MOS-005
REV. NO. B
PAGE NO 1 OF 2
1.0 Material
1.1 Building
Portable cabins Mobile crane N.A N.A
1.2 Equipment
Office equipment Manpower N.A Site office
First aid facilities Manpower N.A Site office
Toilet accessories Manpower N.A Site office
Fire extinguishers Manpower BOMBA Site office
Spilt air conditioner Manpower SHO Site office
1.3 Infrastructure
Electricity N.A N.A N.A
Water supply N.A N.A N.A
Phone and internet line N.A N.A N.A
Temporary septic tanks N.A N.A N.A
2.0 Plant/Machinery/Equipment
Mobile crane N.A N.A N.A
Works Procedure
REV. NO. B
PAGE NO 2 OF 2
REVISION HISTORY
Rev DCN No Description of Change Prepared by Approved by Effective date
No
A - New Release LOH BENG PING MOHD SHAHRIM 15/2/2015
NOTE: The details of change shall be documented in the DOCUMENT CHANGE NOTICE (DCN).