Professional Documents
Culture Documents
166893.71.0004 Work - Off Site Drainage, North East. March 30, 2010
APPENDIX 1E
TABLE OF CONTENTS
Signature
ABBREVIATIONS I ACRONYMS
OMC: Optimum Moisture Content GI: Galvanized Iron
MOD: Maximum Dry Density CA: Course Aggregate
WBM: Water Bound Macadam FA: Fine Aggregate
PCC: Plain cement concreting CI: Cast Iron
RCC: Reinforced Cement Concreting MS: Mild Steel
CNS: Cohesive Non Shrinking Soil TC: Test Certificate
IRC: Indian Road Congress
Signature
QUANTUM I
TYPE OF REFERENCE DOCUMENTI FORMAT OF
SL.NO. CHARACTERISTICS liTEM INSTRUMENT CLASS FREQUENCY OF REMARKS
CHECK ACCETANCESTANDARD RECORD
CHECK
1.0 SETTING UP OF FQA LAB:
Ensure that laboratory is established at site Equipments List as per
V - B 100% Logbook
before commencinq of work. Annexure-I
3.0 EARTHWORK:
3.1 Excavation: (Refer Table 1 of Technical Specifications on Earthwork)
Check preliminary Survey and layout of Layout I Foundation
3.2 M Total Station B 100% L6
foundations, includinq initial qround level. Drawinqs
3.3 Review of soil I rock test report. R -- B 100% Soil/Rock test report Test Report
Soil I rocks are striped & removed up to the Maintain
identified level. Record dimension & final pit/bed -Compressor I Identified level based on appropriate side
3.1 P/M B 100% L6
level. Note: Any extra excavation carried, should Drilling Machine soil report. slope during
be filled with PCC. excavation.
Signature
4.0 CEMENT:
Test Certificates as per
4.1 - Review of Manufacturer's Test Cert R B 100% Reviewed TC
IS: 1489 Part-I
- Check cement for Type, Consistency, Initial and
final setting time, Compressive strength Compressive L-01
Sample as per IS :
(3 days & 7 days), and C3A Content. T Strength Testing B L-02
1489 Part-I
Note: For critical items of work, ordinary MIC Mould L-05
Portland cement may have to be used.
To avoid deterioration from moisture, One sample from
4.2 VIP - C IS: 4082 Logbook
contamination, and mix up, ensure followinq: each lot received.
- Moisture content
Quantum: One per 100 M3 or part
thereof, or on change of source,
whichever is earlier?
Sieve Set, weigh Each type & source IS 383, IS 2386 & Approved
- Specific gravity -Bulk density MIT B Test Report
balance, Oven, Jar of supply/lS codes Technical Specifications.
- Bulk density
- Voids
- absorption value
- Soundness
- Reaction with Alkali
- Flakiness Index
- Petroqraphv examination
Signature
Before use at site check for Silt & Clay content, IS Code/ Approved IS Code/Approved Tech. L-03
6.2 T/M Sieve set B
Sieve analysis & Bulking of sand. Tech. Spec. Spec. Test Report
7.1 During storage, check visually and verify records. VIR - C Periodical IS 4082 Protocol
In absence of
test certificates /
test to be
Verified Test
7.2 Review of test certificate for following: V - A IS 1786 performed
Certificate
randomly to
confirm the
properties.
Signature
- Grade of Steel.
- Dimensions.
7.3 Verify the followinq:
- Surface characteristics like free from cracks,
Surface flaws, imperfect edge, and rough V - B Random -- Protocol
locoed.
- Dimensions
- Identification for different type and M Screw qauqe B Random
qrade of steel V - B Random
Ensure that reinforcement bars interfering with
7.4 Measuring Bar Bending Schedules,
pockets, pipes, sleeves, openings etc are not cut M B 100% Protocol
Tape Drawings
but suitably adjusted.
Ensure that the joints and crossing bars are tied IS 2502,Bar Bending
7.5 P - C 100% -
properly with correct size & type of binding wire. Schedules, Drawings
8.0 WATER:
Before use, ensure that water from all Source is Once in a month
8.1 T - B Test Certificate IS 456 Logbook
potable. per source
8.2 Conduct test for neutralization factor M Indicator B -00- IS 3025 & IS 456 Loqbook
8.3 Check and ascertain limits of solids. M B -00- IS 3025 & IS 456 Loqbook
8.4 Conduct Test for pH value. M pH Meter B -00- IS 456 Loqbook
Signature
b. Position and level of critical embedded parts. M Leveling Instrument B 100% Drawings Protocol
c. Position, depth and size of holes for bolts. M Measurinq tape B 100% Drawinqs Protocol
Suitable pipe sleeves have been provided in
d. M Measuring tape B 100% Drawings -
holes before concretinq.
Signature
11.0 CONCRETING:
Drawing & technical
11.1 Checking of Layout and program of concreting. V Leveling Instrument B Drawing L6,L7
specification
11.2 Ensure followinq before concretinq:
Approved
Preliminary Tests are conducted for determining Compressive
a. T A Technical Test Certificate IS 456 L05 Protocol
design mix for required strength. Testing M/c
Specification
Cement water and aggregate content as per mix Weigh Batcher, IS 456
b. - B L18
desiqn. Measurinq Jar IS 10262
11.3 Check concrete for followinq:
The moisture content in both fine and coarse Measuring Jar Approved IS 456
L5,L8,
a. aggregates before use and correct water cement M Oven, weigh B Technical IS 2386 Part III
L18
ratio wherever necessary. Balance Specification IS 1199 & Annexure II
Slump conel Approved IS 456
Workability of the concrete checked at frequent L5,L8,
b. compaction factor B Technical IS 2386 Part III
intervals by slump cone Test I compaction factor. L19
apparatus Specification IS 1199 & Annexure II
Ensure for continuous concreting and adequate
11.4 P - B 100% IS456 -
quantity of constituents.
Signature
Temperature is above
Stripping time of formwork is strictly regulated as
f. P - B 1 IS 456 Logbook 200 C and ordinary
follows in normal circumstances: cement is used
Signature
Signature
14.0 DRAINAGE:
Ensure that all pipes, fittings & fixtures are as per
14.1 V - B 100% -00- Logbook
relevant code.
15 PLASTERING:
Check for proper Cement -Mortar proportion, Drawings, IRC Technical
16.1 VIM - C 100%
cleaninq, hackinq, etc. Specifications
Ensure that the plastering of brick walls shall be
16.2 of min. 18mm thick for outside and 12mm for VIM Steel tape C 100% -00- Protocol
inside
Ensure that the plastering of concrete ceiling is
16.3 VIM -Do- C 100% -00-
6mm thick (min) mortar.
Check for grooves, openings, rounding of
16.4 VIM - C 100% -00-
corners hollows in plaster.
Curing of plastering surfaces is carried out for 7
16.5 VIM - C 100% -00-
days minimum.
16.6 Check Verticality of Plasterinq. VIM Plumb Bob B 100% -00-
Drawing I Technical
16 PAINTING: VIM Elkometer B 100% Protocol
Specification.
16.1 Check for followinq:
- Color, Shade I Brand
- Surface Preparation
- Number of coats
- Curinq if any
- Final finish (OFT)
Signature
Signature