7.2 The QSD shall review and approve the Inspection and Test Plan and offer to
the Authorized Inspector for his designation of inspection points prior to the
start of work. The AI signs the ITP for acceptance. Revision to the ITP
requires the same procedure of review and acceptance as for the First Issue.
The ITP shall be reviewed for any changes due to drawing revisions. If no
change is required, the review shall be documented in the remarks column of
the ITP.
7.3 The CSD is responsible for work performed on all Code items and is
responsible for conformance with the Shop drawings.
7.4 The TGM releases the job by forwarding the drawings and the ITP to the
concerned Workshop Manager. They are responsible to offer for examination
and Inspection at identified examination/inspection Hold/Witness points.
7.5 The QSD is responsible for keeping the Authorized Inspector informed of
fabrication progress. QSD shall give advance information to the Authorized
Inspector to attend witness and Hold inspection points.
7.6 Stage wise inspection (Visual, Thickness and Dimension Inspection) shall be
carried out by QC Inspector/QC Engineer.
7.7 Final visual & dimensional checks shall be carried out after completing all
NDE requirements as recorded in "Final Inspection Report" (Exhibit QC 6)
shall be prepared by the QC Inspector.
7.8 When entry inside the vessel is restricted due to size or any other reasons, an
inspection stage shall be identified as Hold to enable the AI to perform his
visual inspection of internal surface prior to setting up of closing weld seam.
All areas of NDE are selected by the QSD to Construction Code requirements.
Location of Spot RT is selected by the AI. QSD and AI may designate
additional examination/Inspection. When AI has been notified in advance and
cannot be present or otherwise make the selection, QSD may exercise his own
judgement in selecting the spots.
Doc. No. ASY-ASME-1
7.11 Upon completion of a Code item and receiving advice from QSD, the Quality
Assurance GM shall prepare the Manufacturer’s Data Report from the final
records and QSD shall review for correctness and completeness and shall
certify by signing for ‘ASY. The completed MDR, together with the drawings,
design documents and QC records are then presented to the Authorized
Inspector for review and his signature.
7.12 The QSD has custody and control of the ASME Certification Mark Stamps and
The National Board “NB” and “R” Stamps.
7.13 The QSD shall be responsible to collect all required records and reports and
verify that all stages in the ITP has been completed and signed off
satisfactorily by the designees. The QSD shall issue the ASME certification
Mark Stamp for use only when all fabrication, field assembly, examinations,
tests, and inspections are completed and the AI has authorized application of
Certification Mark Stamping. ASME Certification Mark Stamp shall be applied
in presence of the AI.
7.14 The QSD shall be responsible for correctness of the nameplate/stamping data
c) The National Board serial numbers shall start with 1 without prefixes
or suffixes and shall be a whole number in numerical order without
skips or gaps of unused numbers or duplication of numbers. The NB
numbers are assigned on completion of pressure test or when the
pressure test is not carried out at the shop the NB numbers are
assigned at the time of certification of data reports.
d) The QSD shall maintain a NB Register Log Book (Exhibit-7.08) of
National Board serial numbers issued, showing National Board serial
number, description of the item stamped, customer and location, date
MDR certified and the date of dispatch of MDR to the National Board
for registration.
For pressure vessels (U Designator) a copy of the MDR shall be furnished to:
a) Client/Owner/User or their designated Agent
Doc. No. ASY-ASME-1
e) When items are required to be registered with the National Board, the
QSD shall send the original MDR with applicable attachments to the
National Board within 30 days of signature by the AI. The data reports
shall be sent to: