WATER SUPPLY PROJECT

Bill of Quantities for the Civil Works (Construction of road and fence Intak Site )
Ref Item Description Unit Qty Price US$ Cost US$
Construction of Fence
A Site preparation:
Supply of materials , manpower, equipment, machinery and all requirements to
carry out the site preparations according to section 200 of the Iraqi GTS and the
Engineer's instructions and as the following:

A-1. Clearance of the site, removal of


debris and surplus materials, and the
necessary agricultural soil depth
between (10-30)cm cut required of the Lump
soil of the whole project area and 1 3000 3000
Sum
cleaning all the surfaces before and after
the completion of the project.

B B-1. Soil excavations for the foundations


in all type of soils from the level of the
prepared site and to any required depth
as directed by the Engineer .The item cu.m 150 10 1500
includes backfilling in compacted layers.

B-2. Earth filling for the required


locations with well compacted selected
material brought from out side the site as
may be required and well compacted in cu.m 100 8 800
25cm layers as instructed by the
Engineer.

C Concrete work: -
Plain Concrete Work: -
Supply of materials, manpower, equipment, machinery and all requirements to carry
out the concrete work including form works , casting and curing all according to
section 600 of the Iraqi GTS and the Engineer's instructions and as the following:

C-1 Plain concrete C20 of 20 cm.


thickness over alayer 10cm of well
compacted bolder stone for foundation cu.m 35 150 5250

C-2 Plain concrete C20 of 10 cm.


thickness for topping of wall . m.l 260 20 5200

E Masonry Work:

1 of 3
Ref Item Description Unit Qty Price US$ Cost US$
Supply of materials ,manpower, equipment, machinery and all requirements to carry
out the masonry work including form works if required and curing all according to
sections 400 and 500 of the Iraqi GTS and the Engineer's instructions and as the
followings:

E-1 Concrete Solid block(15*20*40)cm


wall according to the drawings under cu.m 120 125 15000
D.P.C. using cement mortar (1:3) .
E-2 Concrete solid block(20*20*40)cm
wall according to the drawings above
D.P.C. using cement mortar (1:3) . cu.m 175 130 22750

F Finishing :
Supply of materials ,manpower, equipment, machinery and all requirements to carry
out the best Finishing work including form works if required and curing all
according to sections 700,800, 900 1000,and 1400 of the Iraqi GTS and the
Engineer's instructions and as the followings:

F-1 Internal and external plastering with


white cemente thickness not less than
20 mm using rulers every 600mm. sq.m 1700 10 17000

F-3 Rendering ( pressed Nether ) with


white cement and sand mortar 1:1 and sq.m 1700 5 8500
color as prescribed by the Engineer.

G Metal Work:
Supply of materials ,manpower, equipment, machinery and all requirements to carry
out the best metal work including installation , painting primer and three layers of
oil paint , aluminum handles for the windows, 4 mm glass , heavy duty locks for the
doors and all according to section 1200 of the Iraqi GTS and the Engineer's
instructions and as the followings:

G-1 Steel doors complete with painting


the price includes all requirement
sq.m 50 85 4250
accessories and concrete column.

construction of roads
. Clearance of the site, removal of debris
and surplus materials, and all necessary
agricultural soil depth cut and fill
required to the elevation according to the
drawing and instruction of the site
engineer of the project area and sq.m 3500 3 10500
compaction to 95% MDD and cleaning
all the surfaces before and after the
completion of the project.

2 of 3
Ref Item Description Unit Qty Price US$ Cost US$
Provide materails and laying alayer of
subbase type (A ) 20cm and comppact to
95% due to spacefication sq.m 3000 10 30000

Provide materails and constuct


( kerbeston) the price include excavation
and all plain concrete required due to M.L 400 35 14000
spacefication

Provide materails and laying alyer of


asphalt pavement ( stablieser) 10 cm
thick after compaction . the price sq.m 2500 18 45000
including alyer of tack coat due to road
specefication

plain concrete C20 for appron thiknees


10cm the price include filling of soil and sq.m 650 15 9750
alyer of 10cm broken ston

Total 192500