SACPCPM REPORT
FOR
J ULIUS TA WA NDA MA VHUNG IR E
CA NDIDA TE REGISTRATION NO. B/1365/2013

A NNEXURE A1
PROJ ECT P ROFILE

August 2019

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

Table of Contents
List of Abbreviations.............................................................................................................................ii
1Introduction...................................................................................................................................1
2ProjectProfiles..............................................................................................................................2
2.1 Additions and Alterations at Impungwe DistrictHospital.........................................................2
2.2 New Witbank Specialized Hospital.........................................................................................3
2.3 Upgrading of Existing Mbombe la Public Library.....................................................................4
2.4 Repairs to various building facilities atWitbankHospital........................................................5
2.5 Repairs to various building facilities atEmbhuleniHospital....................................................6
2.6 Repairs to various building facilities at Tintswalo Hospital......................................................7
2.7 Repairs to various building facilities at Tonga Hospital...........................................................8
2.8 Repairs to various building facilities at Tonga Hospital...........................................................9
2.9 Emergency Repairs and Renovations at Matikwane Hospital..............................................10
2.10 Additions and Upgrades at existing Shongwe Hospital........................................................11
2.11 Additions and Upgrading of existing of Nkangala In-Patient Treatment Centre ....................12
2.12 New Middelburg District Hospital (Design and Build) ...........................................................13
2.13 Repair of various Storm Damaged Health Facilities in Nkomazi Local Municipality ..............14
2.14 New Mpumalanga Parliamentary Village..............................................................................15
2.15 New Mapulaneng RegionalHospital....................................................................................16
2.16 Major Additions and Upgrades to existing Ma mme tlha ke Hospital.......................................18
2.17 New Stores Building at Ermelo Hospital...............................................................................19
2.18 Major Additions and Upgrades to existing BethalHospital...................................................20
2.19 New Ogies Early Child DevelopmentCenter........................................................................21
2.20 Concept Development for Mpumalanga Early Child DevelopmentCenters..........................22
2.21 Security Upgrading at Existing Hospital Facilities (Fencing, etc) within the Province ...........23
2.22 Additions and Upgrading of existing of Swartfontein TreatmentCentre................................24
2.23 New Creative Industry Cultural Hub for the DCSR...............................................................25
2.24 New High- Altitude Training Center for the DCSR.................................................................26
2.25 New Glenmore Offices forDSD...........................................................................................27
2.26 New Hendrina Offices forDSD............................................................................................28
2.27 New Thulamahashe Children’s Home..................................................................................29
2.28 New Mpumalanga Traffic Training College ..........................................................................30
2.29 Mpuma la nga Building Infrastructure Programme.................................................................31
3 Conclusion..................................................................................................................................32
4 Declaration.................................................................................................................................32

Annexure A1
SACPCMP i
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

List of Abbreviations

1. DCSR - Mpuma la nga Department of Culture, Sport and Recreation


2. DCSSL - Mpuma la nga Department of Community Safety, Security and Liaison
3. DSD - Mpuma la nga Department of Social Development
4. DOE - Mpuma la nga Department of Education
5. DOH - Mpuma la nga Department of Health
6. LM - Local Municipality
7. ST - Steve Ts hwete Local Municipality

Annexure A1
SACPCMP ii
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

1 Introduction

Below is an account of the various projects on which the candidate participated during their planning,
design and implementation. This report is submitted in partial fulfilment of the requirements of the
South African Council for the Project and Construction Management Professions (SACPCMP)
hereinafter referred to as the “Council” for registration as a Professional Construction Project
Manager.

All required by the Council and by law, each profile comprise the following project details:

• Na me of Project
• Type and Description of Project
• Geographical Location of Project
• Na me of Client and Position and Contact Details of Client
Representative
• List of Participating Organizations
• Original Completion Date and Actual Completion Date
• Percentage of Practical Completion
• Percentage
Total value of
participation
P roject of your organization in the project
• The Candidate’s specific role in the project
• Whether the project was successfully completed or not.

Annexure A1
SACPCMP 1
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2 Project Profiles

2.1 Additions and Alterations at Impungwe District Hos pital

Na me of Project: Impungwe District Hospital


Proposed Additions and Alterations to various building
Type and Description of Project: facilities on the Existing Impungwe District Hospital,
Emalahleni District Municipality
Town / Village: Witbank
Geographical Location of Project Local Municipality: Emalahleni
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: NA
Project Architect: NA
List of Participating Organizations Project Quantity Surveyor: NA
Project Engineer: NA
Project Engineer: NA
Ma in Contractor: NA

Start Date (Participation): Aug 2019


Original Completion Date and Actual
Original Completion Date: Mar 2023
Completion Date
Revised Completion Date: Mar 2023
Percentage of Practical Completion NA
Total value of P roject R 230 million
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO) – Development of Brief
Was the project successfully Project Commenced in August 2019 and planned for
completed Completion in Ma rch 2023

Annexure A1
SACPCMP 2
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.2 New Witbank Specialized Hos pital

Na me of Project: Proposed New Witbank Specialized Hos pital


Proposed Construction of a new 350 bed specialized
Hos pital in Witbank for the Mpuma la nga Department
Type and Description of Project: of
Health, Emalahleni District Municipality. The new hospital
consists of the various Clinical areas as we ll as the
necessary ancillary and supportWitbank
Town / Village: facilities
Geographical Location of Project Local Municipality: Emalahleni
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: BN Githae Architects
Project Architect: BN Githae Architects
List of Participating Organizations Project Quantity Surveyor: Zethu Quantity Surveyors
Project Engineer: SML Projects
Project Engineer: NA
Ma in Contractor: NA

Start Date (Participation): Apr 2019


Original Completion Date and Actual
Original Completion Date: Mar 2025
Completion Date
Revised Completion Date: Mar 2025
Percentage of Practical Completion NA
Total value of P roject R 1.5 billion
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO) – Development of Brief
Was the project successfully Project Commenced in April 2019 and planned for
completed Completion in Ma rch 2025

Annexure A1
SACPCMP 3
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.3 Upgrading of Existing Mbo mbela Public Library

Proposed Upgrading and Additions to the existing Mbombela


Na me of Project:
Existing Mbombe la Public Library
Renovation of old wes tern building wing (to include roof
repair); Improving functionality through optimization of
available floor space through partitioning to include areas as
per library requirements such as junior section (non-fictional),
toddler section, adult section (fictional), reference sections,
discussion and computer rooms; increasing the floor area to
include additional floor space for an auditorium, cafeteria,
Type and Description of Project: offices and boardrooms; Improving accessibility for people
living with disabilities and the blind; Refurbishment of HVAC
systems; Installation of ICT and electronic systems such as
radio frequency book identification system; Upgrading of
s torm wate r drainage and power capacity; Building
compliance to new building regulations example OHS and
fire regulations; Reconfiguration and increased parking area;
as well as Improved access to the library.
Town / Village: Nelspuit
Geographical Location of Project Local Municipality: Mbombe la
Province: Mpumalanga
Client: DCSR
Na me of Client and Position and
Contact Person: Mr M Tsotsetsi
Contact Details of Client
Contact Details: +27 71 768 8339
Project Sponsor: DCSR
Implementing Agent (PMO): DPWRT
Principal Consultant: Orbic Architects
Project Architect: Orbic Architects
List of Participating Organizations Project Quantity Surveyor: HP2 Quantity Surveyors
Project Engineer: Ilanda Africa Consultants
Project Engineer: Haki Consultants
Ma in Contractor: NA

Start Date (Participation): Apr 2018


Original Completion Date and Actual
Original Completion Date: Dec 2021
Completion Date
Revised Completion Date: Dec 2021
Percentage of Practical Completion NA
Total value of P roject R 45 million
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully Project Commenced in April 2018 and planned for
completed Completion in December 2021

Annexure A1
SACPCMP 4
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.4 Repairs to various building facilities at Witbank Hos pital

Comprehensive maintenance and repairs of building facilities


Na me of Project: at Witbank Hospital (2018/19 Financial Year), Emalahleni
Local Municipality
Renovation of the Ma le ward, OPD, Pediatric Ward as we
ll
Type and Description of Project:
as New wate r proof and repair of drainage structure on the
Orthopedic Building, Repair of damaged sub surface
drainage
Town structure) at WitbankHos
/ Village: pital
Witbank
Geographical Location of Project Local Municipality: Emalahleni
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: DPWRT In-house Teams
Project Architect: DPWRT In-house Teams
List of Participating Organizations Project Quantity Surveyor: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Ma in Contractor: Aris e General Building
Construction
Start Date (Participation): Oct 2018
Original Completion Date and Actual
Original Completion Date: Mar 2019
Completion Date
Revised Completion Date: Apr 2019
Percentage of Practical Completion 100%
Total value of P roject R 5.4 million
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes, although after a delay of almost 1 month.
completed

Annexure A1
SACPCMP 5
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.5 Repairs to various building facilities at Embhuleni Hos pital

Comprehensive maintenance and repairs of building facilities


Na me of Project: at Embhuleni Hospital (2018/19 Financial Year), Albert
Luthuli Local Municipality (PWRT/MAIN/059/18/MP )
Major renovation of the administration area, reception area,
casualty and Theatre, EMS, Ma le Medical Ward, Labor
Ward, Nurs es Home, Wards 3 (Wellness), Ward 4
Type and Description of Project: (Psychiatric) and Ward 5 (Female Ward), Change Room,
Kitchen, Doctors Q uarte rs and Stores . Work consists of
painting, plumbing, floors, ceilings, carpentry and joinery,
waterproofing and electrical works
Town / Village: Elukwatini
Geographical Location of Project Local Municipality: Albert Luthuli
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: DPWRT In-house Teams
Project Architect: DPWRT In-house Teams
List of Participating Organizations Project Quantity Surveyor: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Ma in Contractor: KZK General Trading

Start Date (Participation): Oct 2018


Original Completion Date and Actual
Original Completion Date: May 2019
Completion Date
Revised Completion Date: J ul 2019
Percentage of Practical Completion 100%
Total value of P roject R 9.6 million
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes, although after a delay of almost 2 month.
completed

Annexure A1
SACPCMP 6
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.6 Repairs to various building facilities at Tintswalo Hos pital

Comprehensive maintenance and repairs of building facilities


Na me of Project: at Tintswalo Hospital (2018/19 Financial Year),
Bushbuckridge Local Municipality (PWRT/MAIN/049/18/MP )
Major renovation to the Mo rtua ry, Laundry, three doctors
Type and Description of Project: houses. Work consists of painting, plumbing, floors, ceilings,
carpentry and joinery, waterproofing and electrical works
Town / Village: Acornhoek
Geographical Location of Project Local Municipality: Bushbuckridge
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: DPWRT In-house Teams
Project Architect: DPWRT In-house Teams
List of Participating Organizations Project Quantity Surveyor: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Ma in Contractor: Nokzi Trading

Start Date (Participation): Oct 2018


Original Completion Date and Actual
Original Completion Date: Apr 2019
Completion Date
Revised Completion Date: Apr 2019
Percentage of Practical Completion 100%
Total value of P roject R 4.7 million
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 7
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.7 Repairs to various building facilities at Tonga Hos pital

Comprehensive maintenance and repairs of building facilities


Na me of Project: at Tonga Hospital (2018/19 Financial Year), Nkomazi Local
Municipality (PWRT/MAIN/054/18/MP )
Major renovation to Existing Administration Building; Single
Quarters ; Wards 1 to 8 Buildings; Repairs to Existing
Type and Description of Project: Casualty Building; Repairs to Existing OPD Building; Repairs
to existing EMS Building; Repairs to existing Doctors
Accommodation and Repairs to existing Kitchen
Town / Village: Tonga
Geographical Location of Project Local Municipality: Nkomazi
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: DPWRT In-house Teams
Project Architect: DPWRT In-house Teams
List of Participating Organizations Project Quantity Surveyor: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Ma in Contractor: Bullpool Investment

Start Date (Participation): Oct 2018


Original Completion Date and Actual
Original Completion Date: Mar 2019
Completion Date
Revised Completion Date: Mar 2019
Percentage of Practical Completion 100%
Total value of P roject R 12.5 million
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 8
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.8 Repairs to various building facilities at Tonga Hos pital

Comprehensive maintenance and repairs of building facilities


Na me of Project: at Tonga Hospital (2018/19 Financial Year), Nkomazi Local
Municipality (PWRT/MAIN/054/18/MP )
Major renovation to Existing Administration Building; Single
Quarters ; Wards 1 to 8 Buildings; Repairs to Existing
Type and Description of Project: Casualty Building; Repairs to Existing OPD Building; Repairs
to existing EMS Building; Repairs to existing Doctors
Accommodation and Repairs to existing Kitchen
Town / Village: Tonga
Geographical Location of Project Local Municipality: Nkoma zi
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: DPWRT In-house Teams
Project Architect: DPWRT In-house Teams
List of Participating Organizations Project Quantity Surveyor: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Project Engineer: DPWRT In-house Teams
Ma in Contractor: Bullpool Investment

Start Date (Participation): Oct 2018


Original Completion Date and Actual
Original Completion Date: Mar 2019
Completion Date
Revised Completion Date: Mar 2019
Percentage of Practical Completion 100%
Total value of P roject R 12.5 million
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 9
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.9 Emergency Repairs and Renovations at Matikwane Hos pital

Emergency repair and renovation of various storm damaged


Na me of Project: building facilities at Matikwane Hospital, Bushbuckridge Local
Municipality (PWRT/MAIN/002/18/MP )
Repairs to the Administration Building; Wards,
Accommodation. Work comprises of replacement or sealing
Type and Description of Project: of damaged roofs, replacement of damaged floors, glazing,
electrical work, mechanical works and related external works
such as new carports, etc
Town / Village: Mkhuhlu
Geographical Location of Project Local Municipality: Bushbuckridge
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: Afro Architectural
Project Architect: Afro Architectural
List of Participating Organizations Project Quantity Surveyor: Archiconsult QS
Project Engineer: Ilanda Africa Consultants
Project Engineer: NA
Ma in Contractor: Bamboo Rock 1349cc

Start Date (Participation): Jan 2018


Original Completion Date and Actual
Original Completion Date: Aug 2018
Completion Date
Revised Completion Date: Aug 2018
Percentage of Practical Completion 100%
Total value of P roject R 14.8 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 10
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.10 Additions and Upgrades at existing Shongwe Hos pital

Major Additions and Upgrading of Existing Hospital Facilities


Na me of Project:
at Shongwe Hospital, Nkomazi Local Municipality
Master planning of the hospital facility, demolition of all
condemned buildings and alterations to existing buildings,
Type and Description of Project:
reticulation of services and upgrading of electricity supply as
well as the was te water treatment plant.
Town / Village: Driekoppies
Geographical Location of Project Local Municipality: Nkoma zi
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: TJ Architects
Project Architect: TJ Architects
List of Participating Organizations Project Quantity Surveyor: QualConsult QS
Project Engineer: Ilanda Africa Consultants
Project Engineer: Makhosi Engineers
Ma in Contractor: NA

Start Date (Participation): Jan 2017


Original Completion Date and Actual
Original Completion Date: Mar 2020
Completion Date
Revised Completion Date: NA
Percentage of Practical Completion NA
Total value of P roject R 510 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Project put on hold due to budget constraints
completed

Annexure A1
SACPCMP 11
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.11 Additions and Upgrading of existing of Nkangala In-Patient Treatment Centre

Additions and Upgrading of existing of Nkangala In-Patient


Na me of Project: Treatment Centre for the Department of Social Development,
Victor Khanye Local Municipality (PWRT/2234/16/MP)
The project comprises the construction of a new In-patient
Treatment Centre for persons suffering from substance
abuse. It is to be built on the previously developed land with
Type and Description of Project: existing structures which some will be demolished and some
re- used for different purposes. Internal and Access roads
works , s ite works and services are part of the scope of
works .
Town / Village: Delmas
Geographical Location of Project Local Municipality: Victor Khanye
Province: Mpumalanga
Client: DSD
Na me of Client and Position and
Contact Person: Ms K Mas uku
Contact Details of Client
Contact Details: +27 79 681 7550
Project Sponsor: DSD
Implementing Agent (PMO): DPWRT
Principal Consultant: DV Talani Consulting
Project Architect: DV Talani consulting
List of Participating Organizations Project Quantity Surveyor: DV Talani consulting
Project Engineer: SFC Engineers
Project Engineer: Mute o Consulting Engineers
Ma in Contractor: Mpfumelelo Business
Enterprise
Start Date (Participation): Apr 2016
Original Completion Date and Actual
Original Completion Date: Sep 2018
Completion Date
Revised Completion Date: Dec 2018
Percentage of Practical Completion 100
Total value of P roject R 130.4 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 12
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.12 New Middelburg District Hos pital (Design and Build)

Proposed Construction of New Middelburg District Hospital


Na me of Project: (220 beds) using the Design and Build Procurement route,
Steve Ts hwete Local Municipality (PWRT/2219/16/MP)
Proposed Construction of New Midde lburg District Hos pital
(220 beds) using the Design and Build Procurement route,
Type and Description of Project:
including reticulation of all services, provision of access and
related external works
Town / Village: Middelburg
Geographical Location of Project Local Municipality: Steve Tshwete
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Project Manager: Mots e LMI Architects
Land Donor: ST Local Municipality
List of Participating Organizations Project Quantity Surveyor: Ma tla QS
Project Engineer: Projectineers (Pty) Ltd
Project Engineer: Mute o Consulting Engineers
Ma in Contractor: Enza Construction

Start Date (Participation): Apr 2016


Original Completion Date and Actual
Original Completion Date: Dec 2019
Completion Date
Revised Completion Date: Mar 2021
Percentage of Practical Completion 35%
Total value of P roject R 1.2 Billion (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
On-going (Planned for completion in Ma rch 2021
completed

Annexure A1
SACPCMP 13
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.13 Repair of various Storm Damaged Health Facilities in Nko mazi Local
Municipality
Repair of Various Storm Damaged Clinics in Nkomazi
Na me of Project:
Nkomazi Local Municipality (2016/17 Financial Year)
Repair of damaged facilities including Ma ngwe ni Clinic,
Dludluma Clinic, Mas ibekela Clinic, Naas Ma la ria Centre,
Shongwe Hos pital and Tonga Hospital. The scope of wo rk
Type and Description of Project:
comprised replacement of damaged roof and ceilings, repairs
to wall finishes and flow finishes, plumbing work, and related
repair work
Town / Village: Various in Nkomazi LM
Geographical Location of Project Local Municipality: Nkoma zi
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: DPWRT Inhouse Team
Project Architect: DPWRT Inhouse Team
List of Participating Organizations Project Quantity Surveyor: DPWRT Inhouse Team
Project Engineer: DPWRT Inhouse Team
Project Engineer: DPWRT Inhouse Team
Ma in Contractor: Nokushudula (Pty) Ltd

Start Date (Participation): Oct 2016


Original Completion Date and Actual
Original Completion Date: Mar 2017
Completion Date
Revised Completion Date: Nov 2017
Percentage of Practical Completion 100%
Total value of P roject R 17.4 million
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 14
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.14 New Mpumalanga Parliamentary Village

Proposed New Mpumalanga Parliamentary Village,


Na me of Project:
Mbombe la Local Municipality
The project comprises Construction of 13 Me mbe rs
Provincial Legislators (MPLs) Residences, 12 Me mbe rs of
the Executive Council (MECs) Residences, 1 Speaker’s
Residence, 1 Premier’s Residence , 1 State House, 1 Set of
Common Recreational Facilities, Security P erimeter Fence
Type and Description of Project:
and P atrol Road; Internal Services: Access road, internal
roads, s torm wate r drainage, wate r supply and sewer
reticulation, External Bulk Services (Electricity, Wate r,
Sewer) as we ll as various building Facilities for Security
Services (dog unit, etc.)
Town / Village: Ne ls pruit
Geographical Location of Project Local Municipality: Mbombe la
Province: Mpumalanga
Client: Mpumalanga Legislature
Na me of Client and Position and
Contact Person: Mr L Mwale
Contact Details of Client
Contact Details: +27 82 555 3243
Project Sponsor: Mpumalanga Legislature
Implementing Agent (PMO): DPWRT
Principal Consultant: QualConsult QS
Project Architect: Cocoon Ne two rk
List of Participating Organizations Project Quantity Surveyor: QualConsult QS
Project Engineer: FT Consultants
Project Engineer: Makhosi Engineers
Ma in Contractor: Clear Choice Builders
Whitehazy Construction
Start Date (Participation): Apr 2016
Original Completion Date and Actual
Original Completion Date: Mar 2019
Completion Date
Revised Completion Date: Apr 2020
Percentage of Practical Completion 20%
Total value of P roject R 395 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Ongoing. Planned for completion in April 2020
completed

Annexure A1
SACPCMP 15
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.15 New Mapulaneng Regional Hos pital

Proposed New Mapulaneng (365 bed) Regional Hospital,


Na me of Project:
Bushbuckridge Local Municipality
Out Patient Department (consisting of 8 hour services,
general consulting rooms for new cases, fast track area,
history taking and Vital signs rooms, Children and adults-
screening area, Rehydration room, Treatment room/
procedure room, Out Patient department – Medical &
Surgical clinics, Ma le Medical Circumcision: Reception
waiting areas, consulting rooms, procedure room and
observation wa rd to accommodate 8 examination couches);
Trauma Unit (consisting of 24 hour Services, Emergency
Services; Casualty, Resuscitation, P rocedure room, Plaster
of P aris, Consulting rooms , observation ward, EMS Unit;
Me dico legal Services and Victims of Violence Service Area;
Radiology); Inpatient Department (consisting of 36 surgical
beds (18 male and 18 female); 36 Orthopedic beds (18 male
and 18 female); 72 medical beds (36 male and 36 female);
20 Psychiatric beds; 28 Tuberculosis beds; 22 Gynecology
Type and Description of Project: beds; 36 Pediatric beds; 16 Sub-acute beds; 6 Isolation
beds; 8 Intensive Care beds & 4 High Care beds); Maternal
Care (consisting of 20 Antenatal beds; 28 Post-natal beds; 3
Ma te rnity High Care beds; 7 Kangaroo Mothe r Care beds; 3
Neonatal Isolation beds; 10 Standard Neonatal beds; 3
Neonatal High Care beds; a 4 Neonatal Intensive Care
beds); 6 x Operating Theatres; Pharmacy Services; Hos pital
Mo rtua ry and Forensic Pathology Laboratory; National Health
Laboratory Services; Blood Bank; Administration,
Management and Related Services; Resource Centre; Food
Services Kitchen and Dining Area; Wellness Centre;
Recreational Centre; Laundry/Linen Bank; Waste
Management; Security; Central Cleaners; Bulk Stores;
Engineering Workshops; Medical Orthotics and P ros thetic
Unit; Plant; Staff Accommodation; Student Accommodation;
Crèche and associated reticulation of bulk services, parking
and associated external works
Town / Village: Bushbuckridge
Geographical Location of Project Local Municipality: Bushbuckridge
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942

Annexure A1
SACPCMP 16
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

Project Sponsor: Department of Health


Implementing Agent (PMO): DPWRT
Principal Consultant: Afro-architectural cc
Project Architect: Afro-architectural cc
List of Participating Organizations Project Quantity Surveyor: QualConsult QS
Project Engineer: Ilanda Africa Consultants
Project Engineer: Risimati Engineers
Ma in Contractor: Clear Choice Builders

Start Date (Participation): Jan 2016


Original Completion Date and Actual
Original Completion Date: Mar 2025
Completion Date
Revised Completion Date: Mar 2025
Percentage of Practical Completion 10%
Total value of P roject R 2.2 Billion
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
On-going. Planned for completion in Ma rch 2025
completed

Annexure A1
SACPCMP 17
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.16 Majo r Additions and Upgrades to existing Mammetlhake Hos


pital
Major Additions and Upgrades to existing Ma mme tlha ke
Na me of Project: Hospital, DrJS Mo roka Local Municipality
(PWRT/2149/15/MP)
The project consists of construction of an Out Patient
Department (including 10 consulting rooms and public
toilets); Casualty and Patient Administration; Antenatal
Wards; Post Natal Wards; Nurs e ry; Pediatric Wards; Doctors
on Call; Theatre and CSSD; Surgical Wards ; Pharmacy; X-
Ray; Mo rtua ry ;Kitchen; Laundry ;V.I.E Gas; Supply Chain
Type and Description of Project:
Management; Mechanical Maintenance; G uard Hous e Type
B; Grounds Maintenance; Nurs ing School Accommodation;
Plant Room and Associated external works (walkwa ys ,
parking, internal roads, drainage s tructure s , access road,
perimeter fence, etc), electrical works , mechanical works ,
etc.
Town / Village: Ma mme tlha ke
Geographical Location of Project Local Municipality: DrJS Mo roka
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: Afro-architectural cc
Project Architect: Afro-architectural cc
List of Participating Organizations Project Quantity Surveyor: Nkonki and Associates
Project Engineer: Afrisa Holdings
Project Engineer: Risimati Engineers
Ma in Contractor: Clear Choice Builders

Start Date (Participation): Oct 2014


Original Completion Date and Actual
Original Completion Date: Nov 2018
Completion Date
Revised Completion Date: Oct 2019
Percentage of Practical Completion 100%
Total value of P roject R 469 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully Practical completion achieved. Project on defects liability and
completed close out stage

Annexure A1
SACPCMP 18
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.17 New Stores Building at Ermelo Hos pital

Construction of new stores and linen Building at Ermelo


Na me of Project:
Hospital, Ms uka ligwa Local Municipality (PWRT/2031/12/MP)
Construction of New Supply Chain S tores and Provision of
Type and Description of Project:
staff Parking, etc
Town / Village: Ermelo
Geographical Location of Project Local Municipality: Ms uka ligwa
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: Nxumalo DeJ ager Architects
Project Architect: Nxumalo DeJ ager Architects
List of Participating Organizations Project Quantity Surveyor: Morei Matji and Associates
Project Engineer: Mzansi Africa Civils
Project Engineer: Mute o Consulting
Ma in Contractor: Atile Investments

Start Date (Participation): Oct 2014


Original Completion Date and Actual
Original Completion Date: Mar 2016
Completion Date
Revised Completion Date: Mar 2018
Percentage of Practical Completion 100%
Total value of P roject R 35.9 million (including professional fees)
Percentage participation of your
65%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 19
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.18 Majo r Additions and Upgrades to existing Bethal Hos


pital
Major Additions and Upgrades to existing Betha Hospital,
Na me of Project:
Govan Mbeki Local Municipality (PWRT/2149/15/MP)
Demolishing of existing asbestos structures and construction
of new staff accommodation 5 2x2 bed units; OPD;
Pharmacy and X-ray Department; New administration block;
theatre; casualty unit; maternity ward; allied health block
(rehabilitation unit); New crèche; New learning centre; New
Type and Description of Project: kitchen; New Wards (1xPaediadtric, 1x General ward 1 male,
1 female); New stores; Renovation of laundry; Renovation of
maintenance block; Conversion of Ward to forensic
pathology and associated external works as S ite wate r and
s ewage reticulation; S ite Electrical reticulation and lighting;
Water storage; helipad and parking and access roads
Town / Village: Bethal
Geographical Location of Project Local Municipality: Govan Mbe ki
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: FT Quantity Surveyors
Project Architect: Tarch Architects
List of Participating Organizations Project Quantity Surveyor: FT Quantity Surveyors
Project Engineer: FT Consultants
Project Engineer: GKB Design Associates
Ma in Contractor: Clear Choice Builders

Start Date (Participation): Oct 2014


Original Completion Date and Actual
Original Completion Date: Sep 2019
Completion Date
Revised Completion Date: Mar 2020
Percentage of Practical Completion 100%
Total value of P roject R 790 million (including professional fees)
Percentage participation of your
65%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
On-going
completed

Annexure A1
SACPCMP 20
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.19 New Ogies Early Child Development Center

Construction of New Ogies Early Child Development Center,


Na me of Project:
Emalahleni Local Municipality (PWRT/2169/15/MP)
Construction of New Ogies Early Child Development Center,
Type and Description of Project:
Emalahleni Local Municipality (PWRT/2169/15/MP)
Hlanguphala P rima ry School,
Town / Village:
Ogies
Geographical Location of Project
Local Municipality: Emalahleni
Province: Mpumalanga
Client: DSD
Na me of Client and Position and
Contact Person: Ms K Mas uku
Contact Details of Client
Contact Details: +27 79 681 7550
Project Sponsor: DSD
Implementing Agent (PMO): DPWRT
Principal Consultant: Cecilia Architects
Project Architect: Cecilia Architects
List of Participating Organizations Project Quantity Surveyor: Siyakha Quantity Surveyors
Project Engineer: Likhanyile Consultants
Project Engineer: Mute o Consulting Engineers
Ma in Contractor: Your Trade cc

Start Date (Participation): Nov 2015


Original Completion Date and Actual
Original Completion Date: Sep 2016
Completion Date
Revised Completion Date: Mar 2017
Percentage of Practical Completion NA
Total value of P roject R 4.9 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 21
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.20 Concept Development for Mpumalanga Early Child Development Centers

Concept Development for Mpumalanga Early Child


Na me of Project:
Development Centers
Proposed Construction Various Early Child Development
Type and Description of Project:
(ECD) Centres within Mpuma langa Province
Town / Village: NA
Geographical Location of Project Local Municipality: Various
Province: Mpumalanga
Client: DSD
Na me of Client and Position and
Contact Person: Ms K Mas uku
Contact Details of Client
Contact Details: +27 79 681 7550
Project Sponsor: DSD
Implementing Agent (PMO): DPWRT
Principal Consultant: Cecilia Architects
Project Architect: Cecilia Architects
List of Participating Organizations Project Quantity Surveyor: Siyakha Quantity Surveyors
Project Engineer: Likhanyile Consultants
Project Engineer: Mute o Consulting Engineers
Ma in Contractor: NA

Start Date (Participation): Apr 2015


Original Completion Date and Actual
Original Completion Date: Oct 2015
Completion Date
Revised Completion Date: Oct 2015
Percentage of Practical Completion NA
Total value of P roject R 5 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes. Concept and budget approved
completed

Annexure A1
SACPCMP 22
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.21 Security Upgrading at Existing Hos pital Facilities (Fencing, etc) within the Province

Security Upgrading at Existing Hospital Facilities (Fencing,


Na me of Project:
etc) within the Province
Provision of concrete palisade fencing, guardhouses and
Type and Description of Project: security gates at various Hos pital facilities within
Mpuma la nga Province
Town / Village: Various
Geographical Location of Project Local Municipality: Various
Province: Mpumalanga
Client: Department of Health
Na me of Client and Position and
Contact Person: MrE Mo kwa ne
Contact Details of Client
Contact Details: +27 83 712 8942
Project Sponsor: Department of Health
Implementing Agent (PMO): DPWRT
Principal Consultant: DPWRT Inhouse Team
Project Architect: DPWRT Inhouse Team
Project Quantity Surveyor: DPWRT Inhouse Team
Project Engineer: DPWRT Inhouse Team
List of Participating Organizations
Project Engineer: DPWRT Inhouse Team
Ma in Contractor: QDS Projects
Ntsangalala Business
Enterprise
Trans G ariep Infra (EDMS )
BPK
Start Date (Participation): Nov 2014
Original Completion Date and Actual
Original Completion Date: J ul 2015
Completion Date
Revised Completion Date: Feb 2016
Percentage of Practical Completion 100%
Total value of P roject R 47.7 million
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 23
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.22 Additions and Upgrading of existing of Swartfontein Treatment Centre

Additions and Upgrading of existing of Swartfontein


Na me of Project: Treatment Centre for the Department of Social Development,
Mbombe la Local Municipality (PWRT/PRE/2088/14/MP)
The project comprises the Construction of new of five female
housing units for 10 residents each, an administration block,
Type and Description of Project: laundry, TV Room and Guardhouse, upgrading of existing
roads and fencing at Swartfontein Treatment Centre for the
Department of Social Development
Town / Village: Near Whiteriver
Geographical Location of Project Local Municipality: Mbombe la
Province: Mpumalanga
Client: DSD
Na me of Client and Position and
Contact Person: Ms K Mas uku
Contact Details of Client
Contact Details: +27 79 681 7550
Project Sponsor: DSD
Implementing Agent (PMO): DPWRT
Principal Consultant: Mpa nde Consultants cc
Project Architect: Mpa nde Consultants cc
List of Participating Organizations Project Quantity Surveyor: Maqs icon Mpumalanga
Project Engineer: Contempo Project Solutions
Project Engineer: Makhosi Engineers
Ma in Contractor: Mpfumelelo Business
Enterprise
Start Date (Participation): Oct 2014
Original Completion Date and Actual
Original Completion Date: Sep 2016
Completion Date
Revised Completion Date: Feb 2017
Percentage of Practical Completion 100
Total value of P roject R 37.2 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 24
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.23 New Creative Industry Cultural Hub for the DCSR

Proposed New Creative Industry Cultural Hub for the


Na me of Project: Department of Culture, Sport and Recreation (DCSR),
Mbombe la Local Municipality
Project Scope of Work comprised construction of Theatre
Building; Incubator Building and Parking; Studio Building A;
Type and Description of Project: Studio Building B; Arena and Vocal Arts Studios as we ll as
associated reticulation of services and provision of
accessibility and parking
Town / Village: Whiteriver
Geographical Location of Project Local Municipality: Mbombe la
Province: Mpumalanga
Client: DCSR
Na me of Client and Position and
Contact Person: Mr M Tsotsetsi
Contact Details of Client
Contact Details: +27 71 768 8339
Project Sponsor: DCSR
Implementing Agent (PMO): DPWRT
Principal Consultant: Ekuthuleni Architects
Project Architect: Ekuthuleni Architects
List of Participating Organizations Project Quantity Surveyor: Maqs icon Mpumalanga
Project Engineer: Afrisa Consulting Engineers
Project Engineer: Makhosi Engineers
Ma in Contractor: NA

Start Date (Participation): Nov 2014


Original Completion Date and Actual
Original Completion Date: Mar 2019
Completion Date
Revised Completion Date: Na
Percentage of Practical Completion NA
Total value of P roject R 2.7 Billion
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Project on hold as various funding options are being explored
completed

Annexure A1
SACPCMP 25
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.24 New High-Altitude Training Center for the DCSR

Proposed New High- Altitude Training Center for the


Na me of Project: Department of Culture, Sport and Recreation (DCSR),
Emakhazeni Local Municipality
The scope of wo rk included the development of the Individual
Sports Training Facilities to the Different Federations
Specification; Spectators Arenas for Identified Sports
Disciplines; Multipurpo s e High Performance Centre; S port
Science Faculty; Various Levels of Accommodation for the
Type and Description of Project:
Athletes and Other Us ers and Associated Facilities;
Extensive Team Accommodation; Boarding School for
Students/Pupils; Clinic for the Sportsmen and General
Public; Site Infrastructure and off S ite Services To
Accommodate the Above Developments; Me dia Centre
Town / Village: Belfast
Geographical Location of Project Local Municipality: Emakhazeni
Province: Mpumalanga
Client: DCSR
Na me of Client and Position and
Contact Person: Mr M Tsotsetsi
Contact Details of Client
Contact Details: +27 71 768 8339
Project Sponsor: DCSR
Implementing Agent (PMO): DPWRT
Principal Consultant: MSW
Project Architect: Slate Architects
List of Participating Organizations Project Quantity Surveyor: NA
Project Engineer: MSW
Project Engineer: NA
Ma in Contractor: NA

Start Date (Participation): Nov 2014


Original Completion Date and Actual
Original Completion Date: Mar 2019
Completion Date
Revised Completion Date: Na
Percentage of Practical Completion NA
Total value of P roject R 5.2 Billion
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Project on hold as various funding options are being explored
completed

Annexure A1
SACPCMP 26
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.25 New Glenmore Offices for DSD

Construction of a new Office Block in Glenmore for the


Na me of Project: Department of Social Development, Albert Luthuli Local
Municipality (PWRT/2087/14/MP)
The project comprises the Construction of new office block
Type and Description of Project: with 16 offices, security fencing, water and sewer reticulation,
and associated external works
Town / Village: Glenmore (Near Dundonald)
Geographical Location of Project Local Municipality: Albert Luthuli
Province: Mpumalanga
Client: DSD
Na me of Client and Position and
Contact Person: Ms K Mas uku
Contact Details of Client
Contact Details: +27 79 681 7550
Project Sponsor: DSD
Implementing Agent (PMO): DPWRT
Principal Consultant: Ekuthuleni Architects
Project Architect: Ekuthuleni Architects
List of Participating Organizations Project Quantity Surveyor: Archiconsult QS
Project Engineer: MLN Consultants
Project Engineer: Mute o Consulting Engineers
Ma in Contractor: Sizampilo P rojects

Start Date (Participation): Oct 2014


Original Completion Date and Actual
Original Completion Date: Dec 2015
Completion Date
Revised Completion Date: Dec 2015
Percentage of Practical Completion 100
Total value of P roject R 24.7 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 27
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.26 New Hendrina Offices for DSD

Construction of a new Office Block in Hendrina for the


Na me of Project: Department of Social Development, Steve Tshwete Local
Municipality (PWRT/PRE/1056/14/MP)
The project comprises the Construction of new office block
Type and Description of Project: with 16 offices, security fencing, water and sewer reticulation,
and associated external works
Town / Village: Hendrina
Geographical Location of Project Local Municipality: Steve Tshwete
Province: Mpumalanga
Client: DSD
Na me of Client and Position and
Contact Person: Ms K Mas uku
Contact Details of Client
Contact Details: +27 79 681 7550
Project Sponsor: DSD
Implementing Agent (PMO): DPWRT
Principal Consultant: Ekuthuleni Architects
Project Architect: Ekuthuleni Architects
List of Participating Organizations Project Quantity Surveyor: Archiconsult QS
Project Engineer: MLN Consultants
Project Engineer: Mute o Consulting Engineers
Ma in Contractor: Atile Investments

Start Date (Participation): Oct 2014


Original Completion Date and Actual
Original Completion Date: Dec 2015
Completion Date
Revised Completion Date: May 2016
Percentage of Practical Completion 100
Total value of P roject R 24.8 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 28
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.27 New Thulamahashe Children’s Home

Proposed New Thulamahashe Children Home,


Na me of Project: Bushbuckridge Local Municipality, Ehlanzeni District
Municipality
The project comprises the Construction of housing units, an
administration block, laundry, TV Room, related facilities and
Type and Description of Project:
Guardhouse for the Thulamahashe Children’s Ho me for the
Department of Social Development
Town / Village: Thulamahashe
Geographical Location of Project Local Municipality: Bushbuckridge
Province: Mpumalanga
Client: DSD
Na me of Client and Position and
Contact Person: Ms K Mas uku
Contact Details of Client
Contact Details: +27 79 681 7550
Project Sponsor: DSD
Implementing Agent (PMO): DPWRT
Principal Consultant: ArchiConsult QS
Project Architect: NA
List of Participating Organizations Project Quantity Surveyor: ArchiConsult QS
Project Engineer: NA
Project Engineer: Makhosi Engineers
Ma in Contractor: NA

Start Date (Participation): Sep 2014


Original Completion Date and Actual
Original Completion Date: Sep 2016
Completion Date
Revised Completion Date: NA
Percentage of Practical Completion 100
Total value of P roject R 41.9 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Project on hold
completed

Annexure A1
SACPCMP 29
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.28 New Mpumalanga Traffic Training College

Construction of Mpuma la nga Traffic Training


Na me of Project: College,
Bushbuckridge Local Municipality, Ehlanzeni District
Municipality
The project comprises construction of the Administration
Block, Classrooms Blocks, Auditorium, E- Natis , Shooting
range, Student Centre, Student Housing, Staff Housing,
laundry, Arms and ammunition s tore, P arking Garage, Gate
house and related External works (s torm wate r drainage,
Type and Description of Project: internal access roads, landscaping); civil related works , that
is Skid pad, High speed circuit, Winding road, Slip road, K53
testing station, Weighbridge, associated drainage structures
and ancillary works ; Construction of a 4km concrete palisade
fence and security gates; wa te r, sewer and electricity
reticulation and construction of a raised reservoir tank
Town / Village: Mkhuhlu
Geographical Location of Project Local Municipality: Bushbuckridge
Province: Mpumalanga
Client: DCSSL
Na me of Client and Position and
Contact Person: Ms BE Nkuna
Contact Details of Client
Contact Details: +27 82 809 0861
Project Sponsor: DCSSL
Implementing Agent (PMO): DPWRT
Principal Consultant: Tarch Architects
Project Architect: Tarch Architects
Project Quantity Surveyor: Maqs icon Mpumalanga QS
List of Participating Organizations
Project Engineer: KMS D Engineers
Project Engineer: Lebone Engineering
Ma in Contractor: Mpfumelelo Business
Enterprise
Tiger Business Enterprise
Start Date (Participation): Nov 2013
Original Completion Date and Actual
Original Completion Date: Sep 2016
Completion Date
Revised Completion Date: Dec 2017
Percentage of Practical Completion 100
Total value of P roject R 451 million (including professional fees)
Percentage participation of your
100%
organization in the project
Your specific role in the project Project Manager (PMO)
Was the project successfully
Yes
completed

Annexure A1
SACPCMP 30
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

2.29 Mpumalanga Building Infrastructure Programme

Mpuma la nga Building Infrastructure P rogra mme (2013


Na me of Project:
to
2019)
Planning and Management of various building infrastructure
programmes as follows:
1. 2013/14 Financial Year
2. 2014/15 Financial Year
3. 2015/16 Financial Year
4. 2016/17 Financial Year
5. 2017/18 Financial Year
Type and Description of Project: 6. 2018/19 Financial Year
7. 2019/20 Financial Year

The programme s erves the following Client Department


• Department of He a lth
• Department of Social Development
• Department of Culture, Sport and Recreation
Town / Village: NA
Geographical Location of Project Local Municipality: NA
Province: Mpumalanga
Client: DPWRT
Na me of Client and Position and
Contact Person: Mr MC Mo ro lo
Contact Details of Client
Contact Details: +27 82 809 0861
Project Sponsor: RSA
Implementing Agent (PMO): DPWRT
Client Department: Department of He a lth
List of Participating Organizations
Client Department: DSD
Client Department: DCSR
Client Department: DCSSL
Start Date (Participation): Nov 2013
Original Completion Date and Actual
Original Completion Date: Ongoing
Completion Date
Revised Completion Date: Ongoing
Percentage of Practical Completion On going
Total value of P roject R 1.5 Billion Budget (every financial year)
Percentage participation of your
100%
organization in the project
Your specific role in the project P rogra mme Director
Was the project successfully
Ongoing
completed

Annexure A1
SACPCMP 31
Project Profile

Downloaded by sonwabile jumbo (smkhahlela@gmail.com)


lOMoARcPSD|36442761

J ULIUS TAWANDA MA VHUNG IRE (B/1365/2013)


CANDIDATE CONSTRUCTION PROJ ECT MANAG ER

3 Conclusion

Above is an account of the various projects currently active or completed on which the candidate has
been actively been involved during their planning, design, execution or close out. The above projects
we re implemented in the last four years as required by the Council.

4 Declaration

The Candidate and Mentor hereby declare that all information contained in the above report is correct
and does not deviate from the truth in anyway

I, J ulius Tawanda Mavhungire (B/1365/2013) declare that the above information is correct in
all
regards.

_______________________________ ____________________
MR J T MA VHUNG IR E DATE
CANDIDATE CONSTRUCTION PROJ ECT MANAG ER (B/1365/2013)

_______________________________ _____________________
MR UM OKON DATE
SUPERVISOR AND MENTO R

Annexure A1
SACPCMP 32