Professional Documents
Culture Documents
CTR006 Jetty 09-12-2023
CTR006 Jetty 09-12-2023
12390-3
Number of Test Report 006
Project JETTY EXTENSION AREA
Contractor ZEROCK CONSTRUCTION CONGO
Origin of Concrete Zerock Concrete Batching Plant in Zakem
Mix Design Trial Mix Control ✘ Information
Temperature weather /
- Size of specimen 160 x 320 mm
concrete
Pouring date 12/9/2023 Slump test at 0' -
Mix Design Code -
Composition Cement Water Sand Gravel 1 Gravel 2 Admixture
Type - - - - - -
Quantity(Kg/m3) - - - - - -
Part of Structure
Concrete Piping Support Foundation (Pedestal)
Name
Signature
Date