REVIEWED DOCUMENT DATA CRS DATA

Project Name Transmittal Ref. # Revision

Reviewed with comments - Revise and resubmit. Work may proceed subject to incorporation of
Transmittal Title Status Code: 00A
comments;
Status
Document Number CRS Prepared by:
Code

Department(s) Involved All CRS Reviewed by: All Disciplines C

Transmittal Received Date by ITBA CRS Checked by:

Transmittal Respond Date by ITBA CRS Approved by:

Status codes : Initials:


A: Reviewed - Work may proceed;
B: Reviewed with comments - Revise and resubmit. Work may proceed subject to incorporation of comments;
C: Objection - Revise and resubmit. Work may not proceed; AR - Abdullah Al Rashed
D: Review not required, or comment superseded FA - Firas Alosaimi
NA: Not applicable

Status
ID Document Re. / Drawing No. On Discipline Subject OTCE Comments Originator Reneco Response Originator Status Code OTCE Reviewer 2nd Response Status Code Reneco Response (Open/Close)
BCR
- ENGINEERING - - - - - - - - - - - -

* The VRV System outdoor machine capacity is missing in layout and also missing
the indoor capacity in the layout. *
Indoor Unit for VRF System refrigrent piping is not good distribution.
AC01-GF - - Mechanical Mechancial HVAC Plan Ground Floor * The
Lobby 1 return air diffuser is missplaced.
*In the Heat Exchanger Distribution of diffuser is not arranged in proper manners.

* Cold Water Supply Pipe not arranged in good manners and also their sizes is
missing.
* Hot Water Supply pipe sizes also missing.
PL01-GF - - Mechanical Mechancial Plumbing Layout Ground Floor * Water supply pump or tank is missing.
* Location of tank amd pump room is missing.
* Arrangment of hot and cold water supply is
wrong.

* Gray water network not design in proper manners.


* Gray water network sizes are also missing.
* Connection from Floor drain to gray water network is wrong.
DR01-GF - - Mechanical Mechancial Drainage Layout Ground Floor * Angle of gray pipe is wrong connected.
* Sizes of Air Conditioning drain network pipe is
missing. * Black Water Pipe sizes is missing.

CBM
- ENGINEERING - - - - - - - - - - - -

* Indoor Unit sizes missing and their specifications.


* Some diffuser is missplaced.
HVAC01 / HVAC02 Mechanical Mechancial HVAC Plan Ground Floor and First floor * Details is missing in all AHU and VRV System.
* Heat exchanger machine details is missing in layout.
* Cold Storage room dicription is missing in layout.

* Cold Water Supply Pipe not arranged in good manners and also their sizes is
missing.
* Hot Water Supply pipe sizes also missing.
PL01_A1 Mechanical Mechancial Plumbing Layout Ground Floor and First Floor * Water supply pump or tank is missing.
* Location of tank amd pump room is missing.
* Arrangment of hot and cold water supply is
wrong. * Many of pipe details is missing in layout.

* Gray water network not design in proper manners.


* Gray water network sizes are also missing.
* Connection from Floor drain to gray water network is wrong.
DR01_A1 Mechanical Mechancial Drainage Layout Ground Floor and First Floor * Angle of gray pipe is wrong connected.
* Sizes of Air Conditioning drain network pipe is
missing. * Black Water Pipe sizes is missing.

IBU - AB
- ENGINEERING - - - - - - - - - - - -

* Condencing unit all details missing in layout. *


Condensing unit diffuser deatails is also missing in layout. * Volum
damper is missing. *
AC01_A0+ Mechanical Mechancial HVAC Plan Ground Floor and First floor Locker room ventilation layout is missing. *
Arrangment of diffuser not good manners.

* Cold Water Supply Pipe not arranged in good manners and also their sizes is
missing.
* Hot Water Supply pipe sizes also missing.
* Water supply pump or tank is missing.
PL01_A0+ Mechanical Mechancial Plumbing Layout Ground Floor and First Floor * Location of tank amd pump room is missing.
* Arrangment of hot and cold water supply is
wrong. * Many of pipe details is missing in layout.

* Gray water network not design in proper manners.


* Gray water network sizes are also missing.
* Connection from Floor drain to gray water network is wrong.
* Angle of gray pipe is wrong connected.
DR01_A0+ Mechanical Mechancial Drainage Layout Ground Floor and First Floor * Sizes of Air Conditioning drain network pipe is `
missing. * Black Water Pipe sizes is missing.
* Rain Water drain line arrangment is
not proper.

IBU - CD
- ENGINEERING - - - - - - - - - - - -
* Condencing unit all details missing in layout. *
Condensing unit diffuser deatails is also missing in layout. * Volum
AC01_A0+ Mechanical Mechancial HVAC Plan Ground Floor and First floor damper is missing.
* Arrangment of diffuser not good manners.

* Cold Water Supply Pipe not arranged in good manners and also their sizes is
missing.
* Hot Water Supply pipe sizes also missing.
* Water supply pump or tank is missing.
PL01_A0+ Mechanical Mechancial Plumbing Layout Ground Floor and First Floor * Location of tank amd pump room is missing.
* Arrangment of hot and cold water supply is
wrong. * Many of pipe details is missing in layout.

* Gray water network not design in proper manners.


* Connection from Floor
drain to gray water network is wrong. * Angle of gray pipe is
DR01_A0+ Mechanical Mechancial Drainage Layout Ground Floor and First Floor wrong connected. * Sizes of Air
Conditioning drain network pipe is missing. *
Black Water Pipe sizes is missing. *
Rain Water drain line arrangment is not proper.

IBU - EF
- ENGINEERING - - - - - - - - - - - -

* Condencing unit all details missing in layout. *


Condensing unit diffuser deatails is also missing in layout. * Volum
AC01_A0+ Mechanical Mechancial HVAC Plan Ground Floor and First floor damper is missing.
* Arrangment of diffuser not good manners.

* Cold Water Supply Pipe not arranged in good manners and also their sizes is
missing.
* Hot Water Supply pipe sizes also missing.
* Water supply pump or tank is missing.
PL01_A0+ Mechanical Mechancial Plumbing Layout Ground Floor and First Floor * Location of tank amd pump room is missing.
* Arrangment of hot and cold water supply is
wrong. * Many of pipe details is missing in layout.

* Gray water network not design in proper manners.


* Connection from Floor
drain to gray water network is wrong. * Angle of gray pipe is
DR01_A0+ Mechanical Mechancial Drainage Layout Ground Floor and First Floor wrong connected. * Sizes of Air
Conditioning drain network pipe is missing. *
Black Water Pipe sizes is missing. *
Rain Water drain line arrangment is not proper.

Incubation
- ENGINEERING - - - - - - - - - - - -

* Fresh air Performance duct all details missing in layout.


* Location of some Supply diffuser is missplaced and diffuser deatails is
also missing in layout.
INC_HVAC GF / FF Mechanical Mechancial HVAC Plan Ground Floor and First floor * Volum damper is missing.
* Retuen air diffuser Arrangment is
not good manners. * Chiller Water pump discription is
missing.

* Cold Water Supply Pipe not arranged in good manners and also their sizes is
missing.
* Hot Water Supply pipe sizes also missing.
* Reverse Osmosis water network piping sizes is also missing in
layouts.
* Reverse Osmosis system many discription is missing.
INC_PL_A0 Mechanical Mechancial Plumbing Layout Ground Floor and First Floor
* Arrangment of hot and cold water supply is wrong.
* Many of pipe details is missing in layout.
* Main line water supply pipe sizes is also missing.
* Many pump usning in Water softening and Osmoses but their
sizes and dicription is missing.

* Gray water network not design in proper manners.


* Connection from Floor
drain to gray water network is wrong. * Angle of gray pipe is
INC_DR_A0 Mechanical Mechancial Drainage Layout Ground Floor and First Floor wrong connected. * Sizes of Air
Conditioning drain network pipe is missing. *
Black Water Pipe sizes is missing. *
Rain Drain line is missing.

REA
- ENGINEERING - - - - - - - - - - - -

* Location of some Suplly diffuser is missplaced and diffuser deatails is also


missing in layout.
* Volum damper is missing.
* Deatails of some of AHU and heat exchanger is missing. *
HVAC_A0 Mechanical Mechancial HVAC Plan Ground Floor and First floor Branch Duct not drawn in proper manners. *
Airconditioning is missing in Kitchen area.

* Cold Water Supply Pipe not arranged in good manners and also their sizes is
missing.
* Hot Water Supply pipe sizes also missing.
* Water supply pump or tank is missing.
PL01-A0 Mechanical Mechancial Plumbing Layout Ground Floor * Location of tank amd pump room is missing.
* Arrangment of hot and cold water supply is
wrong. * Many of pipe details is missing in layout.

* Gray water network not design in proper manners.


* Connection from Floor
drain to gray water network is wrong. * Angle of gray pipe is
DL01-A1 Mechanical Mechancial Drainage Layout Ground Floor wrong connected. * Sizes of Air `
Conditioning drain network pipe is missing. *
Black Water Pipe sizes is missing.
* Rain drain line is missing.