Professional Documents
Culture Documents
(T-AKE 6)
GENERAL REQUIREMENTS RFQ NR.
5 OCTOBER 2012
ITEM NO. 0002 Category “NSP” MSC/PO1B/REV OCT 12
1.0 ABSTRACT
5.0 NOTES:
5.1 The contractor and all subcontractors regardless of tier shall consult the
General Technical Requirements (GTR) item 024, to determine
applicability to this item. In performance of work items in this package,
the contractor and all subcontractors regardless of tier must comply with
the requirements of GTR 024, where specified in an individual work item.
002-1
USNS EARHART
(T-AKE 6)
GENERAL REQUIREMENTS RFQ NR.
5 OCTOBER 2012
ITEM NO. 0002 Category “NSP” MSC/PO1B/REV OCT 12
002-2
USNS EARHART
(T-AKE 6)
GENERAL REQUIREMENTS RFQ NR.
5 OCTOBER 2012
ITEM NO. 0002 Category “NSP” MSC/PO1B/REV OCT 12
002-3
USNS EARHART
(T-AKE 6)
GENERAL REQUIREMENTS RFQ NR.
5 OCTOBER 2012
ITEM NO. 0002 Category “NSP” MSC/PO1B/REV OCT 12
002-4