Fig 1 -Transportation of CVC Plant Component by Trailer

FIg 2- Unloading of CVC Plant component

Fig3– Installation of CVC Plant component

Planned
No. Title Duty
Number
1 Engineer 1 Site manager
2 Foreman 1 Construction manager
3 Equipment operator 2 Lifting batching plant & silos
4 Skilled Worker 4 Setting, cutting and welding.
5 Surveyor 1 Survey chief
6 Assistant Surveyor 1 Survey assistant
7 Mechanic 1 Maintenance of equipment
8 Electric Technical 1 Setting and Electrical connector System
9 E&M Staff for Installation Installation of electrical systems and
3 operating systems, calibration and
calibration system weight materials
Total 15
Table 1– Manpower Distribution for Installation Batching Plant.