Bill of Quantities for the Civil Works (Construction of road and fence Intak Site )
Ref Item Description Unit Qty Price US$ Cost US$
Construction of Fence
A Site preparation:
Supply of materials , manpower, equipment, machinery and all requirements to
carry out the site preparations according to section 200 of the Iraqi GTS and the
Engineer's instructions and as the following:
C Concrete work: -
Plain Concrete Work: -
Supply of materials, manpower, equipment, machinery and all requirements to carry
out the concrete work including form works , casting and curing all according to
section 600 of the Iraqi GTS and the Engineer's instructions and as the following:
E Masonry Work:
1 of 3
Ref Item Description Unit Qty Price US$ Cost US$
Supply of materials ,manpower, equipment, machinery and all requirements to carry
out the masonry work including form works if required and curing all according to
sections 400 and 500 of the Iraqi GTS and the Engineer's instructions and as the
followings:
F Finishing :
Supply of materials ,manpower, equipment, machinery and all requirements to carry
out the best Finishing work including form works if required and curing all
according to sections 700,800, 900 1000,and 1400 of the Iraqi GTS and the
Engineer's instructions and as the followings:
G Metal Work:
Supply of materials ,manpower, equipment, machinery and all requirements to carry
out the best metal work including installation , painting primer and three layers of
oil paint , aluminum handles for the windows, 4 mm glass , heavy duty locks for the
doors and all according to section 1200 of the Iraqi GTS and the Engineer's
instructions and as the followings:
construction of roads
. Clearance of the site, removal of debris
and surplus materials, and all necessary
agricultural soil depth cut and fill
required to the elevation according to the
drawing and instruction of the site
engineer of the project area and sq.m 3500 3 10500
compaction to 95% MDD and cleaning
all the surfaces before and after the
completion of the project.
2 of 3
Ref Item Description Unit Qty Price US$ Cost US$
Provide materails and laying alayer of
subbase type (A ) 20cm and comppact to
95% due to spacefication sq.m 3000 10 30000
Total 192500