TEST 1
INSTRUCTION TO CANDIDATES
1. This question paper consists of four (4) questions.
2. Answer ALL questions in English.
3. Answer the question manually (hand drawn and written) on the Answer Sheet.
4. Start each answer on a new page.
5. Scan the answered Answer Sheet and create pdf file from the scanned images.
6. Rename the pdf file with your name (e.g., AINUL_BINTI_MOHAMMAD_2023XXXXX)
7. Return the Answer Sheet of pdf file on your respective SUG111 UFUTURE and
Google Classroom.
QUESTION 1
b) With the aid of diagrams, explain the terms of accuracy and precision.
(5 marks)
d) List four (4) criteria to provide the best survey during reconnaissance. (4 marks)
e) Identify three (3) differences between plane and geodetic survey. (6 marks)
QUESTION 2
QUESTION 3
Figure 1
(4 marks)
b) A leveling network has been carried out from TBM (26.800 m) at UiTM Seri
Iskandar, Perak. Based on data in table 1, find the followings:
i) Reduced level for each point using Rise and Fall method.
ii)The arithmetical checking
iii) Loop misclosure and the allowable tolerance using 5√n formula.
iv) Accuracy of the leveling work and justify the result.
Table 1
(15 marks)
c) The following observation data (Table 2) were extracted from a level field book.
Calculate and determine the missing observation data.
Table 2
BS IS FS HOC RL REMARKS
A=? 279.080 277.650 BM
2.010 277.070 IS1
B =? 278.070 IS2
3.370 0.400 C=? 278.680 CP1
2.980 279.070 IS3
1.410 D=? IS4
1.320 E=? 282.690 281.370 CP3
F=? 281.580 IS5
1.026 281.664 TBM
(6 marks)
QUESTION 4
a) Using the following data in Table 3, calculate the corrections and adjusted reduced level
for all change points and other features. The loop misclosure is 0.605 m.
Table 3
(10 marks)
b) State five (5) sources of errors that may contribute to the errors in levelling.
(5 marks)
c) The distance between point A and B was measured as 5.2 m on the ground. Find
the distance on the map if the scale is:
i) 1:10
ii) 1:200
iii) 1:600
(6 marks)
(4 marks)