You are on page 1of 3

THEORITICAL REVIEW

CUSTOMER :-
JOB DESC. : MANUFACTURE NEW SHAFT
QUANTITY : 1 EA
JOB NO. : N/A
SHAFT REPLACEMENT IS CAUSED BY SEVERAL THINGS, I.E :
1. Shaft bent. Refered to API RP-687, the total indicated shaft runout (TIR) of the shaft shall be no more than
25 µm (0.001 in.). In the case of the BFPT ex 3a shaft, a large runout value was found. The data attached below
2. High wear on surface.
3. Indicated crack.

Prepared By : Checked By : Approved By :


PT Sinar Sakti Matra Nusantara PT Sinar Sakti Matra Nusantara PT Sinar Sakti Matra Nusantara

M. Pandu Setiawan Rachmat Busro Rasyid


Date : 18 Desember 2023 Date : 18 Desember 2023 Date :

1
QUALITY CONTROL PLAN

CUSTOMER :-
JOB DESC. : MANUFACTURE NEW SHAFT
QUANTITY : 1 EA
JOB NO. : N/A
NO DESCRIPTION
Manufacture Process :
1. Visual Test.
2. Visual Test.
3. Dimensional Check.
1
4. Run-Out.
5. Material Composition Test use PMI (Positive Material Identification).
6. Hardness Test.
7. Generate incoming drawing (Sketch) base on as received existing shaft.
2 Generate manufacture drawing (CAD) and submit to user to get approval.
3 Order raw material as existing shaft.
Quality check raw material :
1. Material Composition Test.
4 2. Dimensional Check.
3. Material Document.
Manufacture Process :
A. Set up raw material on machine.
B. Roughing machining.
5
C. Machining all grooving and outer diameter of material as per drawing.
D. Milling key way groove as per drawing.
E. Grinding for finishing shaft as per drawing.
6 Perform final inspection dimensional & run out.
7 Perform penetrant test on all visible surface.
8 Record all inspection data and create inspection report.
9 Packaging and delivery.
Prepared By : Checked By : Approved By :
PT Sinar Sakti Matra Nusantara PT Sinar Sakti Matra Nusantara PT Sinar Sakti Matra Nusantara

M. Pandu Setiawan Rachmat Busro Rasyid


Date : 18 Desember 2023 Date : 18 Desember 2023 Date :

2
FLOW CHART
MATERIAL REVERSE ENGINEERING
CUSTOMER :-
JOB DESC. : MANUFACTURE NEW SHAFT
QUANTITY : 1 EA
JOB NO. : N/A

Prepared By : Checked By : Approved By :


PT Sinar Sakti Matra Nusantara PT Sinar Sakti Matra Nusantara PT Sinar Sakti Matra Nusantara

M. Pandu Setiawan Rachmat Busro Rasyid


Date : 18 Desember 2023 Date : 18 Desember 2023 Date :

You might also like