WATER SUPPLY PROJECT

Bill of Quantities for the Civil Works (Construction of Guard Room)


Ref Item Description Unit Qty Price US$ Cost US$
A Site preparation:
Supply of materials , manpower, equipment, machinery and all requirements to
carry out the site preparations according to section 200 of the Iraqi GTS and the
Engineer's instructions and as the following:

A-1. Clearance of the site, removal of


debris and surplus materials, and the
necessary agricultural soil depth
between (10-30)cm cut required of the Lump
soil of the whole project area and 1 2500 2500
Sum
cleaning all the surfaces before and after
the completion of the project.

B B-1. Soil excavations for the foundations


in all type of soils from the level of the
prepared site and to any required depth
as directed by the Engineer .The item cu.m 35 10 350
includes backfilling in compacted layers.

B-2. Earth filling for the required


locations with well compacted selected
material brought from out side the site as
may be required and well compacted in cu.m 60 8 480
25cm layers as instructed by the
Engineer.

C Concrete work: -
Plain Concrete Work: -
Supply of materials, manpower, equipment, machinery and all requirements to carry
out the concrete work including form works , casting and curing all according to
section 600 of the Iraqi GTS and the Engineer's instructions and as the following:

C-1 Lean concrete of 10 cm. thickness


over alayer 10cm of well compacted sq.m 34 15 510
bolder stone for,footing.
C-2 Plain concrete C20 of 10 cm.
thickness over alayer 10cm of well
compacted bolder stone for,sidewalk
ways &floors( with provision of
expansion joints every 2m whenever
required), including leveling the ground, cu.m 10 150 1500
compacted earth fill and 15x30 cm
concrete key at the edge for the walk
way.

1 of 6
Ref Item Description Unit Qty Price US$ Cost US$
C3 Damp-proof course (DPC)
10cm.thickness using C25 concrete mix . cu.m 1 200 200

D Reinforced Concrete Work: -


Supply of materials , manpower, equipment, machinery and all requirements to
carry out the concrete work including form works , casting and curing all according
to section 600 of the Iraqi GTS and the Engineer's instructions and as the
followings: Note
that: Grade C30 concrete must have a minimum Cube strength of 30 Mpa, cement
content 400kg/m3. Grade C25 concrete must have a minimum Cube strength of 25
Mpa, cement content 350 kg/m3.

D-1 Reinforced concrete Grade C20 for


the foundations . cu.m 14 300 4200

D-2 Reinforced concrete Grade C20 for


the Slabs,beams, lintels & Columns. cu.m 18 350 6300
E Masonry Work:
Supply of materials ,manpower, equipment, machinery and all requirements to carry
out the masonry work including form works if required and curing all according to
sections 400 and 500 of the Iraqi GTS and the Engineer's instructions and as the
followings:

E-3 Concrete solid block(15*20*40)cm


wall according to the drawings under cu.m 16 125 2000
D.P.C. using cement mortar (1:3).
E-3 Concrete hollow block(20*20*40)cm
wall according to the drawings above
D.P.C. using cement mortar (1:3) . cu.m 25 140 3500

E-4Concrete block parapet using


block(12*20*40)cm for the operator cu.m 2.5 150 375
house.
F Finishing :
Supply of materials ,manpower, equipment, machinery and all requirements to carry
out the best Finishing work including form works if required and curing all
according to sections 700,800, 900 1000,and 1400 of the Iraqi GTS and the
Engineer's instructions and as the followings:

F-1 Internal plastering with white gypsum


thickness not less than 25 mm using sq.m 110 10 1100
rulers every 600mm.
F-2 External or internal plastering with
cement sand mortar 1:3 thickness not sq.m 175 10 1750
less than 20mm using straight rulers.
F-3 Rendering ( pressed Nether ) with
white cement and sand mortar 1:1 and sq.m 175 5 875
color as prescribed by the Engineer.

2 of 6
Ref Item Description Unit Qty Price US$ Cost US$
F-4 Emulsion paint, two layers for the
interior walls color as prescribed by the sq.m 110 3 330
Engineer.
F-5 Flooring with 40*40 cm mosaic tiles
and 1:4 cement sand mortar including
polishing at site after the completion of sq.m 60 25 1500
the whole work.

F-6 Skirting with 10 cm height ceramic


m.l 30 15 450
tiles.
F-7 False ceilling Using acoustic
(50*50)cm pannels best quality 2.5 cm sq.m 40 18 720
thick.with all requirements.
F-8 Ceramic tiles and 1:4 cement sand
mortar for walls and floor sq.m 70 30 2100

G Metal Work:
Supply of materials ,manpower, equipment, machinery and all requirements to carry
out the best metal work including installation , painting primer and three layers of
oil paint , aluminum handles for the windows, 4 mm glass , heavy duty locks for the
doors and all according to section 1200 of the Iraqi GTS and the Engineer's
instructions and as the followings:

G-1 Aluminum doors (Complete) with


4mm glass whenever required sq.m 6 120 720
G-2 Aluminum Windows:made from best
quality sections with fixing glass panels sq.m 9 100 900
4mm with steel burglar.
G-3 Supply material and construct
galvanized iron steel stair according to
drawing and instruction of site engineer M.L 5 50 250

H Wooden Work:
supply of materials ,manpower to carry out wooden doors including
installation ,painting,locks for the doors according top the specifications and the
engineer s instruction and as the followings:

H-1 Wooden door of frame (75*150)mm


made from malizian wood and
sheets ,door panel thick 50mm with oil
painting two layers ,best quality locks sq.m 7 150 1050
and all requirements for the operator
house.

J Sanitary Installation:-

3 of 6
Ref Item Description Unit Qty Price US$ Cost US$
Includes provision of best quality of
materials available in the market : (
pipes ,fitting ,
valves ,mixers ,traps ,gullies with cover ,
Supports ,hangers ,fastenersclips ...etc.)
All water pipes should be coated by two
layers of anti -rust paint ( First layer befor
fixing and second layer after fixing ) ,

1.Kitchen Wash basin (sink) with steel


farme made from angle iron 1"x1"
completely painted with a layer of
antirust and three layers of oil paint and
No. 1 150 150
complete accessories ( grill German
product ) with mixer Iran Product , Single
wing , Single basin

2. Wash basin ceramic 50x60cm having


self contained over flow ,first class Iran
Product with mixer and chrome valve
with connecting steel hose pipe, nut and No. 1 100 100
washer complete with supporting
brackets

3. Ceramic W,C latrine with gully,first


class Iran product and high pressure
connecting steel hose pipe with chrom No. 1 85 85
valve with painted flush cistern complete
with all necessary works.

4.Ceramic Shower first class with all


requirements and accessories No. 1 100 100

5. Water taps (1/2") chrom plated first


class No. 4 25 100

6. Water tank (1m3) made of pressed


and (Parched ) galvanized iron sheets
Gage (20)including concrete
pedsetal ,fittings( valves, 2 taps at 10cm
from the bottom of the tank,float valve , No. 1 150 150
wash out valve ) ,hinged cover cap and
all pipe connection .

7. PVC. water pipes :


0

7.1 (1/2") dia, M.L 24 5 120


7.2 (3/4") dia . M.L 12 6 72

4 of 6
Ref Item Description Unit Qty Price US$ Cost US$
8- P.V.C pipes ,including all necessary
excavation ,laying , jointing and
connecting the pipes , providing and
placing concret (1:2:4),10 cm. Thick
under and around the pipes as shown in 0
the drawing . Backfilling with approved
compacted materials ,

8.1 (100mm) dia. ( pressure 6 bar and


3mm thick M.L 6 10 60

8.2 (150mm) dia. ( pressure 6 bar and


3mm thick M.L 8 15 120
8.3 (200mm) dia. ( pressure 6 bar and
5mm thick . M.L 6 20 120

9. PVC. ( 10cm )with all


requirements,fittings for roof rain drain. M.l 9 10 90

10. Providing and installation of 6 Kg.


Fire extiguishers with all required No. 1 150 150
accessories.
11.Construction of manholes size per
drawings for the valves and inspection
manholes the price includes excavation,
casting plain concrete for the
base,conncrete block work
(20*20*40)cm, and cement mortar 1:3,
plastering of the internal and external
walls of the manholes,reinforced
concrete covers, making necessary
connections with pipes, fixing cast iron No. 4 200 800
covers, supported angles with
painting ,steps made from steel bar
20mm dia.@30cm C./C.and back filling
in compacted layers according to the
drawings and instruction of the engineer.

12.Construction of septic tank (4x2x2) m


built from solid concrete blocks and
cement mortar (1:3), reinforced slab
(1:2:4) and plastering inside with cement
No. 1 3000 3000
mortar (1:3) along with a cesspit 1.5m
dia and 4 m depth and provided with a
steel cover (50x 50)cm.

12.Roofing by isogam ,then coverd by


ceramic tile (white color Iranian type) and
1:4 cement sand mortar as shown
according to the darwings of typical sq.m 125 50 6250
roofing sections and instruction of the
engineer.

5 of 6
Ref Item Description Unit Qty Price US$ Cost US$
Total 45127