
Overstraining, heavy load of lift etc. Use appropriate Body posture when
Slips Trips Falls lifting materials – straight back and lift
Muscular Skeletal with your legs.
Injury. -Two or more-person lifting shall be
utilized whenever possible and Conduct
Training for do the safe procedure of
work.
05 General Earthwork’s Dust, Equipment, vehicle Hand foot injury 5 4 20 Spotters to be use 5 2 10 Civil Engineer
Fumes & Gases & pedestrian inter- Working near Speed limit Monitoring of critical /Safety
action Personal heavy equipment activities by Supervisor
injury Worker supervisor’s Correct manual handling
Project : Demolition phase III
Project No. : SDC-LOA-23-006
Document Type : Risk Assessment Method Statement (RAMS)
Description of work Activities : Risk Assessment Method Statement for Demolition of Substation and Workshop
Document No. : SP3-SCC-SDW-DEM-RAMST-000013 Rev 00
Supervision Consultant: Contractor:

Visitors & public Movement Visual contact between operator and


Dust Compaction & without ground crew. Provide pedestrian roots
vibration Irritation pedestrian and get separate from equipment
& respiratory Effected lungs operation.
problems, Problem Constant supervision arranges the water
Skin diseases tank for spray the water for dust control.
Wear correct PPE like dust mask
Equipment inspected and good
conditions have back up alarm.
06 Demolition of the Substation Trip, slip, fall Visitors, workers 5 4 20 A competent supervisor must 4 2 8 Civil Engineer,
and workshop. Overexposed to who involve in the monitor the working area to Site Supervisor/
ensure that the proper
vibration. activity of Safety Supervisor
procedure of demolition is
Dust generated demolition work. followed as mentioned in MS
during Site Staff. Full-body Harness must be
Demolition. worn by the worker, where
there is a tendency of falling
From height.
Suitable PPE likes eg - safety shoes, high
visibility west, safety googles
safety gloves to be worn by
Workers.
Dust masks are to be provided
for the workers who involved in the
Activity.
Worker’s handling
Hilti/Jackhammers must be
given ample time to recover
from the impact of this
Equipment.
07 Traffic Circulation on the Job Weather Condition Slow down the 4 3 12 All drivers and operators must be 4 2 8 Traffic Controller
site. Vehicle Inspection speed in bad following the site safety rolls and speed man
Road Condition weather, fog, or in limit. All drivers have Saudi government And flag man
Collision of sandstorm. license Access roads clear from any
equipment Only the obstruction
Project : Demolition phase III
Project No. : SDC-LOA-23-006
Document Type : Risk Assessment Method Statement (RAMS)
Description of work Activities : Risk Assessment Method Statement for Demolition of Substation and Workshop
Document No. : SP3-SCC-SDW-DEM-RAMST-000013 Rev 00
Supervision Consultant: Contractor:

inspected vehicles Display speed limit and driving guidelines


can enter the site. signs
The road is not Provide double way road and control the
level of ground traffic Monitor weather condition.
are not flagman will be provided for both ends to
compacted. control the traffic. Cautions signages will
One-way traffic be provided for both ends and cones will
Body injury be placed at affected area/zone.
08 House Keeping Untidy site racemes Trip, slip fall hand 2 2 4 Good housekeeping in the site can 2 1 2 Area supervisor
hazards resulting foot injury Traffic eliminate many of situations where a fire and safety officer
slip, Unwanted blocks / Egress can start. Waste should move at interval
material Poor of storage and always at the end of working day.
Trash can and metals bin with close
fitting ups.

09 Protective measures for Injuries Enter to jobsite 2 2 4 The use of PPE like helmet, hand gloves, 2 1 2 Safety officer
general work Un fitted PPE without PPE safety shoes, earmuffs, and eye
protection. The use of basic personal
equipment depending on the type of
work which will be performed.
Use the appropriate PPE that is correct
type and fitted
10 Disconnection of utilities, MEP Electrical shock, Electric shock, 4 4 16 Make sure all the MEP supplies full 4 2 8 Electrician/
Injuries, Physical Causes of death, closed from the man source. Electrical, Plumbers/site
Burns, Fire ,poor Severe burn. mechanical and plumbing engineer/safety
Poor visibility disconnection will be by competent supervisors
and trained persons.
Unauthorized persons are not allowed
to work on electrical supplies. Wear
appropriate PPE. Put relevant safety
signage’s prior to start up. Firefighting
system will be available to handle the
Project : Demolition phase III
Project No. : SDC-LOA-23-006
Document Type : Risk Assessment Method Statement (RAMS)
Description of work Activities : Risk Assessment Method Statement for Demolition of Substation and Workshop
Document No. : SP3-SCC-SDW-DEM-RAMST-000013 Rev 00
Supervision Consultant: Contractor:

fire.
Trained /competent firefighting will
extinguisher. During work in poor
visible are should be proper light ,
11 Noise Pollution Effected of Workers, 4 3 12 Supervisor Must be ensure workers 4 1 4 Safety officer
Eardrums, Visitors, should be wear appropriate PPE for
Damage of ears, Site Staff, related task eg- Ear Muffs.
fatigue, anger Neighbor’s, Noise is to be controlled and reduced to
and aggression, as low as is reasonably practical through
Affected of Blood the careful selection of plants and
presser, method of demolition.
When noise is believed to be above 80
DBA (i.e. when you have to raise your
voice to be heard two meters away).
Appropriate hearing protection to be
issued and worn.
Provide information, instruction, and
supervision on when and how to
correctly use hearing protection
Daily bases check the sound level meter
and maintain the record.

12 First aid care on site Incorrect diagnosis, Not implementing 2 2 4 Certified first aider will be available to 2 1 2 Safety
serious injury, the HSE procedures handle any first aid case. First aid kit will officer/First aider
and instruction be available on the site.
In future:
Deploy First aider / paramedic/Nurse
Clinic for providing first aid treatment and
one ambulance for handling emergency
case.
First aider Maintain the records of first aid
cases.
Project : Demolition phase III
Project No. : SDC-LOA-23-006
Document Type : Risk Assessment Method Statement (RAMS)
Description of work Activities : Risk Assessment Method Statement for Demolition of Substation and Workshop
Document No. : SP3-SCC-SDW-DEM-RAMST-000013 Rev 00
Supervision Consultant: Contractor:

13 Demolition of Chillers Yard Trip, slip, fall Visitors, workers 3 2 6 A competent supervisor must 3 1 3 Safety officer
Overexposed to who involve in the monitor the working area to
ensure that the proper
vibration. activity of
procedure of demolition is
Dust generated demolition work, followed as mentioned in MS
during Site Staff, Full-body Harness must be
Demolition. worn by the worker, where
there is a tendency of falling
From height.
Suitable PPE likes eg - safety shoes, high
visibility west, safety googles
safety gloves to be worn by
Workers.
Dust masks are to be provided
for the workers who involved in the
Activity.
Worker’s handling
Hilti/Jackhammers must be
given ample time to recover
from the impact of this
Equipment.

14 Security Provisions Car accident Lack of fencing 2 2 4 Perimeter fence provision 2 1 2 Safety officer
Property damage Absence of Controlled access gate provision for
Entrance of security personnel vehicles
unauthorized Unofficial access Controlled access gate provision for
personnel
gate. pedestrians
Theft of tools,
equipment, and Missing Proper Traffic signage
materials pedestrian gate Pedestrian route

15 Dust Pollution Respiratory Workers health 12 Spray Water periodically to avoid dust
Problems, Poor issues, Illness, 4 3 pollution. 4 1 4
Project : Demolition phase III
Project No. : SDC-LOA-23-006
Document Type : Risk Assessment Method Statement (RAMS)
Description of work Activities : Risk Assessment Method Statement for Demolition of Substation and Workshop
Document No. : SP3-SCC-SDW-DEM-RAMST-000013 Rev 00
Supervision Consultant: Contractor:

Visibility, Lungs Supervisor Make sure to Wear


Dieses, Skin Elergy, Appropriate PPE for workers on related
Rashes, task.
Provide dust mask to Labors as per the
requirement
Provide Goggles to laborers as per the
requirement.
Prior Start the work conducted Daily TBT
Consequence
for workers on related task.
Probability Conducted Awareness trainings to avoid
Insignificant (1) Minor (2) such kind
Moderate (3) of substances Hazardous.
Major (4) Catastrophic (5)
Do the housekeeping on regular bases.
Rare (1) 1 2 3 4 5

Possible (2) 2 4 6 8 10

Likely (3) 3 6 9 12 15

Often (4) 4 8 12 16 20

Frequent/Almost Certain (5) 5 10 15 20 25

15 - 25 Extreme Risk Activity or Industry Should Not Proceed in Current Form

Activity or Industry should be modified to include remedial planning and action and be subject to detailed OSH
8 - 12 High Risk
Assessment

1-3 Low Risk No Action Required Unless Escalation of Risk is Possible