You are on page 1of 3

Cleaning Checking Book

GT, ST & others Cleaning area

ST floor & ST floor & ST floor & AC ACW, CW Paste Performed


Date GT floor & Maintanence Feed Pump All room Sewerage Verified By
pipe 1st pipe 2nd pipe 3rd Compressure pump Control By
pipe Workshop House windows Channels
floor floor floor room house Service

Remarks

Comments of Department
Cleaning Checking Book

Chemical unit Cleaning areas & other area


Chemical Building Others Chemical Station

Date C.T P.T HRSG Performed By Verified By


HRSG P.T
AC Room AC Room AC Room Hydrogen Chemical Chemical Chemical Grass
DM Plant Samplaing Control
1st floor 2nd floor 3rd floor Station Dosing Dosing Dosing Cutting
Station Room
Room Room Unit

Remarks

Comments of Department
Cleaning Checking Book

Operation unit Cleaning Areas

Plant Aux.
6.6 Kv CW Relay HVAC
Battery Battery UPS N 20 Aux. EDG & Multist Boiler HVAC
Date Breker HVAC Wareh MCC & Control Room Raw Performed Verified By
room 1 room 2 room room MCC GDG age control Room By
room(S MCC ouse DCS room (CCB Water
(ST 1st (ST 1st (ST 1st (ST 1st room room Pump room (CCB 1st
T 1st Room MCC Panel (CCB 1st 2nd MCC
floor) floor) floor) Floor) (CB 1st MCC house (Near Floor)
floor) Room Floor) Floor)
Floor) HRSG)

Remarks

Comments of Department

You might also like