Company Name: Date Time Occurred:

Calapan Power Corporation February 23,2022 1018H


Department: Location: Time Reported:
Operations CPGC Building 1020H

Document Title Nature of Incident: Reference No.:


DG 2 Unplanned Shutdown
Main bearing # 2 high temperature alarm

Overview :

 Unit No. : Dg#2


 Engine Load : 3,500 kw
 Percent Load : 63% shaft power
 Time Occurred : 1019H
 Date Occurred : 02-23-2022
Attending CRO Operator : J. Valdez
Attending EO Operator : JR Adarlo
Attending AO Operator : J. Calderon

Summary Report

This is to formally inform you about DG 2 unplanned shutdown 1018 H,


Due to Main Bearing # 2 high temperature alarm 85 Deg. C.

Reason for shutdown: Main bearing # 2 high temperature alarm for inspection.

Action taken
-Inform all superior
-Request inspection of MB # 2 for confirmation of alarm.
-Send unplanned report to ERC

Remarks:
-Arranged internal inspection to maintenance.
- Will give you update after inspection

Reported by: Noted by: Conformed by:


Jojo L. Valdez John M Agoncillo Alberto Limuran Jr
Operation Superintendent Plant Superintendent

CPGC/ SIPC File: Dept./ HR/ 201