GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

TECHNICAL DESIGN – FIREFIGHTING PUMP CALCULATION FOR Maryoutia(STATION 07) - NEW CP401
Rev. D
Ref.: A-401-S07-CAR-14-0001

Contractor Consultant For MEP Services

Station No. / Name.: Document Type:


Scale:
Station 07 ( Maryoutia ) N.T.S Report
Document Title:

Greater Cairo Metro Line (4) (New CP401)


FIREFIGHTING PUMP CALCULATION REPORT

Abd El-Hamid M. Motawakkel Mosaad Soliman


Magdy
D 21-09-2023 Detailed Design

Rev Date Prepared By Checked By Approved By Revision Description


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 1 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

TABLE OF CONTENTS

1. INTRODUCTION............................................................................................2

2. REFERENCE DOCUMENT ...........................................................................4

3. OBJECTIVES ..................................................................................................4

4. PUMP HYDRAULIC CALCULATIONS ......................................................5

4.1 HYDRAULIC CALCULATIONS DESIGN CRITERIA ...................... 6

4.2 HYDRAULIC CALCULATION .........................................................10

4.3 Hydraulic Calculations Summery .........................................................13

5. Tank Calculations: .........................................................................................54

6. Jockey Pump Calculations: ............................................................................55


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 2 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

1. INTRODUCTION
This report includes firefighting calculation for the Greater Cairo Metro Line 4 Phase New CP401
at (S07) Maryoutia Station.

1.1 Fire Fighting Design Concept

1.1.1 Fire Fighting Tank and Pumps


a. Firefighting source of water is always a 230-m3 tank with a full monitoring of the level of water
at low and high levels considering that the suction level in the fire tank shall be the same level
as the pump room level.
b. System is supplied through a Fire pump level set (One main electric pump, one standby electric
pump and a jockey pump) located at Concourse Floor.
c. Fire Department Connection shall be provided at above ground level and to be connected to
automatic wet hydrant system.

1.1.2 Fire Fighting Hydrant systems


a. System discharged from pump room through three lines as following:
- First line suppling the station Hydrant system (Wet System) with Alarm Check Valve.
- Second line suppling the sprinkler system (Wet System) with Alarm Check Valve.
- Third Line suppling the Tunnel system (Wet System) with Deluge Valve.
b. Hydrant and Hose Reels shall be provided running from the water tank and pump room to the
stations
c. Minimum standpipe diameter is 4 inch.
d. FDC shall be provided at above ground level and shall be connected to automatic wet hydrant.

1.2 Portable Fire Extinguisher

a. Portable Fire Extinguishers shall follow NFPA 10 Standard with two types (6kg CO2 & 6kg Dry
chemical Class ABC)

1.3 Automatic Sprinkler System

a. Automatic sprinkler system shall be installed in station throughout except technical rooms which
covered by Nitrogen.
b. Sprinklers K Factor will be taken as K-5.6 gpm/psi1/2
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 3 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

1.4 Fire Scenario:

a. Fire Scenario consider that fire will occur inside the station or inside the tunnel as per NFPA 130
bellow reference:

NFPA 130 Clause 4.4 & A.4.4.2 Describes Fire Scenario


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 4 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

2. REFERENCE DOCUMENT

2.1 Contractual Documents:

No. Contract Volume No. Documents Description

1- Volume 3  Section X : General Specifications


2- Volume 4  Section XI : Particular Specifications
3- Volume 5  Section XII : Drawings
4-  Section XIII : Data Book – General Project and Site
Volume 6
Information
5- INCEPTION REPORT  REF. R-401-S07-CAR-16-0001
6- Tunnel Drawings  REF. CM4P1-TD-DR—BST-S00-FPF-329010-JDC-S01

2.2 Code Reference Documents:

No. Contract Volume No. Documents Description

1- NFPA 13  National Fire Protection Association (Sprinkler Systems)


2- NFPA 14  National Fire Protection Association (Standpipe System)
3- NFPA 20  National Fire Protection Association (Fire Pumps)
4- NFPA 22  National Fire Protection Association (Tanks)
5- NFPA 5000  National Fire Protection Association (Life Safety)
6- Egy. Code  Egyptian Fire Code Part 1 & 4
7- CD  Civil Defense Requirements

3. OBJECTIVES

1- To Calculate the Firefighting pump flow rate and required head


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 5 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

2- To Calculate the Firefighting Tank Dimensions.

4. PUMP HYDRAULIC CALCULATIONS


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 6 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

4.1 HYDRAULIC CALCULATIONS DESIGN CRITERIA

4.1.1 Design criteria for Firefighting extracted from Civil Defense Letter as following:
This calculations is in full compliance to all civil defense comments issued at below referred letter.
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 7 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

Data 4.1.1 Civil Defense Letter for Tank Requirements

4.1.2 Density chart extracted from NFPA 13 as following:

Data 4.1.3 Extracted from NFPA 13 Density/Area based on Hazard Type

4.1.3 Design Criteria extracted from Contract Drawings as following:

Type of Hazard Ordinary Hazard (Group II)


Protection area per Sprinkler 12.1 m2
Sprinkler Temperature Rating 68 c (RED)
Sprinkler K Factor 5.6 gpm/psi1/2
Density 0.2 gpm/ft2
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 8 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

4.1.4 NFPA 14 Flow Rate Calculation Concept

Data Extracted From NFPA 14 (2019) Chapter 07

4.1.5 NFPA 13 Requirements for Hose Stream Allowance:


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 9 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

4.1.6 Hydraulic Calculations Concept

Calculations of firefighting system performed is in comply with NFPA 13 using Elite software and
following NFPA 14 direct instructions.

Calculations performed as following:

1.NFPA 13 Hydraulic calculations for sprinkler system based on area provided for Ordinary hazard

applications.

2. NFPA 14 Concept as a direct instruction for horizontal lines supplies three or more cabinets including

additional standpipe. (Refer to NFPA 7.4 & 14.7.10)

3. Tunnel Hydraulic calculations for the most remote area.


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 10 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

4.2 HYDRAULIC CALCULATION


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 11 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

4.2.1 Hydraulic Calculations following NFPA 14:

- As per previously attached instruction from NFPA 14 Ch.7 at point 4.1.3 needed flow rate for
three horizontal cabinets or more shall be 750 GPM

- Considering additional standpipe and following NFPA 14 item 7.10.1.1.5 the pump flow rate
shall be 1000 GPM as the building is fully sprinklered.
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 12 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

4.2.2 Hydraulic Calculations following NFPA 13

(Elite Software)
(Sprinkler Calculations)

(Axes Y01-Y03 & X01-X03)


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 13 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 14 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 15 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 16 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 17 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 18 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 19 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 20 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 21 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 22 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 23 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 24 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 25 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 26 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 27 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 28 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 29 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

4.2.3 Hydraulic Calculations following NFPA 13

(Elite Software)
(Tunnel Calculations)
(Tunnel Detailed drawings will be submitted separately)
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 30 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 31 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 32 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 33 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 34 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 35 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 36 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 37 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 38 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 39 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 40 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 41 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

4.2.4 Hydraulic Calculations following NFPA 13

(Elite Software)
(Hydrant In Station Calculations)
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 42 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 43 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 44 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 45 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 46 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 47 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 48 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 49 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 50 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 51 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 52 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 53 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 54 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

4.3 Hydraulic Calculations Summery

Flow Pressure

Sprinklers Calculations 500 GPM 92.92 PSI -

Tunnel Calculations 750 GPM 61.92 PSI -

1000 GPM Calculations 1000 GPM 91.47 PSI -

Selected Pump
Including 20% Safety 1000 GPM 116 PSI SELECTED
Factor

5. Tank Calculations:

 Pump Flow Rate = 1000 GPM.

 Tank Storage Duration = 60 Minutes.

 Tank Storage = Pump Flow Rate x Storage Duration = 1000 x 60 = 60,000 Gal = 227

m3 .
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 55 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

6. Jockey Pump Calculations:

 Jockey pump Calculations shall follow NFPA 20 & NFPA 20 Handbook guide lines

Requirements (Below Shot):

Pressure calculations guideline Extracted From NFPA 20

Flowrate calculations guideline Extracted From NFPA 20


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

Page 56 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D

Flowrate calculations guideline Extracted From NFPA 20 Handbook

- Jockey Pump Pressure = Fire pump Head + 10 PSI = 116 PSI + 10 PSI = 126 PSI

- Minimum Jockey Pump Flow Rate = Fire pump flow x 0.01 = 1000 GPM x 0.01=10 GPM

- Jockey Pump Flow rate Assumed to be 25 GPM. (Based on Market Availability)