Professional Documents
Culture Documents
CTR003 Jetty 27-11-2023
CTR003 Jetty 27-11-2023
12390-3
Number of Test Report 003
Project MARINE XII (Onshore pipelines OPT/LTJ/GRS)
Contractor ZEROCK CONSTRUCTION CONGO
Origin of Concrete Zerock Concrete Batching Plant in Zakem
Mix Design Trial Mix Control ✘ Information
Temperature weather /
- Size of specimen 160 x 320 mm
concrete
Pouring date 11/27/2023 Slump test at 0' -
Mix Design Code -
Composition Cement Water Sand Gravel 1 Gravel 2 Admixture
Type - - - - - -
Quantity(Kg/m ) 3
- - - - - -
Part of Structure
Footings PIPE SUPPORTS FOUNDATIONS
Name
Signature
Date