You are on page 1of 6

See discussions, stats, and author profiles for this publication at: https://www.researchgate.

net/publication/271881243

Gaza’s Water Wells System Based on SCADA

Conference Paper · October 2014

CITATIONS READS
0 759

2 authors, including:

Basil Hamed
Islamic University of Gaza
28 PUBLICATIONS 282 CITATIONS

SEE PROFILE

All content following this page was uploaded by Basil Hamed on 07 February 2015.

The user has requested enhancement of the downloaded file.


ICES5 PROCEEDING-PP. 1-3 GAZA, 4-5 NOVEMBER
2014

Gaza’s Water Wells System Based on SCADA


Basil Hamed and Adham Abu Shamla

Abstract— Gaza city has 21 water wells within a radius of 40 square kilometer that feeds the city with water.
The control of water wells still stays in a manual state and some of these wells are on isolated area. A water
distribution system must be operated properly so that it performs at an acceptable level of service. This paper
describes the application of supervisory control and data acquisition (SCADA) technology on water well control
monitoring system in Gaza-strip. The proposed system is designed to solve the major problems in water
distribution in Gaza city, through solving some weak points such as accuracy and delay in gathering data by
using SCADA, and synchronization between water distribution and electricity existence.

Solving the existing water distribution problem by using INTEGRAXOR SCADA program which is pure
webserver that it doesn’t need any additional programs. Also using programmable logic controller (PLC) to act
as interface between hardware component and software program. In addition controlling via mobile had been
added to the system as a second method

Index Terms— SCADA, Water Wells, PLC, GSM, INTEGRAXOR

I INTRODUCTION
sensor and actuate the different type of actuators. So, it
No one can deny that the world is facing an advance must create a way to connect between these I\O devices
level of technology, today we clearly see that the machines and build an interfacing between these devices and PLC.
are taking the place of the human almost in every kind of
industrial areas, and as the amount of work that need to be The control of water wells in Gaza city still stays in a
done increase the use of the machine will increase more manual state. The taking transporting and supplying of
and more for the purpose of best performance. water can’t be coordinated, the level of automation, the
control accuracy and stability is lower; water plant opera-
Although, there is nothing in any processor in the world tors can’t keep informed of the specific operating parame-
can tack the place of the human mind, and the ability of ters and all kinds of accident information in time. The wa-
human in taking suite decision, machine can only do what ter patrol officers had an intensive labor to carry out in-
had been programmed to do. This will guide us to the fact spections and operations to twenty one wells every day and
that we can’t avoid watching the operation of the machine even through can’t dispatch the water wells in time. In re-
even if we programmed it to do what need to be done ex- sponse to above problem, water well SCADA system is
actly. designed to realize the remote sensing and control of Gaza
city water plant network system[4,5,6].
The control methods are keep improving, recently a
control method called the supervisory control and data
acquisition (SCADA) has been designed [1, 2, 3]. SCADA
II SCADA HARDWARE COMPONENTS
can provide the ability of gathering the data and act as su-
pervisor on the work of Programmable logic Controller The SCADA system is low on system requirements and
(PLC). Programmable Logic Controller (PLC) is consid- easy to implement, which provide the ability of control-
ered the first choice in indutrial control, to control into ling and gathering the required data of the far away pro-
ject, so many benefits will be available [7]. The final re-
———————————————— sult of the proposed project was successful and solved
 Basil Hamed and Adham Abu Shamla are with the Electrical Engineer- the problems of Gaza city water distribution system and
ing Department, Islamic University of Gaza, Gaza, Palestine. improved the efficiency of the water control monitoring.

5th international conference for Engineering and sustinability-Faculty of Engineering-Islamic University Gaza 1
ICES5-2014/ Basil Hamed and Adham Abu Shamla

SCADA system in this paper is used to monitor and control Switches ‫ ـــ‬In SCADA systems need to different types of
an equipment in wells sites and consists of a group of ter- switches to perform the control action that take to solve
minal units such as PLC & its extensions I\O terminals. some urgent problem or to execute some orders.
SCADA collects the data from wells sites and send it to the
base station via communication systems (Internet). These
acquired data are displayed on the master server computer PLC ‫ ـــ‬Programmable Logic Controller, it is considered as
in a base station to supervisor and remote control in all the main control unit or central processing unit in SCADA
wells as shown in Figure 1. systems which are responsible for all logic operations in
wells, and it can be classified as standard or extension units
In SCADA systems there are different levels such as: based on over the evolution of the project in the future, it
also contain a communication ports such as (RS-232, RS-
- Sensors and devices on fieldbus. 485, Ethernet) which considered as the interface between
- Terminal units and programmable logic controller. PLC and client computer or sometimes another
- Communication systems
programmable logic controller device.
- Master server in base station site.
- Client computers in water wells sites.
As we know there are different types of sensor and it return
different types of data such as Analog or digital data, so the
PLC must be able to connect with these different types of
sensors via different types of Terminals such as analog and
digital I\O terminal pins as well counter pins.

Figure 1: SCADA System Component

Sensors ‫ ـــ‬pressure (Low & high) sensor to feedback (as


shown in Figure 2) an indication at specific pressure in
pipeline and another sensors that gathering data measured
to client computer to analysis [8]. It’s resending to the
master server via internet communication systems, today
there are an intelligent electronics devices (IEDs) that
contain a microprocessor and it able to direct connected
with fieldbus then to PLC then to client computer [9]. Figure 3: Programmable Logic Controller Main

A SCADA system gathers information via client computer


that existence in water well site after processing it, such as
low pressure in pipeline case that means there is leakage in
pipeline or that the pump stopped working for some
reason. Then alerts the base station that an error occur in
water well which have an ID (e.g. 27) via internet
communication system (which considered the connection
link between the base station and water wells sites). Then
the base station carrying out the necessary control and
Figure 2: High & Low Pressure Sensors analysis based on information and commands lines that
stored into it or via operator that existence in base
STATION.

5th international conference for Engineering and sustinability-Faculty of Engineering-Islamic University Gaza 2
ICES5-2014/ Basil Hamed and Adham Abu Shamla

es with INTEGRAXOR server [10]. After that all inputs


and outputs that connected with PLC will link with HMI
via INTEGRAXOR server without need to define the driv-
III SCADA SOFTWARE er for each control device to connect if with client comput-
er in each water wells site as shown in Figure 5.
In the previous section SCADA hardware and its
components is presented. Now in this section SCADA
software and how can be connect it with these component
will be explained. First the requirements of SCADA
software is presented:

HMI ‫ ـــ‬Human Machine Interface, which is the interface


between human and machine and it is used to enable the
operator to operating the water well and monitor and
control it from the display as shown in Figure 4.

Figure 5: The Basic Architecture for Link PLC with


Figure 4: The HMI for Water Well INTERGRAXOR Server

Alarm ‫ ـــ‬is one of the basic component of SCADA


software and it is an important for the operator to monitor
As, an example an operator can monitor the water flow
alarms, we add color code for alarm about it emergency
through the pipeline and its pressure, so if low pressure
level on HMI to indicate the operator on the error and its
occurred in the pipeline it will be warn him to fix it.
emergency level on the system and we use Short Message
Service (SMS) as second way if the link between server
Figure 4 is just a picture design by using java script and
and water well site disconnect because some error make
all indications data in this display comes from sensors and
trip hardware.
valves that connected with PLC, so this HMI its job just
display data.
Report ‫ ـــ‬we used a template for report in INTERGAX-
OR program and link it fields with some critical value such
SCADA system means data acquisition and storage it in
as running time and the percentage of chlorine in the water
database with ability to recall this data within certain
and so on.
method like reports and/or graph.

OPC ‫ ـــ‬OLE for Process Control, which stand for Ob-


ject Linking and Embedding (OLE) for process control, IV WATER WELL CONTROL
which is standard communication system was created for a
purpose of coordination transferring data between control A water distribution system, like any large complex sys-
device (PLC) and different water wells. tem, must be operated properly so that it performs at an
acceptable level of service. Many water utilities use human
We used Component Object Model (COM) protocol, operators whose primary function is to monitor the pulse of
which is binary interface it is used to create connection the water distribution system and provide system control
between PLC that have an object that continuously change when needed [11, 12], for that we create different ways of
its data as sensors, measurement device and another devic-

5th international conference for Engineering and sustinability-Faculty of Engineering-Islamic University Gaza 3
ICES5-2014/ Basil Hamed and Adham Abu Shamla

control such as: available in the location of the water well site. This method
is favorite to use manual control because it’s fast and easy,
- Using internet communication systems. all inputs represent by using button and the outputs repre-
- Using Global Service Mobile (GSM). sent by using indication Led as shown in Figure 8.
- Using Manual control

As we talk before we can access to client compute in


water well site from any place by using internet com-
munication systems then make monitoring and control-
ling on all inputs and outputs that connected with con-
trol device (PLC) using HMI pages that upload into
hosting server as shown in Figure 6

Figure 8: Illustration for Manual Control

V. WATER WELL MODEL


Figure 6: Illustration for Controlling via Internet
A demo model is created that looks exactly the same as
the real project, as shown in Figure 9. The mechanical body
Sometimes we can`t access to water well site by us-
and equipment used in the model are described in table 1, as
ing internet communication systems for some reason so,
points refer to the number in Figure 9.
we create another way to control via GSM to contact
with the control device (PLC) that according to the order
sent by the user it will give the suite action as shown in
Figure 7.

Figure 7: Illustration for Controlling via GSM

Figure 9: Water Well Model


Another way is created to control the water well which
is known as the traditional method. The traditional method
is commonly used especially when the operator will be

5th international conference for Engineering and sustinability-Faculty of Engineering-Islamic University Gaza 4
ICES5-2014/ Basil Hamed and Adham Abu Shamla

[3] F. Perez, I. Gomez, J. Luque, G. Sanchez


Component Description “SCADA System Design Alternatives Based on TCP/IP‖”,
Number Study Committee 35, POLAND, October 1999.
1 The MPU which is the PLC. [4] Mini S. Thomas, Parmod Kumar, Vinay K.
Chandna, “Design, Development, and Commissioning of a
2 The client computer which have
Supervisory Control and Data Acquisition (SCADA) La-
INTEGRAXOR software and
boratory for Research and Training‖, IEEE Transactions
interconnected with water well.
On Power Systems”, VOL. 19, NO. 3, August 2004.
3 An antenna symbol indicate the
connection with the internet service. [5] Zolotová, I., Flochová, J., Ocelíková, “Database
Technology and Real Time Industrial Transaction Tech-
4 Water tank needed to wet the shaft of niques in Control‖”, Journal of Cybernetics and Informatics
the vertical pump before starting. pp 18-23, ISSN: 1336-4774, VOL. 5, 2005.

5 Chlorine tank needed to Sterilize the


water. [6] Zhang Feng, Shi Xian-Feng. “Remote Well Moni-
toring and Control System Based on Wireless Data Trans-
6 Generator as a backup power source. mission Technology” [J]. Automation devices, 2008,
29(12): 64-66.
7 Fuel tank.
[7] Di Shuyu, Di Shumei “Water well SCADA sys-
8 The Pump.
tem based on GPRS” 3rd International Conference on In-
9 Low pressure sensor. formation and Financial Engineering IPEDR vol.12 (2011)
IACSIT Press, Singapore
10 High pressure sensor.
[8] Shu, S., 2011, Multi-sensor remote sensing tech-
Table (1) Project Model Component Description nologies in water system management, Procedia Environ-
mental Sciences 10 (PART A), pp. 152-157.

[9] Qiao Zhi, Wang Linli. “Application of Wireless


VI CONCLUSION Transmission Technology in Long-range Communication
Control Process” [J]. Journal of Shijiazhuang Railway In-
SCADA system has been designed to control the 21 water stitute. 2006(6) :87-89
wells of Gaza city. The proposed SCADA system designed
to monitor and control the water wells of Gaza city from [10] Santosh B.Belekar, Abhijit A. Desai, Megharaj
any place has three different ways of control; Manual con- H. Parit, and Anup Dakre ' PLC SCADA based Distribution
trol, GSM, and Internet Connection. The SCADA designed Monitoring & Control' Multidisciplinary Journal of Re-
system has been implanted in real time, and was successful search in Engineering and Technology Volume 1, Issue 1
and will solve the problems of Gaza city water distribution (April 2014) Pg. 105-110
system and will improve the efficiency of the water control
monitoring [11] Chang, K., Gao, J.-L., Yuan, Y.-X., Zhao, H.-B.,
2011, The real time simulation of urban water distribution
network based on OPC communication of SCADA, Harbin
Gongye Daxue Xuebao/Journal of Harbin Institute of
REFERENCES Technology 43 (12), pp. 63-67.
[1] A. Creery, E. J. Byres, “Industrial Cybersecurity
for Power System and SCADA Networks‖”, IEEE Paper [12] Barbosa, R., Sadre, R., Pras, A., 2012, A first look
No. PCIC-2005-DV45. into SCADA network traffic, Proceedings of the 2012 IEEE
Network Operations and Management Symposium, NOMS
[2] M. Mahmud, M. R. Karim, M. M. Islam, K. M. 2012, art. no. 6211945, pp. 518-521.
Rahman, “Supervisory Control and Data Acquisition
(SCADA) Through Internet‖”, Second International Con-
ference on Electrical and Computer Engineering, ICECE
2002, Dhaka, Bangladesh, pp 56-59, ISBN 984-32-0328-3,
26-28 December 2002.

5th international conference for Engineering and sustinability-Faculty of Engineering-Islamic University Gaza 5
View publication stats