Table of Contents

1.Executive Summary…………………………………………...1
2.Project Description………..…………………………………..1-2
2.1 Background…………………………………………………1-2
2.2 Overall Purpose/Objective of the Project…………….....2
2.3 Beneficiaries………………………………………………. 2
3.Project Work Plan………………………………………………2-3
4.Human Resources……………………………………………..3
5.Project Site……………………………………………………...3
6.Project Monitoring………………………………………………3-4
7.Proposed Budget……………………………………………….4
8.Conclusion………………………………………………………4
9.Attachments……………………………………………………..4-6
Project Proposal

ADDITIONAL STREET LIGHTING IN BARANGAY CUANOS


MINGLANILLA CEBU

1.Executive Summary
This project proposal addresses the urgent need for additional street lighting in
Barangay Cuanos, as identified through resident interviews. The absence of
adequate lighting poses safety risks, particularly for those without motorized
transportation, leading to frequent accidents and concerns about crime and
motorcycle accident too. It will be managed by the Barangay Captain, Barangay
Council, and SK in collaboration with the Local Government Unit, the project’s
primary objective is to enhance safety and well-being during night time. It aims to
install additional street lights in high-risk zones, improve visibility, and minimize
crime rates. The beneficiaries include specific streets within Barangay Cuanos.
The project work plan outlines key activities, responsibilities, and a Gantt
chart spanning January to April. Human resources involve collaboration among
SK Councilors, Barangay Councils, and Local Government Units. The project site
includes identified areas in Barangay Cuanos. Project monitoring and progress
reporting mechanisms are detailed, with a proposed budget of ₱241, 170.00
covering materials like street lamps, electrical wires, and cement.
In conclusion, the project’s timely approval and support are crucial to
addressing safety concerns, reducing accidents, and minimizing crime rates in
Barangay Cuanos. The additional street lights in specific areas aims to transform
poorly lit stretches into safer pathways for residents, ensuring a secure
community.
2.Project Description
2.1. Background
Additional street lighting is urgently needed, as highlighted in interviews with
the residents of Barangay Cuanos. The absence of lighting at night poses a
significant danger, particularly for those without motorized transportation.
Motorcycle accidents are frequent due to poor visibility, and residents have
expressed concerns about crimes, including vehicles slowing down and people
making inappropriate remarks. Residents, forced to traverse poorly lit stretches,
navigate with constant fear. Often, their only source of light is the flashlight on
their mobile phones or passing vehicle headlights. Therefore, this project
proposal aims to address these safety issues by introducing more lighting to the
streets. This project will be managed by the Barangay Captain, the Barangay
Council, and the SK (Sanggu1niang Kabataan) in collaboration with the Local
Government Unit.
2.2. Overall Purpose/objective of the Project
The primary objective of this project is to provide additional street lighting in
Barangay Cuanos, enhancing safety and well-being for residents during
nighttime.
It specifically aims to:
 Install additional street lights along identified high-risk zones to
significantly reduce the occurrence of accidents.
 Enhance visibility in poorly lit areas to improve the safety and well-being of
residents.
 Minimize crime rates by strategically placing street lights, deterring
potential criminal activities in the community.
2.3 Beneficiaries
All of the residents of the following Sitio’s:
• Sitio Pugon of Barangay Cuanos
• Sitio Bangga-an of Barangay Cuanos
• Sitio Pitogo of Barangay Cuanos
• Sitio Canluntao of Barangay Cuanos
3. Project Work Plan
GANTT CHART

List of January Febuary March April Responsibility


activities

Entry letter
to the
Baranggay
Canvas and
Purchase of
materials
Start adding
street lights

Project
Monitoring/
1
Assessment
Evaluate
Findings

Turn-over of
the action
plan to the
Barangay

4.Human Resources
This project will be manage by Sk Councilors, Barangay Counsils and Local
government units. They will work collaboratively to ensure effective
implementation. Coordination among these entities is crucial for the project’s
success.
5. Project Site( Geographic, Physical, Virtual, Other)

6.Project Monitoring (Progress Reporting)

Project Name: Reporting


Period:

Stake Holder: Owner:

Project Due
Project Manager Date:
Compiled By: Date Submitted:

7.Proposed Budget
Quantity Item Description Price Total Price
Street Right
5 Anchor Bolts and 516.00 2,805.00
template
Street Lamp with
5 base plate (10ft) 6,900.00 34,500.00
(Single Curve
Arm Design
5 LED Sheed light 3,897.00 19,485.00
Bulb (100w)
50 Electrical Wires 2,400.00 48,000.00
3 sacks Cement 220.00 660.00
Skilled
worker/Man 6 workers 435.00 135,720.00
Power (2 months)
Total: 241,170.00

8.Conclusion
In conclusion, the urgent need for additional street lighting in Barangay
Cuanos, as emphasized by the residents, demands immediate attention. This
project, overseen by the Barangay Captain, Barangay Council, and SK, in
collaboration with the Local Government Unit, is crucial for enhancing safety,
reducing accidents, and minimizing crime rates in key areas. The proposed
installation of street lights in Sitio Pugon, Sitio Bangga-an, Sitio Pitogo, and Sitio
Canluntao aims to transform poorly lit stretches into safer pathways for residents.
We urge prompt approval and support for this initiative to swiftly address the
pressing safety concerns of the community. Together, let us illuminate the way to
a safer and more secure Barangay Cuanos.
9. Attachments
Before
10. References
https://maps.app.goo.gl/3KqQ4qvZgFiXBUzN6
Project Proposal

Submitted by: Group 8


Olivar Yanie
Taniola Levy
Estrada Ricky
Adino Patricia
Juban Nicole Earl
Baculao Christian

Submitted to:
Mr.Ralfh Julius T. Delator