You are on page 1of 3

Document No.

BEST INFRASTRUCTURE DEVELOPERS LLC BIS-QCP-014-FMT/004


*
Rev. No Date
Bitumen Extraction 03 02.05.2023
Project: Proposed New Filling Station at Al Hafer Bahla
Lab Sample Ref. No: AHB-BBC-01 RFI No:
Bituminous Base Coarse
Type of Material: Date of Sampling : 17.01.2024
(Class B)

Source of Material: Sample# 01 Date of Testing: 17.01.2024


Technician / Operator
Hari S Nair Spec. Ref. AASHTO T 164
Name:
Grain size distribution
Sieve size Retained Retained Passing
Bitumen Extraction JMF Limits
(mm) Wt. gm % %

Asphalt Gms 1941.8 25.0 0 0.0 100.0 100


Aggregate Gms 1860.0 19.0 49.7 2.7 97.3 91 -100
Cup + filler Gms 291.5 9.5 515.3 27.6 72.4 68 - 78
Cup Gms 282.3 4.75 877.3 46.9 53.1 50 - 58
Filler Gms 9.2 2.36 1208.2 64.6 35.4 33 - 41
Total aggregate Gms 1869.2 1.180 1379.9 73.8 26.2 20 - 36
Binder content Gms 72.6 0.600 1527.4 81.7 18.3 14 - 26
Binder content % 3.74 0.300 1623.4 86.8 13.2 8 - 20
Addition for unsolved
% 0 0.150 1695.9 90.7 9.3 7 - 12
binder
Total binder content % 3.74 0.075 1784.6 95.5 4.5 3.5 - 5.5
JMF requirement % 3.5 - 3.9 % Total 1869.2

Extraction & Gradation of Bituminous Mix

100
90
80
Passing Percentage

70
60
Actual Grading
50 Spec LL
40
Spec UL
30
20 JMF LL
10 JMF UL
0

0.0 0.1 1.0 10.0 100.0


Sieve in mm log

Sub Contractor (BIS) Main Contractor Client/Consultant

Name: Hari S Nair Name: Name:

Signature: Signature: Signature:

Designation: Sr. Lab Technician Designation: Designation:

Date: 17.01.2024 Date: Date:


Document No.
BEST INFRASTRUCTURE DEVELOPERS LLC BIS-QCP-014-FMT/005

Rev. No Date
Maximum Theoretical Specific Gravity of Bituminous
Mixtures 03 02.05.2023

Project: Proposed New Filling Station at Al Hafer Bahla


Lab Sample Ref. No: AHB-BBC-01 RFI No:
Bituminous Base Coarse
Type of Material: Date of Sampling : 17.01.2024
(Class B)
Source of Material: Sample# 01 Date of Testing: 17.01.2024
Technician / Operator
Hari S Nair Spec. Ref. AASHTO T 164
Name:
Test No. 1

Weight of Loose Mix A (gms) 1916 2208

Weight of Flask + Water B (gms) 15556 15557

Weight of Flask + Sample + Water C (gms) 16714 16860

Maximum Specific gravity (A/(A+(B-C) 2.528 2.441

Remarks:

Sub Contractor:
Main Contractor Client/Consultant
Best Infrastructure Developers LLC
Name: Hari S Nair Name: Name:

Signature: Signature: Signature:

Designation: Sr. Lab Technician Designation: Designation:

Date: 17.01.2024 Date: Date:


Document No.
BEST INFRASTRUCTURE DEVELOPERS LLC BIS-QCP-014-FMT/010
* Rev. No Date
Marshall Stability / Flow Value of Bituminous Mix 03 02.05.2023

Project: Proposed New Filling Station at Al Hafer Bahla


Lab Sample Ref. No: AHB-BBC-01 RFI No:
Bituminous Base Coarse
Type of Material: Date of Sampling : 17.01.2024
(Class B)
Source of Material: Sample# 01 Date of Testing: 18.01.2024
Technician / Operator
Hari S Nair Spec. Ref. MS 2
Name:
Mold number 1 2 3
Weight of oven dry sample in air W1 gms. 1250.1 1253.8 1252.5
Weight of specimen under water W2 gms. 725.3 726.9 728.0
SSD Weight of Specimen in Air W3gms. 1252.2 1256.2 1255.0
Volume of specimen. W3 - W2gms. 526.9 529.3 527.0
W1
Density of Specimen. W3-W2 2.373 2.369 2.377

Average Compacted Density of Specimen ( Gmb ) 2.373

Bulk Specific Gravity of Total Aggregate ( Gsb ) 2.667

Maximum Specific Gravity of Paving Mix ( GMM ) 2.528

Effective Specific Gravity of Total Aggregate(Gse) 2.679 (100-Pb)/(100/GMM-Pb/Gb)

Voids in the Mix V.I.M %. (1- Gmb/GMM)x100 6.1 Spec: 4 - 7 %

Voids in Mineral Aggregate of the compacted Mix V.M.A %. 14.4 Spec: 14 % min.

Bitumen Absorption (Pba) (1/Gsb - 1/Gse)xGbx100 0.17

Specific Gravity of Bitumen ( Gb ) 1.03


Effective Bitumen Content Pbe Pb-(PbaxPs/100) 3.57

Voids Filled with Bitumen V.F.B. (1-VIM/VMA)X100 57 Spec: 50 - 70 %

Stability kg (30 min and 24 hrs immersion) 1877 1816 1828

Average Stability kg 1840 Spec: 1200 kg min.

Loss of Stability (%) - Spec: 25 % max

Flow (mm) 2.6 2.8 2.8

Average Flow (mm) 2.7 Spec: 2 - 3.5 mm

% Filler by Weight of Aggregate 4.5

% of Bitumen in Mix (Pb) 3.74 Spec: 3.4 - 4.0 %

% of Aggregate in Mix (Ps) 96.26

Sub Contractor:
Main Contractor: Client/Consultant
Best Infrastructure Developers LLC
Name: Hari S Nair Name: Name:

Signature: Signature Signature

Designation: Sr. Lab Technician Designation: Designation:


Date: 18.01.2024 Date: Date: