You are on page 1of 10

Doc. No.

BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 17 Jan 2024
Page No. 1 of 7

Engineering, Procurement and Construction


of
Water Treatment Plant & Sewage Treatment Plant
for
Bangladesh Special Economic Zone

Work Method Statement for Painting work for steel


structure, support, cable tray, equipment and piping Works

FOR CONSTRUCTION

FOR
00 17/01/2024
CONSTRUCTION
MR. MEHADI MR. LOOKMAN MR. TRUNG
REV. DATE ISSUE PURPOSE PREP’D CHK’D APP’D
Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 17 Jan 2024
Page No. 2 of 7

Contents
1. Purpose ................................................................................................................................................................. 3

2. Scope of Work ...................................................................................................................................................... 3

3. Duties and Responsibilities................................................................................................................................... 3

4. Organization chart ................................................................................................................................................ 4

5. Working area ........................................................................................................................................................ 4

6. Sequence of Painting work .................................................................................................................................. 4

7. Working tools ........................................................................................................................................................ 5

8. Material, specification, procedure. ...................................................................................................................... 6

9. Safety Requirement .............................................................................................................................................. 8


Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 3 of 7

1. Purpose
The purpose of this method statement is to define the standard work process for panting works to be
carried out at construction site related to mechanical and electrical work.

2. Scope of Work
This Method Statement is applying for steel tank, hod dip galvanized pipe touching-up, and steel
structural items includes platform, walkway, handrail, ladder, cable tray, pipe and pipe support, hoist
rail and other related mechanical and electrical work.

3. Duties and Responsibilities


The contractor shall execute painting works with designated items and follow the approved Paint MAR
In addition, the panting activities also should follow the manufacturer’s instructions.
Project Manager  Ensure that the method statement complies with client requirements, related
specification documents, and manufacturer’s instructions.
 Submit method statement to consultant for approval.
Construction  Monitor implementation of this method statement and ensure the works are
Manager carried out with accordance to project Technical Specification.
 Co-ordination of testing with consultant (if required).
 Coordination with the QA/QC Manager for monitoring, coordinating and
controlling of all the painting activities.
QA/QC Manager  The QA/QC Manager is responsible to verify the proper implementation of
the quality systems and to implement quality control activities related to
erection.
Site Engineer  Ensure operatives follow to Method Statement.
 Give necessary instructions on site.
 Ensure that correct materials are used.
Supervisor  Direct workers as requested by the engineer.
 Ensure operatives are working in accordance with method statement.
Operatives  Carry out work as directed by the Charge Hand / Supervisor& Engineer.
Safety Officer Reporting
 The Safety officer is to report to Safety Manager.
Main Responsibilities
 Liaise with Safety manager & Consultant to make sure the safety system
complies With Project HSSE Control Plan.
 Organize site safety system.
 Prepare safety training to all staff and workers who working on site prepare
safety risk assessment.
 Analyze all safety information; records to raise and recognize new risks and
hazards may occur during construction period.
 Attends all Safety Meeting.
Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 3 of 7

4. Organization chart

5. Working area
The painting activities can be carried out in the workshop, and / or at the erection/installation areas.

6. Sequence of Painting work

Surface Paint Primer Dry up Top Coat


preparation Preparation painting paint

Ready to Use Dry up


Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 5 of 7

7. Working tools

The tools are used for painting works include:


Wire brush – for cleaning/surface preparing.

Sand paper – for cleaning/surface preparing.

Roller – for paint applying.

Thickness gauge – To measure dry firm thickness


Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 6 of 7

8. Material, specification, procedure.

Paint layer thickness


The paint layer thickness and coating color must be in accordance with the Material
Approval forEquipment and Steel Structural paint BSEZ-(PCCL-GKB)-MAR-081 as
below:

Note: All paints MAR should be approved for use


Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 7 of 7

Paint Colors

The paint type needs to comply with BSEZ-(PCCL-GKB)-MAR-081, the paint type
attached to this Method Statement. Or other approved paint for the project.

Doc.No BSEZ-CETP (PCCL-GKB)-LI-012


COLOR OF COATING Revision 0
Date 16/10/2023

No. Description Color Shade Painting system Remarks

Equipment included equipment base (Pump /


1 Agitator / Air compressor / Air Dryer Manufacturer's Standard None
/Dehydrator /
Air blower / Filter / Cooler, etc.)
Equipment Manufacturer's Standard
FRP Tank, PE tank None
Steel Tank Light Grey Following painting spec. BSEZ-CETP (PCCL-GKB)-LI-011

Valve, Y-Strainer, Flexible Joint, etc. Manufacturer's Standard None


Flowmeter / Level Switch / PH Meter Manufacturer's Standard
2 Instrument None
/ Pneumatic Valve / Solenoid Valves
Manufacturer's Standard
Galvanized Steel pipe None
Touch up for Galvanized Steel pipe Zinc Color Following painting spec. BSEZ-CETP (PCCL-GKB)-LI-011
3 Piping Stainless steel pipe Manufacturer's Standard None
UPVC, HDPE Manufacturer's Standard None
Structure/Platform/Walkway Light Grey Following painting spec. BSEZ-CETP (PCCL-GKB)-LI-011

Handrail Light Grey Following painting spec. BSEZ-CETP (PCCL-GKB)-LI-011

Ladder Light Grey Following painting spec. BSEZ-CETP (PCCL-GKB)-LI-011


4 Steel Structure
Pipe rack Light Grey Following painting spec. BSEZ-CETP (PCCL-GKB)-LI-011

Pipe Support Light Grey Following painting spec. BSEZ-CETP (PCCL-GKB)-LI-011

Hoist rail Light Grey Following painting spec BSEZ-CETP (PCCL-GKB)-LI-011

Control Panel Manufacturer's Standard None


Local Panel Manufacturer's Standard None
Instrument Panel Manufacturer's Standard None
5 Electrical
Solenoid Valve Box Manufacturer's Standard None
Touch up for galvanized steel part Zinc Color Following painting spec. BSEZ-CETP (PCCL-GKB)-LI-011

Painting Method

When preparing the surface, priming, and coating, it is necessary to pay attention
to environmental conditions and the time between two coats of paint. These
conditions must comply with the paint manufacturer's instructions.

Surface preparation:

Remove any oil, grease, dirt and any other contaminants from the surface before
painting by proper method as such as wiping with acetone, soap, washing with
clean water.

Using Steel brush cleaning to St3, etc.

Cleaning the weld joint: The weld surface must be grinded smooth with a grinder.
Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 8 of 7

All weld rust needs to be removed. Use a steel brush to clean the weld.

Application conditions

The surface should be adequately clean and dry. Do not apply when relative
humidity is above 90 %. The surface temperature should be at least 3℃ (5℉)
above the dew point to prevent condensation. In confined areas, ventilate with
clean air during application to assist solvent evaporation.

Painting work needs to be carried out between 9A.M and 5P.M. When weather
conditions are suitable (dry).

Mixing

Epoxy paint is a type of paint with 2 components. It is necessary to mix the two
components according to the manufacturer's recommended ratio before painting

Thinning

Thinner consumption may vary depending upon site conditions. Recommended


thinning rate: Max. 5% (by Volume).

Thinner type, need to follow the paint manufacturer's recommendations

Method of application

Roller or Brush is used to apply paint to the metal surface that needs to be painted.
For brush application: Use only for small areas or touch-up coating.

During the application, continuous agitation is required to prevent the


sedimentation of zinc powder.

Drying time

It is necessary to follow the paint manufacturer regarding the waiting time


between coats of paint as well as the waiting time for the painted materials to be
loaded and used.

However, the parameters recommended by the manufacturer are the results from
laboratory tests done under standardized conditions. Thus, actual times may be
different due to environment situations such as weather, wind and humidity, etc.

9. Safety Requirement
The local laws of safety and environmental protection shall be followed. All
persons on-site and in works areas shall wear appropriate personal protective
equipment. The site shall be kept in a clean, clear, and uncluttered condition, free
Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 9 of 7

of obstructions and hazards, at all times. All materials and equipment shall be set
up properly, particularly on access routes. There will be hard-barricade and
warning signals around the painting area to prevent the entry of unauthorized
personnel. All engineers, staffs, and workers shall wear full shirts or jackets. In
contrast, general safety will cover the following;

 Induction training
 PTW
 Ensure PPE
 Housekeeping
 Daily TBM
Etc. as per the project HSSE Control Plan.

Material Handling and Usage


- In the wet state, this product is highly inflammable. In case of fire, blanket
flames with foam, carbon dioxide or dry chemicals.
- Keep away from sources of ignition. No smoking.
- Keep container tightly closed and keep out of reach from children.
- Do not breathe vapour / spray. Applying paint to large surface areas under
closed environment should use air supplied breathing equipment. For small
areas or short periods, a suitable mask should be worn.
- Inhalation: Remove to fresh air, loosen collar and keep patient rested.
Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 10 of 7

- Ingestion: In case of accidental ingestion. DO NOT INDUCE VOMITING.


Seek immediate medical attention.
- Avoid contact with skin and eyes. Wear suitable protective coating such as
overalls, goggles, dust masks and gloves. Use a barrier cream.
- Eyes: In the event of accidental splashes, flush eyes with water immediately
and obtain medical advice.
- Wash skin thoroughly with soap and water or approved industrial cleaner. DO
NOT USE solvent or thinners.
- Care must be taken when transporting paint. Keep container in a secure
upright position.
- Do not empty into drains or watercourses. Dispose of any paint waste in
accordance with the appropriate Environmental Quality Regulations.