Professional Documents
Culture Documents
TECHNICAL DESIGN – FIREFIGHTING PUMP CALCULATION FOR Maryoutia(STATION 07) - NEW CP401
Rev. D
Ref.: A-401-S07-CAR-14-0001
Page 1 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
TABLE OF CONTENTS
1. INTRODUCTION............................................................................................2
3. OBJECTIVES ..................................................................................................4
Page 2 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
1. INTRODUCTION
This report includes firefighting calculation for the Greater Cairo Metro Line 4 Phase New CP401
at (S07) Maryoutia Station.
a. Portable Fire Extinguishers shall follow NFPA 10 Standard with two types (6kg CO2 & 6kg Dry
chemical Class ABC)
a. Automatic sprinkler system shall be installed in station throughout except technical rooms which
covered by Nitrogen.
b. Sprinklers K Factor will be taken as K-5.6 gpm/psi1/2
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 3 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
a. Fire Scenario consider that fire will occur inside the station or inside the tunnel as per NFPA 130
bellow reference:
Page 4 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
2. REFERENCE DOCUMENT
3. OBJECTIVES
Page 5 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
Page 6 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
4.1.1 Design criteria for Firefighting extracted from Civil Defense Letter as following:
This calculations is in full compliance to all civil defense comments issued at below referred letter.
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 7 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
Page 8 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
Page 9 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
Calculations of firefighting system performed is in comply with NFPA 13 using Elite software and
following NFPA 14 direct instructions.
1.NFPA 13 Hydraulic calculations for sprinkler system based on area provided for Ordinary hazard
applications.
2. NFPA 14 Concept as a direct instruction for horizontal lines supplies three or more cabinets including
Page 10 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
Page 11 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
- As per previously attached instruction from NFPA 14 Ch.7 at point 4.1.3 needed flow rate for
three horizontal cabinets or more shall be 750 GPM
- Considering additional standpipe and following NFPA 14 item 7.10.1.1.5 the pump flow rate
shall be 1000 GPM as the building is fully sprinklered.
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 12 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
(Elite Software)
(Sprinkler Calculations)
Page 13 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 14 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 15 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 16 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 17 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 18 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 19 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 20 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 21 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 22 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 23 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 24 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 25 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 26 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 27 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 28 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 29 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
(Elite Software)
(Tunnel Calculations)
(Tunnel Detailed drawings will be submitted separately)
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 30 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 31 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 32 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 33 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 34 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 35 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 36 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 37 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 38 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 39 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 40 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 41 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
(Elite Software)
(Hydrant In Station Calculations)
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 42 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 43 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 44 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 45 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 46 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 47 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 48 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 49 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 50 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 51 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 52 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 53 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 54 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
Flow Pressure
Selected Pump
Including 20% Safety 1000 GPM 116 PSI SELECTED
Factor
5. Tank Calculations:
Tank Storage = Pump Flow Rate x Storage Duration = 1000 x 60 = 60,000 Gal = 227
m3 .
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401
Page 55 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
Jockey pump Calculations shall follow NFPA 20 & NFPA 20 Handbook guide lines
Page 56 of 56
FIREFIGHTING CALCULATION FOR Maryoutia (STATION 07)
Rev. D
- Jockey Pump Pressure = Fire pump Head + 10 PSI = 116 PSI + 10 PSI = 126 PSI
- Minimum Jockey Pump Flow Rate = Fire pump flow x 0.01 = 1000 GPM x 0.01=10 GPM