The purpose of this method statement is to define the standard work process for panting works to be
carried out at construction site related to mechanical and electrical work.
2. Scope of Work
This Method Statement is applying for steel tank, hod dip galvanized pipe touching-up, and steel
structural items includes platform, walkway, handrail, ladder, cable tray, pipe and pipe support, hoist
rail and other related mechanical and electrical work.
4. Organization chart
5. Working area
The painting activities can be carried out in the workshop, and / or at the erection/installation areas.
7. Working tools
Paint Colors
The paint type needs to comply with BSEZ-(PCCL-GKB)-MAR-081, the paint type
attached to this Method Statement. Or other approved paint for the project.
Painting Method
When preparing the surface, priming, and coating, it is necessary to pay attention
to environmental conditions and the time between two coats of paint. These
conditions must comply with the paint manufacturer's instructions.
Surface preparation:
Remove any oil, grease, dirt and any other contaminants from the surface before
painting by proper method as such as wiping with acetone, soap, washing with
clean water.
Cleaning the weld joint: The weld surface must be grinded smooth with a grinder.
Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 8 of 7
All weld rust needs to be removed. Use a steel brush to clean the weld.
Application conditions
The surface should be adequately clean and dry. Do not apply when relative
humidity is above 90 %. The surface temperature should be at least 3℃ (5℉)
above the dew point to prevent condensation. In confined areas, ventilate with
clean air during application to assist solvent evaporation.
Painting work needs to be carried out between 9A.M and 5P.M. When weather
conditions are suitable (dry).
Mixing
Epoxy paint is a type of paint with 2 components. It is necessary to mix the two
components according to the manufacturer's recommended ratio before painting
Thinning
Method of application
Roller or Brush is used to apply paint to the metal surface that needs to be painted.
For brush application: Use only for small areas or touch-up coating.
Drying time
However, the parameters recommended by the manufacturer are the results from
laboratory tests done under standardized conditions. Thus, actual times may be
different due to environment situations such as weather, wind and humidity, etc.
9. Safety Requirement
The local laws of safety and environmental protection shall be followed. All
persons on-site and in works areas shall wear appropriate personal protective
equipment. The site shall be kept in a clean, clear, and uncluttered condition, free
Doc. No. BSEZ-(PCCL-GKB)-WMS-32
Rev. No. 00
Date 4th Jan 2024
Page No. 9 of 7
of obstructions and hazards, at all times. All materials and equipment shall be set
up properly, particularly on access routes. There will be hard-barricade and
warning signals around the painting area to prevent the entry of unauthorized
personnel. All engineers, staffs, and workers shall wear full shirts or jackets. In
contrast, general safety will cover the following;
Induction training
PTW
Ensure PPE
Housekeeping
Daily TBM