Professional Documents
Culture Documents
,
Development of road from Bannerghatta on SH-87 to Besthamanahalli on SH-35 ( Including Anekal Bypass,Grade separator
across Chandapura road and ROB across Railway line) Via Jigani, Haragadde and Indalwadi ( Km 0+000 to 22+980 ) in
Bangaluru,Package - 3B.
Project Management Construction : M/s.COS Consultancy Services, Bangaluru.
Contractor : M/s. KMV Projects Ltd. Bangaluru.
26.50 90-100
19.00 71-95
13.20 56-80
4.75 38-54
2.36 28-42
0.300 7-21
0.075 2-8
Pan -
60
50
40
30
20
10
0
0.01 0.10 IS Sieve in MM 1.00 10.00 100.00