You are on page 1of 5

Date of Sampling:

Date of Testing
4903yoLo 49t6 Weight of dry Sample (g)
Lacaton
Poposed
Uge
Cummulative Cummulative
Weghi Retained Cummulative Welght Percentage Retained Percentage Passing Remarks
(gm) Retalned (gm) (gm)% (gm%
(mm) loo
Grade
2300

06
035 39. 4S
20 Sand
39 4
Jo93o 2l8
Silt & Clay

Description ofmaterial Sleve Size (mm) Percentage


Coarse 75-20
Fne 204.75 03
Coarse 4.75-2.00

Medium 2.00-0.425 273


Fine 0.425-0.075

St &Cay Passing through 0.075 79-! 4

Name Client
PMC

Iype af Material Date of Sampling: 02 2 202


Souroe Date of Testing D31 2120 22
Lacaion Weight of dry Sample (g) So 9
Cummulative Cummulative
IS Sieve Weight Retained Cummulative Weight Percentage Retained Percentage Passing Remarks
(mm) Retained (gm) (gm)% (gm)%
(gm)
10
75.00 Grade
19.0
4.75
066 39.92
99.60
OA25 4-66
f393
93.07 Sand

Paa St & Cay

Dexcáption df material Sleve Size (mm) Percentage


Coare 75-20
Geade Fine 20-4.75
Coare 4.75-2.00
Medjum 2.00-0.42s S3-80
0.425-0.075
St &Clay Passing through 0.075
Seast
Nameure
eractor PMC Client
Volume
(cc)
oa0 %
6 6
Volume
(cc)
gS.34
86 2o39Q4:42 92:4
Qo39
sI93 OMCH.. e3
5 Jos 5
2o22
2202
o3 2022
62|2
Client 2022 Client
Q404 9961 6PSOMC=
Q.087 J"|4
2/2 204 9-S/ Qo9
4
3-|2
gm
gm
25-38 7277 2084 74S!
203
Sampling
ofDate
ofDateUse
toProposed
Testing Sampling
ofDate to
ofDateUse
Proposed
Testing 45
/834 23392:2S3-94 1833
2
26-2 g44 PMC
PMC
2
Remarks (A):
1979 2Q66 (A):
Mould Mould
gm/cc7So 879
of
W.
9o0 of 1
Paesing
Dannontaop
498+ W
Cummulative
gm gm gm gm gm gm gm
% gme Contractor Lol(o2 gm gm gm gm gm gm gm gm
gm/cc
eon
to %
(UM))FI(100+N)) +97o
(F=EM (M)I
FI(100+N)]
container
container 498 (F=EM)
Cummuative mould(E=D-A) x
[N=100
(M=K-H) [P=100x container
container
x
soil (L=K) moukd(E=D-A) [N=100
(M=KH)
content soil x
+ soi ofdensiy container
ofW. + + (L=J-K) (P=100
MaoftType
erial Mould sowet wet
No.
No.
Container sol soi water soi
Wofdry dendity
NMoisture
+
soil soil of WL
of
container
densityContainer + +
soil soil
content
water soi
wet dy No.
No.Trail
C|W.of of Material
ofType Moukd
No. wet wet wet dry dy dendity
SourceLocation of
W. W. of of of
W. W. W. Dry
M.D.D.=.
Signature
Trail
No.
of
Wt
of
W
of
W
of of of W.of
W. W. W.
Moisture MD.D...
Dry
Weight
ve Location Sigrature
B M P Name Souroe
(gm)
d D K L M Name
F G N P
Method of Test-Casagrande / Penetration
Date of Sampling: O . , 20 22
ample no.:
urceofSanole: Semple. B/A- 4A2 Sampled by:
Date of Testing:
Ocation
Job No:
Tosted by: Jointy
Liquld Limlt Plastic Limit
Description
eminaton Na 2 4
fblows Depth of Penetrationin mm 23 27 32
ainer No. 138 439 140 4
tof containoer() 24;22 24"2s 2497 25 -o 2 2454
ontaiher +wet material(We)S4. 4o 5l:55 s 2 s S3.21 29-3S 2 s o
t of container+dy material (W3) 4 33 45.14 46.|L 23-224-8
Nt of water(NeW) 6.1 4 03
ght ofdry mslerel(M6-Wh) 23.1| 20.49 21.97 22. lo 3.27
Content(F
W X100
29.85 20-22211s
Ple.T sesssee Average PL (%) 2069

Contractor PMC Client

Method of Test-Casagrande / Penetration


ample nO.:
Sub S doye Date of, Sampling: O2. |2. 2o 22
Source of Sample: SHe Semlle RJ-47 Sampled by:
ocaion: Date of Testing:
Lb Job No.:
2o22
Tested by: Jointly
Desciption Liquid Limit Plastic Limit
Delerminaion No. 2 2
No. of blowsDepth of Penetration in mm
23 24 32
Cortainer No,
Weght of ontainer (Wi)
24 642s. )8 2 . 3 2.4 48
Weght of container +wet material
(Wa)5o2S:)
Weight of contaáiner+dry material (Wa) -6.
4o 42.02
S42 S3.2)
44-33
Weght of water (WhW)
Weght df dry material (Wh-W) 22.24-
S.44
24-28 23.2s
WateerrContent (% W-Wh X100
12)122
W-Wh 2-24 223522.52, 23.ss

Pl sessaaesssea Average PL (%)


SlNaneanature
vontractor PMC Cllent
<oolu
Bignaturerepored CBR Corecded
CBR Corrected Load Load CBR- Note: Rate Wt P M K F S.No
(%)CBR Proving Period Type MDD: Location
Sample
LabNo. Source
Material
Type of
at et @
(Corected Graph of of [(MN)x100]
Compaction Moisture
of%
(G/{1+(o100)})content
dendity
Dry W. W.
W. W. DETERMINATIONContainer
MOISTURE
No. density
(EF)
WetVolume
60 2.5
mould of M. M. mould
CONDITION M.
SAMPLE OF
of casting MouldNo.
Type of
5.0 @2.5 Penetrationsurcharge of containerof
M.
mm mm unit unit INFORMATION
ring compacion ofGENERAL of of of of
of of
mmmm for soaking: dry water ry wet
wet wet
(%) (%) Load Load soil
(kg)1370
(kg) load Constant: soil soil
from from Unit (LJ)
(K-L) soil soil
used + t
Load/Standard vs container
container (D-C) +
graph graph 2055 Penetration 1.25 96
used: mould Dynamic
Static /
(kg):Hours Description
for for mm/minute Div. 1
5.0 2.5 Static/Dynamic
5 SoiC202- D)
mm mm kg g/cc
attached
unit
ntractor (kÍ) (k0)
load)x100

(g/ce) (%)
(9) (9) (9) (9) (9) (g/cc) (cc)
Penetration (9 (o)
12.5 10.0 7.5 5.0 4.0 3.0 2.5 2.0 :1.5 1.0 0.5
(mm)

OMC:
Proving
2621 reading 190 1
PMC 788 262-0 2-0224-392%62
/o:s2632167:2
7438s99 l07:23
2-34L8:SL lo00226
24-25 Soaking)
Moisture
(Before
22504720
883
392
43-62913
o1-0)93-2
LA20 25 363 Soaking)
(Before
Density
88y ringCorrected
260 Proposed
Testingcasting
Use toDate
% ofDateof
62128 LOAD Date
280 216 69 3420(Kg.) load 402/04 y733
4930
Fo24|6SI 730 of
PENETRATION Sampling
42262S 19 Proving 320
reading
3 2/022256
62/^ 786
ring Layer:
3&th
-0221202
206|/28 |23 93 TEST 6612
221
Clent 69 29 Corrected 201 nbornkDent
(Kg) load 22S0 1268 )
DATA
2:\6315
Moisture
(After
Scal 1S+ 2
Density
(Añer
Star 1222
25 29
readingProving 202 22S6
3 T3
ring
49
h164eT 424494

Trad 1
Docription Tat 2

erin ce (Ve)

in
Sol Keroensince(Vig
d

Selhder

Average% 22

Praposed to Lise
Dae of Sampirg
Dae of estirg
24 HiourE

Description Tral 1

di sol in Disiled Water


in cc (Va) 12
di So in
Kerosene in cc (Vk) Lo

VE100%
20

Average%

|Contract6r

You might also like